Project of the Government of Pakistan
Project Budget Number: PAK/98/005/01/NEX
Project Title: Support to Good Governance Group
Project Short Title: Support to G-3
Start Date: 15/10/1999
Estimated End Date: 15/10/2002
Executing Agent: NEX National Execution
Good Governance Group
Government Coop. Agent: Good Governance Group
Implementing Agent (s): National Execution (NEX) Good Governance Group
Project Site: National
Beneficiary Countries: Pakistan
LPAC Approval Date: 31 December 1998
UNDP Staff : Farhan Sabih
Total UNDP inputs for 3 year (Oct. 1999 – Oct. 2002) = $600,000 (Oct. 1999-Dec.2001: $500,000)
(Jan. 2002-Oct.2002: $100,000)
Brief Description: The purpose of this support is to enable the Good Governance Group, Government of Pakistan, to design and facilitate the implementation of a strategic governance reform programme. The project has three distinct but interrelated objectives geared to: (1) conclude and finalize the consultative process that has been supported during the preparatory phase of this project; (2) enable G-3 to achieve the specific outputs identified in the approved PC-1; and, (3) the identification and implementation of a selective governance reform agenda to be supported by UNDP. Due to resource allocation constraint, UNDP assistance to this project shall initially be for the period October 1999 to December 2001. Upon release of TRAC resources for the period beyond 2001, the remaining project budget for the period January 2002 to October 2002, shall be restored.
On behalf of Signature Date Name/Title
Government __________________ ________________ ____________________________
Executing Agent __________________ ________________ _____________________________
UNDP __________________ ________________
____________________________
TABLE OF CONTENTS
I. Background and Context *
I.a Problem to be Addressed *
I.b Host Country Strategies *
I.c Prior or Ongoing Assistance *
I.d Institutional Framework for the Sub-sector *
II.b Expected End of Project Situation *
II.c Project Strategy *
II.d Target Beneficiaries *
II.e Reasons for Assistance from UNDP *
III.b Counterpart Support Capacity *
VI. Inputs *
VI.b UNDP Inputs *
VIII. Risks *
IX. Prior Obligations and Prerequisites *
X. Project Review, Reporting, Monitoring and Evaluation *
XI. Legal Context *
Annex I Project Budget *
Annex II IMPLEMENTATION AND MANAGEMENT STRUCTURE *
Annex III JOB DESCRIPTION: NATIONAL PROJECT DIRECTOR *
Annex IV DRAFT JOB DESCRIPTION: PROJECT MANAGER *
Annex V DRAFT TERMS OF REFERENCE NATIONAL CONSULTANTS *
Annex V1 INDICATIVE TERMS OF REFERENCE INTERNATIONAL CONSULTANTS *
Annex VII PROPOSED LIST OF EQUIPMENT *
Annex VIII OUTPUT BUDGET *
Annex IX TENTATIVE WORK PLAN *
There is a strong realization in Pakistan that it stands at a turning point: If it is able to reform its governance structures it can start its journey to become a Newly Industrialized Country (NIC), but if it fails to do so Pakistan’s own national integration could come into jeopardy. State machinery at federal, provincial and local levels, judiciary, political institutions and various organs of the civil society require a thorough review. Pakistan needs a paradigm shift in its governance framework.
The present pattern of administration in Pakistan is based on a system evolved by the British, largely to suit the needs of colonial rule and protecting the state from the people. In the very nature of things, the system was a bureaucracy, efficient and competent but naturally limited in scope and outlook. It was an effective and flexible set-up mainly concerned with the collection of taxes and the maintenance of law & order. These still remain obligations of the state but the emphasis has now shifted to a planned action for promoting the social and economic welfare of the people. With the great expansion in the functions and responsibilities of the government, the tasks facing the administration have become larger in magnitude and far more complex and diverse. To achieve them, it is necessary to bring the people and the administration closer to each other in order to translate government policies into action.
It is generally acknowledged that governance structures have become outdated, weak and even counterproductive in some cases. This view about governance is shared both by leaders in power and by those in opposition. Intellectuals and writers portray a dismal picture of the functioning of the government. Civil servants themselves are critical of the performance of state institutions. And yet not much has happened to reverse the situation. Ironically, Pakistan has been struggling to grapple with this problem since its inception in 1947, which is reflected by the fact that so far a total of 26 Commissions or Committees etc. have been formed to look into this subject. Thus, there has been an average of approximately one such report for every two years of Pakistan's existence.
Neither sustained economic growth nor improvement in social services is possible without the restoration of good governance in the country. The crisis of governance has many features. At the most dramatic level is the breakdown of law and order, threatening the very life and livelihood of citizens because of crime, civic conflict and terror. The loss of public confidence in major state institutions (especially the police and security agencies), and in some cases even the criminalization of the latter further complicates the already grim picture.
The second major issue is the pervasive corruption in
the three branches of government; the executive, the legislature, and the
judiciary. The result is that none of the three branches acts as a check
upon the malfeasance of the other two. Absence of accountability and integrity
of the decision makers has imposed an enormous social, economic and political
cost to the society as a result of which social frustration feeds upon
and encourages civic violence, generalized dysfunctional behavior, and
involvement in criminal or terrorist activities.
A third issue is policy ineffectiveness, including for example the inability to raise revenues for the government, target policies to selected groups or regions, ensure that governmental assets are used and maintained efficiently, provide social services of adequate quality to citizens, regulate or monitor potentially hazardous economic activities, or generally protect the lives and livelihood of citizens. This inability results in a widening gap between announcements and results, and leads to an erosion of confidence in the government. Indeed, the greater the ineffectiveness, the higher is the propensity to make grandiose announcements.
Finally, as already mentioned, ad-hoc policy making contributes directly to economic instability and unpredictability, discouraging long-term investment, and encouraging lobbying and influence peddling.
Although the crisis of governance is generalized, it is neither insoluble nor is it attributable to an amorphous "culture of corruption". In order to find a way forward, it is necessary to understand the effects of bad governance and then formulate a vision and plan of action for good governance.
The effects of poor governance include:
Pakistan is extremely vulnerable to the economic and social effects of poor governance. Some elements of a vision of good governance in Pakistan grow out of a definition of governance that is focused on the use of political authority (leadership) and the exercise of control over society (justice), as well as the management of its resources (stewardship) for social and economic development.
The 9th Five Year Plan has placed particular emphasis on the need for good governance to ensure sustainable development. For the first time a separate chapter is proposed to be included in the Plan document, which provides a conceptual framework to relate governance and development. The GOP recognizes clearly that the management of the economic system should be a participatory activity, with a deliberate focus on the improvement of the poor communities, NGOs, and lower echelons of the government. Local government reforms will be the key element of the new system. The district set up would be strengthened and given more autonomy. It would thus bring the government to the doorstep of the public. A fair and quick legal and judiciary process and better quality of socioeconomic administration can only inspire confidence of the public in the system.
Consequently, much of the good governance reform package focuses on "making things work", namely changing the system of institutions and incentives that affect the behavior of public officials business entrepreneurs, and citizens. Besides the specific measures described in the areas identified above, across the board reforms are needed for the restoration of governance in the country. These reforms can be divided into the categories viz.; civil service reform, legal and judicial reform, legislative reform, decentralization, eradication of corruption, police reforms, local government reforms, taxation reforms, education reforms, health reforms, sports reforms, procedure simplification, anti-corruption and pro-integrity measures and the promulgation of a citizens charter. The conceptual entry point of this reform proposal is the principle of incentive compatibility. It starts with a pragmatic perspective on how to make the government more, responsive, efficient, and legitimate, rather than dwelling upon political moral or philosophical questions.
The Pakistan 2010 Programme aims to realize this vision. Its immediate goals are restoring governance, doubling per capita income, and ensuring equitable access to economic opportunity and quality social services. Six key enabling conditions are necessary to achieve the 2010 vision: (1) a sound system of governance with political stability and a reasonably competent and honest public service; (2) high investment in education and research; (3) a culture of high savings, investment and exports; (4) the ability to take advantage of emerging international opportunities; (5) responsible economic and financial institutions; and (6) collaborative partnerships between the government the private sector, and the citizens.
In keeping with the partnership approach, the Pakistan
2010 programme has not been developed in isolation. Rather, it is based
on extensive stakeholder consultations with a wide cross section of society;
academic scholars, journalists, NGO leaders, government officers, lawyers,
politicians, business leaders.
I.c Prior or Ongoing Assistance
UNDP assistance to the governance reforms process in Pakistan was initiated in 1994. It supported the creation of the original Institutional Reforms Group and its continuation and expansion as the Good Governance Group. The institutional support to the IRG and G3 has been the establishment of a Secretariat. During the preparatory phase and support to the implementation of a work plan whose major thrust has been an extensive consultative process at the national and sub-national levels. In addition to generating a substantive dialogue on the major governance issues in Pakistan this process has also identified opportunities for action and implementation of a reform process, which is proposed to be supported under the proposed project. The result has been that UNDP is clearly seen as a key supporter of the institutional reform process in Pakistan. Without UNDP assistance, the G3 would probably not have been formed in the manner it was.
UNDP currently provides assistance to the IRG/G3 through PAK/96/030: Management Development Programme. The objective of this preparatory assistance (PA) project is to support the design and implementation of policy, strategic and operational level initiatives for improving governance systems in Pakistan. The project has provided a catalytic input for designing most of the initiatives that have been launched independently under the Governance programme of UNDP. In addition, the following projects of the Governance Programme have a direct or indirect relationship with the possible outcomes of the workings of the G3.
Approved Projects:
The Good Governance Group:
The Good Governance Group has been set up by the Government for the development of reforms agenda for providing good governance. The objectives of the Good Governance Group are:-
(iii) Interact with international institutions responsible for institutional reforms and governance.
(iv) Identify institutional issues, which are hampering implementation of various government programs.
(v) Expansion and upgradation of management skills through appropriate institutional means, especially through development of modules based training and distance learning technology.
(vi) Modernization of the institutional reporting system based on critical indicators of sound governance.
The Task Force on Administrative Reforms:
The Task Force on Administrative Reforms has been set up under the chairmanship of Mr. Ahsan Iqbal, Deputy Chairman, Planning Commission, which has identified the following areas for improvement: i.) Performance Based Organization; ii.) Compensation & Incentives; iii.) Depoliticization, Modernization & Corporatization; iv.) Training and Change Process; v.) Devolution, Decentralization and Local Government; and vi.) Administrative Issues of managing large cities.
The Commission for Administrative Restructuring:
The Commission for Administrative Restructuring has been set up under the chairmanship of Syed Fakhar Imam, MNA, which is reviewing the Public Sector Organizations for rightsizing through Professionalization, Modernization and Corporatization.
In addition the following GOP departments, private sector and civil society organizations have direct relevance to the project activities:
The most fundamental obstacle to good governance in Pakistan is perverse incentives that reward behavior that is not conducive to the common good, which is self-seeking, inefficient dishonest or exploitative. The system of perverse incentives contributes substantially to the governance crisis and results in public functionaries fail to act in the public interest. A key feature of good governance is incentive compatibility, or ensuring that public functionaries are provided with incentives to act in the public interest. The system should ensure that citizens get the incentive to behave in a manner that supports the public interest in good governance - a manner in which they themselves probably wish to act most of all.
The growing and increasingly unmanageable inequality is an additional obstacle. The incidence of absolute poverty has risen in the 1990s to 30 percent of the population despite of an increase in income per capita of more than 200 percent since 1970, by far the highest rate in South Asia. The economic imbalance is also reflected in and perpetuated by the social structure. Unlike other South Asian neighbors, Pakistan's land ownership is still skewed despite three attempts at land reform.
To a much greater degree than its other South Asian neighbors, Pakistan’s history is marked by the discouragement of freedom of information and a vigorous non-profit sector. A lack of social cohesion in Pakistan has caused a severe gap between the modernizing, industrializing, westernizing elements of Pakistan's civil society, and the more traditional religious, "personal", rural elements. Such a diverse group of "visions" presents a significant challenge for good governance.
Pakistan's experience with respect to policy reform is clear: the identification of policy options is a good deal easier than the implementation of policy recommendations. Setting the right priorities and generating momentum for the implementation of good governance measures through early and achievable successes is critical. In its most basic terms, governance is about setting priorities and generating and using power to achieve these priorities.
Pakistan must develop a structure to set in motion certain processes from which sustainable and strategic governance reform can emerge. The process requires vision, commitment mobilization and action. To mobilize, a stakeholder consultative process is urged and specifically designed to identify, prioritize and sequence a governance reform process. From the consultative process, target areas for reform begin to emerge: where reform needs have been identified, where strong commitment to reform process has been expressed by stakeholders, where credible collaborative and consultative mechanisms can be devised to implement reforms, and where there is assured political support for the mechanism and the process.
In the backdrop of repeated attempts to diagnose the problem without proceeding to cure the disease, there is growing impatience about implementation. More and more people seem to be saying: "no more Commissions and Committees, please focus on implementation, because the malady and perhaps the solutions are by now fairly well known. Certain common themes appear to recur in the findings of various Commissions and Committees. These may be summarized as below:-
II.b Expected End of Project Situation
Capacity to propose public sector reforms and provide management consultancy to the government will have been enhanced within the Good Governance Group and its partner organizations.
To achieve meaningful, sustainable, administrative change, the GOP needs system-wide synergies and linkages for development of transparent and accountable management systems. A necessary precursor must be a strengthened, effective GOP-owned mechanism for organizing and implementing management development reform initiatives from within.
By the end of the present project, the Good Governance Group will have been enabled to contribute to and support a strategy for public sector management reform, leading to better problem-solving ability and accountability in National GOP organizations and offices. Provincial governments and mid-level managers will have benefited from G3 training and other support to facilitation of the institutional reform process.
The G3 will play a catalytic role to promote good governance
by identifying strategic elements of the broad (beyond the
public sector) governance reforms agenda, by sponsoring research
and analysis to support implementation of reforms and by monitoring
the implementation process. G3 would not take on direct implementation
responsibilities. The implementation of the proposed reforms would
be done through strategic linkages with partner organizations in the public,
private and civil society organizations. Suitable partnership arrangements,
with clear terms of partnerships between G3 and partner organizations,
will be developed by the project management and endorsed by the Review
Committee and UNDP.
Project impact will directly benefit national and provincial GOP policy decision-makers from official, bureaucratic, and academic sectors, GOP management development consultants and trainers, as well as a partner and civil society organizations that will be involved in the design and implementation of the reform process.
II.e Reasons for Assistance from UNDP
Governance and Poverty Eradication Link:
Poverty eradication is the primary goal of UNDP programmes. UNDP recognizes that sound governance is a precondition for poverty eradication. Sound governance provides people access to basic social services and productive assets. It promotes decentralized decision-making and strong local organizations that empower people and give them voice in matters affecting their lives, including management of resources. Globally UNDP invests significant part of its resources in governance programme, which is one of the global Program Themes. This project is relevant in this context of governance as being a primary means to achieve poverty eradication and sustainable development.
CCF and Governance Programme:
Governance is one of the three focus areas under the Country Cooperation Framework for the 1998-2003. The Objective of the Governance Programme is to "create an enabling environment within which the people of Pakistan can influence the direction and conduct of their governing institutions". The programme has four components: policy development, governing institutions, decentralization, and information and communications technology. The G3 which is engaged strategic reform initiates is most relevant to the policy development component of the CCF. This project also has synergic links with other projects of UNDP, such as PAK/96/011-Supporting Democratic Electoral Processes in Pakistan, PAK/97/010-Support to Parliamentary and Democratic Processes in Pakistan, PAK/97/021-Support to Government Information House and the proposed assistance to the Management Services Wing.
Links with the United Nations System:
According to the UN System document, Pakistan in the 21st century: A Renewed Alliance, "If there is one development issue that is quintessentially the Pakistani challenge, it is the issue of sound governance. The UN development agencies believe that the problems in this area are a common feature of development programmes throughout the country. By this token, a successful programme to address the issue of sound governance offers the solution to many of the other challenges outlined above". Thus improved governance, while providing a solution to many of the development problems of Pakistan, will also ensure effective and sustainable utilization of UN systems support to Pakistan. Certainly this project is an effort to address the governance issues in Pakistan at the policy and strategic level. The objectives and strategies of the Pakistan Governance Program and of this project reinforce and support the common theme of the UN System in Pakistan.
Gender Dimension of Governance:
The G3 also offers a good platform to incorporate the policy level gender dimensions of governance as reflected in the United Nations Pakistan’s Statement on Gender Issues in Pakistan and in the outline of the Gender Program under CCF. This project would enable the G3 to mainstream gender concerns in the design and formulation of governance reform proposals.
Links with Regional Governance Program and Sub-Regional Resource Facility:
This project has strong synergy with the Regional Governance Program (RGP) and with the Sub-Regional Resource Facility (SURF), which are based in the UNDP Pakistan office. These can provide complementary support to the project through exchange of learning experience and by establishing links with similar initiatives in the region, possibly by sponsoring policy-level missions for strategic advice to G3. The RGP and SURF can also act as a resource and information database that can provide comparative analysis tools and information to this project. The G3 could also benefit by joining the network of governance institutions and individuals being developed by RGP and SURF. The RGP is sponsoring the development of Governance Index (GI), as measurement tool of governance and other related issues within a country. The G3 can easily utilize the GI as a methodological tool for its analytical work.
Owing in part to the perceived neutrality of the UNDP, and to the implementing agency’s track record in governance development, a unique opportunity exists, favorable to the augmentation of Government’s capacity for systemic reforms. Additionally, since past support to the Good Governance Group has come from UNDP, prior assistance should be sustained and built upon in order to support the implementation of the reform package.
III.a Project Implementation and Management Arrangements
The G3 of the Planning and Development Division, Government of Pakistan will be the national executing agency of the project. The G3 Secretariat will serve as the project management unit of the project while the Director General of the G3 will be the National Project Director. The NPD will be assisted by the Project Manager who will be recruited under the project.
The Advisory Committee of the G3 will provide strategic direction to the activities of the project. The expanded TOR of the G3 Advisory Committee reflects its role in project implementation and management. It will endorse the annual work plan of the project and undertake periodic monitoring of the project activities. The G3 Secretariat will prepare quarterly progress reports of project activities and share these reports with UNDP and development partners.
The project implementation will be guided by the principles
and procedures for national execution described in the Project Cycle Operations
Manual (Volume I & II) Version 2.0.
III.b Counterpart Support Capacity
During the preparatory phase of the project the G3 Secretariat has demonstrated ample capacity to implement the G3 programme. In addition to coordinating with UNDP on project related matters, it has also shown strong organization and management capacity by organizing a series of workshops and seminars. It has also developed strong links with national counterparts and potential partner organizations. The Director General, MSW, who has extensive project management experience, heads the G3 Secretariat. Furthermore, adequate provision has been made in the approved PC-1 to provide professional and administrative support staff from the GOP resources. During the preparatory phase the G3 team has learned significantly about UNDP practices and procedures for project management and is now ready to take on responsibility for full implementation of the project.
A sustainable, national momentum of reform is established for development of sound governance as a means to the achievement of human development goals in Pakistan.
V. Immediate Objectives, Outputs and Activities
The main purpose of this support is to enable the Good Governance Group to design and facilitate the implementation of a strategic governance reform programme. While the mandate and agenda of the G3 is large and diverse, the UNDP support will focus primarily on selective governance reform agenda, which would relate to civil society and go beyond the confines of the public sector reforms. This does not in any way undermine the need for public sector reforms, which UNDP continues to support through other specific interventions, but to ensure that UNDP assistance is utilized to address the strategic governance issues.
The project objectives are split in three segments. These segments though distinct are highly inter-related and fall within the framework of this project. Segment one, which is covered under objective 1, relates to the conclusion and finalization of the consultative process that has been supported during the preparatory phase of this project. Segment two, which is covered under objective 2, is to enable the G3 to achieve the specific outputs which have been identified in the approved PC-1. The third segment, which is covered under objective 3, relates to the identification and implementation of a selective governance reform agenda to be supported by UNDP.
Following are the specific objectives, outputs and activities:
Immediate Objective I:
Support a consultative process involving key stakeholders, including civil society representatives in order to build a consensus on the reform agenda.
Success Criteria for Objective I: An agreed reforms agenda approved by the Government for implementation. During the preparatory phase of the project the G3 has carried out an extensive consultative process to identify the key governance issues and to develop a set of recommendations for actions. An outcome of this process will be an approved package of reforms.
Consolidated recommendations at the conclusion of the consultative process.
Output I.2
Governance reform package along with a proposed implementation strategy that involves civil society.
Output I.3
Approval of the proposed reform package by the appropriate
forum.
Support the achievement of G3 outputs, which are covered under the approved PC-1.
Success Criteria for Objective II: Performance indicators for selected public sector organizations developed; concerned officials trained to adopt client charter, modern reporting systems, and result-based performance evaluation systems. Print and electronic media fully utilized to advocate governance issues and awareness of reform process.
Performance indicators of Public Sector Organizations and of the reform process:
Activities II.1
Training modules for public servants related to change management:
Activities II.2
Client charter of public sector organizations:
Activities II.3
Modern Reporting System based on critical indicators of sound governance. The system will include: IT policy; guidelines for implementation of IT policy; and design of electronic government system:
Activities II.4
Support the implementation of selective strategic reform initiatives involving civil society, which will be agreed in advance between UNDP and GOP/G3.
UNDP will also assist the G3 in identifying resource mobilization opportunities through a network of interested donors to support the reform agenda that would be outside the scope of UNDP assistance.
Success Criteria for Objective III: The selective areas for UNDP assistance, as well as the related performance indicators, identified following the project approval through a participatory process involving key stakeholders. These reforms will be implemented through strategic linkages with partner organizations including civil society organizations. Key success indicators will be the design and implementation of specific reform proposals, partnership arrangements with public, private and civil society organizations and commitment of additional donor resources.
UNDP and GOP/G3 agreement on selective elements of the reform package to be implemented through UNDP support under the project. UNDP assistance will focus on reforms encompassing the civil society aspects of the governance reforms agenda.
Output III.2
Strategy of partnerships between G3, public sector, private sector and civil society organizations developed as a basis for sustained implementation and monitoring of the reform process.
Output III.3
Agreements with partner organizations including civil society for the implementation of the respective reform components.
Output III.4
Network of G3 partner organization including civil society established.
Output III.5
Implementation of selective reform agenda through partner organizations including civil society.
Output III.6
Output III.7
A network of donors initiated in support of different elements of
reform process.
The Government of Pakistan will contribute Rs.17.70 million for the FY period 1998-99 to 2000-01 from the budget provision of the Planning & Development Division to meet the salary and allowances of the G3 Secretariat staff, commodities and services including electricity and telephone bills and office rent. The G3 Secretariat will be drawn from within the existing Officers/Staff in the system and no fresh recruitment is contemplated.
The United Nations Development Programme will fund the project with a proposed budget of US$1,300,000. UNDP inputs will include:
Short-term international consultants will be required
to support the design and implementation of the strategic reform agenda.
Possible expertise would be change management, policy development, strategy
formulation and implementation management of governance reforms. Enclosed
Indicative TORs (Annex VI) will be elaborated by the NPD with the assistance
of the PM, when specific inputs in the reform formulation and implementation
have been identified.
Duty Travel:
Travel of UNDP and project counterpart for project related
implementation, coordination and monitoring activities.
Mission Costs:
A provision has been made for mid-term and terminal evaluation
of the project. This includes the mission costs of international/regional
and local consultants as well possible mission cots of UNDP headquarters
personnel in project reviews and evaluations, as appropriate.
National Professionals:
Short-term national consultants will be recruited to provide substantive support to the G3 in the design and implementation of the reform agenda. A Project Manager (draft job description at Annex IV) will be recruited to assist the NPD in the implementation of the project activities. Draft TORs for the proposed consultants are at Annex V. These TORs will be elaborated and additional TORs will be developed by the NPD on the basis of needs identified during the project implementation. A Gender and Development consultant (draft TOR at Annex V) will also be associated to provide strategic advice to G3 on gender-related governance issues.
A provision has been made for sub-contracts to support
the implementation of agreed activities under the project. This would include
possible sub-contract for the development and implementation of training
modules; sponsoring governance surveys and research studies; contracts
to implement components of the selective reform agenda under objective
3; development and implementation of communication strategies; and other
sub-contracts to be determined during the implementation of the project.
A provision for subcontracts has also been made for external audit at the
end of each financial year.
Training:
G3 plans to undertake extensive consultative process and
capacity building for the design and implementation of governance reforms.
Thus a provision has been made for study tours, group training, workshops
and seminars, in-service training and participation in project-related
national and international conferences and meetings. A series of workshops
and conferences will be organized as a part of consultative process to
generate ideas for reforms, information sharing of G3 activities, dissemination
of research and analysis sponsored by G3, and to promote networking of
G3 with other national and international organizations. The NPD, with the
assistance of the PM, will prepare a detailed training programme, with
proper costing, which will be incorporated in the regular work plan of
the project.
Procurement:
Equipment will be provided to enhance the technical and
operational efficiency of the G3 Secretariat. Office support equipment
including vehicles, computers, printers, photocopiers, multi-media projection
system, software packages; books and publications; stationary; and operations
and maintenance of UNDP funded equipment. Detailed list of proposed expendable
and non-expendable equipment is at Annex VII.
Reporting Costs Plus Miscellaneous:
An allocation has been made for the reporting costs and
sundry expenses which will include printing and dissemination of G3 reports
and publications, costs of e-mail/internet services for G3 and a provision
for Country Office Implementation Support services. This relatively large
component reflects one of the major activities of G3, which is to create
awareness of governance issues through documentation, publishing and dissemination
of G3 reports and publications.
Total UNDP Contribution US$ 600,000
Financial Management Tasks Undertaken by the Country Office. The Operations Division will undertake the following tasks as support services for nationally-executed projects: accounting and financial report preparation; advances of funds to projects for the project local expenditure account and settlement of these advances; disbursements by direct payment for goods and services procured by the country office; and arrangements for auditing of project accounts. Development Division personnel will assist project authorities in budget revision, re-phasing and expenditure forecasting and will monitor project expenditures. Procedures for the implementation of these responsibilities are described in PCOM Volume II, Chapter VI and VII.
Financial Management Responsibilities Undertaken by
UN Agencies. In the event that a UN Agency acts as implementing agency
on a nationally-executed project, the UN Agency will be responsible for
financial management of the budget included in the relevant Letter of Agreement
and will follow established UN-UNDP financial procedures.
Generally, the governance institutional environment in Pakistan has been unstable for most of 1900s. There have been several changes in the Government during this period. Even during individual government tenures the turnover rate among senior bureaucrats has been exceptionally high.
However, the survival of the IRG/G3 through three governments attests to the recognition of the institutional constraints that have plagued Pakistan’s development efforts in the past. UNDP made no overt attempt to encourage the government to continue the IRG. UNDP felt that it was best to let the present government decide for itself whether to continue the assistance programme. In the end, UNDP has ended up being associated with an activity that is clearly owned by the Government. The strong political commitment for the G3 backed by actual evidence of acceptance by the bureaucracy bodes well for the future.
The final risk is whether a set of reforms proposed by G3 is approved and effective implementation is initiated. This risk is not unique to this project but is applicable to the entire governance programme. However, there is enormous convergence in Pakistan society across all political affiliations that basic governance issues must be addressed or a traumatic institutional crisis will ensue.
As with all projects, which aim to influence a change
in the fundamental institutional framework of a society, the risks associated
with support to the G3 are far outweighed by the potential benefits. The
changes in rhetoric that are evident in the recent past indicate that this
is an idea whose time has come.
IX. Prior Obligations and Prerequisites
UNDP funds will be available for value added technical inputs to the G3 for the design and implementation of strategic reforms initiatives, which are mutually agreed between G3 and UNDP as priority initiatives. Equipment procured for the G3 secretariat during the preparatory phase will be adjusted against the equipment required for the full-scale project. G3 will confirm the availability and release of counterpart funding of the project. GOP will provide the required staff and resources to meet the operational cost (office rent, utilities, telephone, maintenance of office premises) of G3 secretariat. The G3 Advisory Committee will have been notified and it will endorse the project document before its approval by UNDP.
The project document will be signed by UNDP and UNDP assistance to the project will be provided, subject to UNDP receiving satisfaction that the prerequisites listed above have been fulfilled or are likely to be fulfilled. When anticipated fulfillment of one or more prerequisites fails to materialize, UNDP may at its discretion either suspend or terminate its assistance.
X. Project Review, Reporting, Monitoring and Evaluation
The Advisory Committee (AC) of the G3 will be responsible for the overall management of the project. The AC will meet on a six monthly basis to review progress of the project and to resolve major implementation issues. The G3 secretariat will prepare quarterly progress reports of the project, which will be reviewed by the AC in its six monthly meetings.
The NPD will be responsible to prepare and present the Annual Progress Report in the yearly Tripartite Review Meeting of the project. The Economic Affairs Division, the Executing Agency and United Nations Development Program will attend the TPR meeting.
In view of the strategic nature of the project, it is proposed that an independent mid-term and end of project evaluation of the project be conducted. The evaluations will be mainly focussed on the project design, implementation strategy, sustainability and impact. In addition the evaluation will focus on the implementation of reforms initiated by the G3. UNDP and NEX agency will determine the TOR for the respective evaluations.
The project will also be reviewed during the planned annual review of the governance programme and the triennial review envisioned in the CCF for Pakistan (1998-2003).
A yearly audit will also be conducted to meet the NEX audit requirements.
The legal context of UNDP-assisted programmes and projects in Pakistan is established by two major agreements: 1) the Convention on the Privileges and Immunities of the United Nations, given affect by Act XX of 1948 of the Pakistan Constituent Assembly (Legislative) and assented to 16 June 1948; and 2) the agreement between the Government of the Islamic Republic of Pakistan and the United Nations Development Programme concerning assistance under the Special Fund Sector of the United Nations Development Programme, signed by the parties on 25th February 1960.This Project Document shall be the instrument (therein referred to as a Plan of Operation) envisaged in article 1, paragraph 2, of the agreement between the Government of the Islamic Republic of Pakistan and the United Nations Development Programme concerning assistance under the Special Fund Sector of the United nations Development Program.
UNDP-assisted programmes and projects for Pakistan are planned and executed in accordance with the global UNDP Financial Rules and Regulations and the project Cycle Operations Manual for Pakistan.
The following types of revisions may be made to this project document with the signature of the UNDP resident representative only, provided he or she is assured that the other signatories of the project documents have no objections to the proposed changes:
Annex II IMPLEMENTATION AND MANAGEMENT STRUCTURE
(A) Advisory Committee Composition:
The Terms of Reference of the Advisory Committee are given below:-
G3 Secretariat is meant to provide support to the G3.
The Secretariat will function as the analytical arm of the G3 in directing
research, preparing documentation, dissemination and publishing reports
and organizing periodic meetings with various agencies.
Annex III JOB DESCRIPTION: NATIONAL PROJECT DIRECTOR
Background
The National Project Director (NPD) is the focal point for responsibility and accountability in a national executing agency/G3 for the UNDP-funded project. The NPD should be a staff member of the executing agency at the secretary or director-general level for most projects. While the NPD has many duties and responsibilities, his/her primary function is to ensure that project objectives are achieved and to supervise the Project Manager. Thus, the NPD position will be a part-time job in addition to the NPD’s regular work.
Duties and Responsibilities
Background
The Project Manager has responsibility for the operational management, implementation and monitoring of the project. The Project Manager is responsible for the day to day business of the project. He/she will actually plan, initiate and manage project activities under the direct supervision of the NPD.
Duties and Responsibilities
Annex V DRAFT TERMS OF
REFERENCE NATIONAL CONSULTANTS
A: TOR Gender and Development Consultant
The consultant will work under the overall guidance of the NPD. The indicative tasks and responsibilities are:
The consultant will be recruited on a retainer basis to provide services to G3 on the basis of quarterly work plan to be agreed mutually between G3 and the consultant.
Qualification:
B: TOR Consultant on Governance Reforms Policy and Strategy.
Three months.
Qualification:
Four months.
Qualification:
The consultant will assist the G-3 in the development of mission statement, performance standards for the public sector organizations in order to have performance based public sector.
Three months.
Qualification:
Four months.
Qualification
Three months.
Qualification:
Four months.
Qualification:
Three months
Qualification:
The Consultant will work under the overall guidance of the National Project Director. The indicative task and responsibilities are:
Qualification:
The consultant will work under the overall guidance of the National Project Director. The indicative task and responsibilities are:
Qualification:
C: TOR International Consultant on Development Communication
The consultant will work under the overall guidance of the National Project Director. The indicative task and responsibilities are:
Qualification:
D. TOR International Consultant on Department Performance Scrutiny
The consultant will work under the overall guidance of the National Project Director. The indicative task and responsibilities are:
Qualification:
E. TOR International Consultant on Local Government -
The consultant will work under the overall guidance of the National Project Director. The indicative task and responsibilities are:
Qualification:
2. Computer Pentium w/CD and Internet connectivity 4*1500 =$6000
3. Lazer Printers 2*500 =$1000
4. Colour Lazer Jet Printers 1*1500 =$1500
5. Scanner 1*1000 =$1000
6. U.P.S. 4*500 =$2000
7. Multi-Media plus Overhead Projector 1*8000 =$8000
8. Software Packages 4*500 =$2000
9. Photocopier 1*4000 =$4000
11. TV &VCR (1 each) =$1500
12. Binder and Cutter 1*500 =$500
(ii) Motorcycle 1*2000 =$2000
15. Books & Journals =$4000
Expendable
2. Maintenance/repairs of vehicles ($2000 per year) =$6000 Maintenance/operation/repairs of computers/photocopiers =$4500
4. Stationery & Office Supplies (@$1500 per year) =$3500
TOTAL PROCUREMENT $70,000
Good Governance Group
INPUT/OUTPUT TABLE
Oct - Dec 1999
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Inputs for project | Project Manager $3,000
Duty Travel (DSA etc) $2,000 |
|
Sundries:- $1000 | $43,000 | ||
| Output 1.1 Consolidation of Recommendations. | Inservice Training
(Conferences)
$ 10,000 |
$ 3,000 |
$13,000 | |||
| Output 1.2:-
Governance Reforms Package |
International Consultant
on
Information Technology One Month) $10,000/-
National Consultant Short term: 8,000
|
Study Tour
Of NPD $ 9,000 Conferences & Meetings: Meetings of Working Groups $1000. |
$ 28,000 | |||
| Output 1.3:-
Approval of the Reform Package |
Group/Inservice Training
$15,000 |
$ 15,000 | ||||
| Out put 2.6
Projection of Public Policy issues |
Printing of Newsletters & Journals $1,000 | $ 1,000 | ||||
| Total Year 1999 | $ 23,000 | $ 0 | $ 35,000 | $ 37,000 | $ 5,000 | $ 100,000 |
Good Governance Group
INPUT/OUTPUT TABLE
Jan-Dec 2000
|
|
|
|
|
|
|
|
|
|
Project Manager $12,000
Mission Cost $14,000 Duty Travel $5,000 |
|
|
|
$ 54,000 | |
| Output 1.3:-
Approval of the Reform Package |
National Consultant
Short-term consultant $4000 International Consultant on Performance Measurement $10,000. |
Group training
Study Tours of Chairman & secretary P & D Div. $ 20,000 Group Training $4,000 |
$ 38,000 | |||
| Out put 2.1
Identification of Key Reform Areas |
National Consultant
Short-term Consultant $6000 International Consultant on Departmental Performance Scrutiny $10,000/- |
Sub Contract
$25,000 |
In service Training
$13,000 |
$ 54,000 | ||
| Output 2.2
Performance Indicators |
Printing of
Guidelines
$1,000 |
$ 1,000 | ||||
| Output 2.3
Training Modules |
Printing of
Guidelines
$ 1,000 |
$ 1,000 | ||||
| Output 2.4
Client Charter |
Printing of
Guidelines
$ 1,000 |
$ 1,000 | ||||
| Output 2.5
Modern Reporting System |
Printing of
Guidelines
$ 1,000 |
$ 1,000 | ||||
| Output 2.6
Projection of Public Policy Issues |
International Consultant on Development Communication $ 10,000 | In service Training
$12,000 |
Printing of
Guidelines
$ 1,000 Printing of Newsletter & Journals $10,000 |
$ 33,000 | ||
| Out put 3.1
Development of Potential reform package. |
International Consultant on Local Govt. Quality Award $ 10,000 | Printing of Reports
$5,000 |
$ 15,000 | |||
| Out put 3.2
UNDP & GOP agreement |
Conferences & Meetings
$400 |
$ 400 | ||||
| Out put 3.3
Strategy for agreement |
Conferences & Meetings $400- | $ 400 | ||||
| Out put 3.4
Agreement with partner organizations |
Conferences & Meetings $400/- | $ 400 | ||||
| Out put 3.5
Network of G-3 Partner Organizations |
Conferences & Meetings $200/- | $ 200 | ||||
| Out put 3.6
Implementation of selective reform agenda |
Conferences & Meetings $200/- | $ 200 | ||||
| Out put 3.7
Co-financing Strategy |
Conferences & Meetings $200/- | $ 200 | ||||
| Out put 3.8
Network of Donors |
Conferences & Meetings $200/- | $ 200 | ||||
| Total year 2000 | $ 81,000 | $ 26,100 | $ 51,000 | $ 17,000 | $24,900 | $ 200,000 |
INPUT/OUTPUT TABLE
Jan – Dec 2001
|
|
|
|
|
|
|
|
|
|
Project Manager $ 12,000
Duty Travel $5,000 |
Audit $1,200 | $ 12,000 | Sundries $7,800 | $ 38,000 | |
| Output 2.1
Identification of Key Reform Areas |
National Consultant
Short-term consultants on performance indicators. $10,000 |
Sub-Contract
Performance indicators. $40,000 |
Group Training/Study
Tours
$ 30,000 |
$ 80,000 | ||
| Output 2.6
Projection of Public Policy Issues |
|
Printing of Newsletter & journals $ 8,000 | $ 8,000 | |||
| Out put 3.1
Development of Potential reform package. |
Conferences & Meetings $1000/- | Printing of Report
$ 8,000 |
$ 9,000 | |||
| Out put 3.6
Implementation of selective reform agenda |
National Consultant
Long-term Expert $4,000 |
In service Training
|
$ 64,000 | |||
| Out put 3.7
Co-financing Strategy |
Conferences & Meetings $500/- | $ 500 | ||||
| Out put 3.8
Network of Donors |
Conferences & Meetings $500/- | $ 500 | ||||
| Total year 2001 | $31,000 | $ 41,200 | $ 92,000 | $ 12,000 | $ 23,800 | $ 200,000 |
Good Governance Group
INPUT/OUTPUT TABLE
Jan – Sept 2002
|
|
|
|
|
|
|
Total Cost |
| Inputs for Project | Project Manager $ 9,000
Mission Cost $ 16,000 Duty Travel $2,000 |
Audit $1,200 | $4,000 | Sundries $1,800 | $ 34,000 | |
| Output 2.1
Identification of Key Reform Areas |
National Consultant
Short-term consultants on performance indicators.$1,000 |
Sub-Contract
Performance indicators. $10,000 |
Group Training/
Study Tour $ 11,000 |
$ 22,000 | ||
| Output 2.6
Projection of Public Policy Issues |
Printing of Newsletter & journals $ 4,000 | $ 4,000 | ||||
| Out put 3.1
Development of Potential reform package. |
National Consultant
Short-term Consultants. $2,000 |
Conferences & Meetings $1,000/- | Printing of Report
$ 6,000 |
$ 9,000 | ||
| Out put 3.6
Implementation of selective reform agenda |
In service Training
|
$ 30,000 | ||||
| Out put 3.7
Co-financing Strategy |
Conferences & Meetings
$500/- |
$ 500 | ||||
| Out put 3.8
Network of Donors |
Conferences & Meetings
$500/- |
$ 500 | ||||
| Total year 2002 | $ 30,000 | $ 11,200 | $ 43,000 | $4,000 | $ 11,800 | $ 100,000 |
| Grand Total | $ 165,000 | $ 78,500 | $ 221,000 | $70,000 | $ 65,500 | $600,000 |
GOOD GOVERNANCE GROUP
WORKPLAN
1999-2002
|
ACTIVITIES |
JAN – MAY* |
|
|
|
|
|
|
1999 |
|
|
|
|
|
|
G-3 | ||||||||||
|
Clearance of Project Documents from external LPAC and Advisory Committee |
G-3 & UNDP
|
|||||||||||
|
Creation of Posts for the G-3 project |
G-3 | |||||||||||
|
Requisitioning of staff for G-3 project |
G-3 | |||||||||||
|
Recruitment of staff for G-3 project |
G-3 | |||||||||||
|
Recruitment of Project Manager
|
|
|
||||||||||
|
Procurement of vehicles, equipment and furniture |
|
|||||||||||
|
|
|
* Approval and Initiation Phase: January – May 1999
Objective-I Consultative Process to build consensus
on the reforms agenda
| Output/activities |
JAN – MAY |
|
|
|
|
|
|
1999 |
|
|
|
|
| Output - I.1
Consolidation of Recommendations
|
|
|||||||||||
|
|
|||||||||||
|
Good Governance through Continuity of Economic Policies |
|
|||||||||||
|
TQM |
|
|||||||||||
|
Client Charter |
|
|||||||||||
|
New Millennium Governance Challenges |
|
|||||||||||
|
IT Policy |
|
|||||||||||
|
Gender and Governance Issue |
|
|||||||||||
|
Training Modules |
|
|||||||||||
|
xi. Civil Service |
|
|||||||||||
|
x. Performance standards and Mission Statement |
G-3 & Partner Organization | |||||||||||
|
|
|
|
|
|
|
|
1999 |
|
|
|
|
|
|
|
|||||||||||
|
3. Report Writing |
|
|||||||||||
|
4. Report Printing |
|
|||||||||||
|
||||||||||||
| Output
- I.II
Reforms Package with Proposed Implementation Strategy |
G-3 & Working Groups and Consultants | |||||||||||
|
Activities:
|
||||||||||||
|
|
|||||||||||
|
|
G-3 & working group & consultants | |||||||||||
|
|
G-3 & working group | |||||||||||
|
|
G-3 & working group & consultants | ||||||||||||
a. Efficiency Plan b. Business Excellence Practices c. Departmental Performance Scrutinies
|
G-3 & working group & consultants | ||||||||||||
| Output/activities |
JAN - MAY |
|
|
|
|
|
|
1999 |
|
|
|
||
|
Output-I.III Approval of Reform Packages |
G-3 & consultants | ||||||||||||
|
Study Tour: The Chairman, G-3 will visit relevant institutions in USA, UK, Netherlands and France to exchange experience relating to good governance and institutional reforms. The visit will take place in November 1999. The Chairman on his return will be in a better position to steer the activities of the G-3 towards the attainment of its objectives. |
|||||||||||||
|
2. Submission for approval to PM/Cabinet |
|
||||||||||||
|
3. Approval of reforms agenda |
PM/Cabinet | ||||||||||||
|
|||||||||||||
|
|||||||||||||
Objective-II "Supporting the achievements of G-3 Output"
| Output/ activities |
|
|
|
|
|
|
|
1999 |
|
|
|
|
|
Output – II.1 |
G-3 & Consult-ants | |||||||||||
| 2. Following five
key reform areas will be addressed on parallel basis for implementation:
II.2 Performance Indicators |
`` |
|||||||||||
|
`` |
|||||||||||
|
Printing Guidelines |
|
|||||||||||
|
Dissemination of Guidelines |
`` |
|||||||||||
|
|
G-3 Partner Organiza-tions | |||||||||||
| II.3 Training Modules |
- |
|||||||||||
|
G-3 Consultants | |||||||||||
|
Printing of Training Modules |
G-3 | |||||||||||
|
Dissemination of Training Modules |
G-3 | |||||||||||
|
iv. Orientation Courses |
G-3 Partner Organiza-tions | |||||||||||
| Output/ activities |
|
|
|
|
|
|
|
1999 |
|
|
|
|
| II.4 Client Charters |
- |
|||||||||||
| i.Preparing Guidelines | G-3 Consultants | |||||||||||
|
G-3 | |||||||||||
|
Exhibition of Client Charters at offices of government organizations |
G-3 Partner organiza-tions | |||||||||||
|
Media Projection of Client Charters |
G-3 Partner organiza-tions | |||||||||||
|
Orientation Courses for Public Servants |
G-3 Consultants | |||||||||||
| II.5 Modern Reporting System | ||||||||||||
|
i. Preparing Guidelines |
G-3 Consultants | |||||||||||
|
ii. Printing of Guidelines |
G-3 | |||||||||||
|
iii. Pilot Trials |
G-3 Consultants | |||||||||||
|
iv. Dissemination of Guidelines |
G-3 Partner Organiza-tions | |||||||||||
|
v. Orientation Courses |
G-3 Consultants | |||||||||||
| II.6 Projection of Public Policy Issues | ||||||||||||
|
G-3 Partner Organizations | |||||||||||
| Output/ activities |
|
|
|
|
|
|
|
1999 |
|
|
|
Responsibility |
|
Printing of Newsletters/Journals |
G-3 | |||||||||||
|
Orientation Courses |
G-3 Consultants | |||||||||||
Group Training led by Chief 2010 to visit relevant countries to share experiences on Pakistan vision-2010 with special rerference to governance issues |
||||||||||||
|
Study Tour
Study visit of Project Manager to relevant countries to share experiences relating to governance and institutional reforms |
||||||||||||
|
Study Tours |
Objective - III UNDP Support for Implementation of
Selective Reform Package
| Objectives/outputs/ | Jan-May | Jun | July | Aug | Sep | Oct | Nov | Dec
1999 |
2000 | 2001 | 2002 | Responsibility |
|
III.1. Development of following selective Potential Reform Package
|
G-3 Partner Organizations & Consultants | |||||||||||
|
III.2. UNDP and GOP agreement |
|
|||||||||||
|
III.3. Strategy for Partnership |
|
|||||||||||
|
III.4. Agreement with Partner Organizations |
|
|||||||||||
|
III.5. Network of G-3 Partner Organizations |
`` |
|||||||||||
|
III.6. Implementation of selective reform agenda |
|
|||||||||||
|
III.7. Co-financing Strategy |
|
|||||||||||
|
III.8. Network of Donors |
|
CALENDAR FOR CONSULTANCY, SUB-CONTRACTING AND STUDY
TOURS 1999-2002
|
|
JAN - MAY |
|
|
|
|
|
|
1999 |
2000 |
2000 |
MAR 2000 |
2000 |
2000 |
2000 |
2001 |
2001 |
2002 |
|
International
|
|
|
|||||||||||||||
|
National
|
* |
* |
+ |
+
* |
|||||||||||||
|
Sub-Contract
|
|||||||||||||||||
|
Study Tour & Group Training |
Note: + National Consultant for total 10 PM during the year 2001 & 2002.
* National Consultant for whole respective year