BRIEF ON

DROUGHT AFFECTED AREAS

THAR, KOHISTAN AND KACHHO

AREAS OF SINDH PROVINCE


 



 
 
 
 
 
 
 
 
 
 
 
 

BOARD OF REVENUE, SINDH
GOVERNMENT OF SINDH
MAY 2000

INTRODUCTION
 


Relief For The Drought Affected People Of The
Desert Area Of Thar And Arid Zone Of Kohistan


 


BASIC FACTS

The Thar region of Sindh is the largest desert area of Sindh with sub-Saharan conditions. It extends from the coastal area of the Runn and Kutch along the southern border with India to Sukkur covering an area of 19000 square kilometers. Kohistan area starts from the north of Karachi and moves along to Balochistan. The total area of this region is about 13,000 square kilometers. The following are some of the basic facts:

More basic facts are attached as Annexure "A".

LOSSES

Relief Measures Already Undertaken By Government
of Sindh Which Need To Be Continued

The Government of Sindh started its relief operations in September 1999 to provide emergent relief to the drought affected areas even before it started adversely affecting the people in the Thar region. Immediate measures were taken to strengthen logistics support, provide drinking water and materail supplies and extend the relief cover to a large part of the affceted area. The support already provided includes:

Details at Annexure "B".

In order to alleviate the sufferings of drought affectees, a Full Scale Emergency relief Plan has also been prepared initially for tow months.

The Plan consists of a major thrust to continue and upscale the existing activities and cover the entire affected region. The Emergency Plan therefore, comprises of 5 main components, namely:

The costs of full scale operation in the area to provide safety net to the affected people, based on the above components, is estimated at Rs. 1.641 billion for two months.

Summary is at Annexure "C"

LONG TERM PLAN

A three pronged strategy to make the benefits of the plan to flow to the common persons.

The details of schemes is identified to implement above long term plan is attached as Annexure "D" & "E". The total costs implication of these schemes is as follows:

ROAD SECTOR

Ongoing schemes completion cost             Rs. 336.835 Million

(Thar and Umerkot)

New schemes (Thar and Umerkot)         Rs. 1578.000 Million

New schemes (Dadu and Thatta)           Rs. 987.000 Million

Total Rs. 2901.835 Million WATER SECTOR

New schemes                                       Rs. 1095.992 Million

Total Rs. 1095.992 Million                                                                                 ____________________________

Grand Total                                       Rs. 3997.827 Million

Say Rs. 3998.000 Million
Annexure A
DROUGHT AFFECTED AREAS IN SINDH

THAR REGION
 
District
Dehs
Villages
Population

Affected

Livestock Affected
Tharparkar 
159

(166)*

1895

(2085)**

0.89 

(million)

3.00

(million)

Umerkot 
25

(234)*

316

(1066)**

0.15 

(million)

1.00

(million)


 

KOHISTAN/KACHHO AREA
 
District
Dehs
Villages
Population

Affected

Livestock Affected
Dadu
35

(525)*

453

(4420)**

0.26

(million)

1.00

(million)


 
Total
219
2664
1.30

(million)

5.00

(million)

Note:

 

Annexure "B"
Relief Provided in Financial Terms
 
 
Nature of Relief Financial Implication in

THAR region

Financial Implication in Kohistan/ Kachho Area
Past year Government dues for one year
Rs. 4.00 (million)
Rs. 0.23 (million)
Remission of Land Revenue and Cesses
Rs. 2.00 (million)
Rs. 0.05 (million)
Wheat provided at the subsidized rate of Rs. 5/-Per kg @ 20 kg/family/per month)
Rs. 20.00 (million)
Rs. 25.00 (million)
Food items distribution in Sep/Oct 1999
Rs. 6.60 (million)
 
Cash grant for purchase of Food ration, fodder etc.
Rs. 190.00 (million)
Rs. 25.00 (million)
Pilot Lungar Project
Rs. 1.00 (million)
 
Total
Rs. 223.60 (million)
Rs. 50.28 (million)
Grand Total  
Rs. 273.88 (million)
Annexure "C"
FINANCIAL REQUIREMENT FOR TWO MONTHS
ITEM
THAR 
KOHISTAN/

KACHHO

1. Free distribution of
ration items  including
transportation charges) Annexed at 
(C1-3)
Rs. 720.00 (million)
Rs. 144.0 (million)
2. Processed feed  (fodder) annexed at C-4
Rs. 300.00 (million)
Rs. 25.0 (million)
3. a) Digging of wells for supply of drinking water

b) Repair and maint- enance of SAZDA tube wells for 
drinking water annexed at C-5

Rs. 22.0 (million)
 
 

Rs. 20.0 (million)

Rs. 3.0 (million)
 
 

Rs. 5.0 (million)

4. Logistic Support annexed at C-6
Rs. 10.0 (million)
Rs. 2.0 (million)
5. Medicine/health*
cover (human lives)
annexed at C-7
Rs. 350.0 (million)
Rs. 10.0 (million)
6. Veterinary cover/
medicines annexed at C-8
Rs. 22.0 (million)
Rs. 8.0 (million)
Total
Rs. 1,444.0 (million)
Rs. 197.0 (million)
Grand Total  
Rs. 1,641.0 (million)
ANNEXURE - D
A - ROAD SECTOR ON-GOING SCHEMES:

DISTRICT THAR AND UMERKOT

#          Name of Scheme                  Cost in  Million             Fund required for for completion                           Target
                                                                                                    of the Schemes
                                                                                                    during 2000-2001
--------------------------------------------------------------------------------------------------------------------------------

1. Const: of Road from Umerkot     Rs. 200.38             62.766                                            100%
    to Chachro via Kantio (69kms)

2. Const: of Road from Umerkot     Rs. 108.217         100.856                                             100%
    to Chachro via Ratnour (100kms)

3. Const: of Road from Mithi         Rs. 94.881             21.000                                                100%
    to Islamkot (32kms)

4. Const: of Road from Diplo         Rs. 160.952            104.413                                             100%
    to Islamkot (70 kms)

5. Const: of Road from Diplo         Rs. 121.088             47.800                                                100%
    to Ali Bunder (60 kms)

                                            ---------------         -----------------

                                    TOTAL:- A) RS. 685.518     RS. 336.835

                                            ---------------         -----------------
By construction of the following new roads, it will create job opportunities for the people of the project areas, resulting in employment of man power 999,000 man-months. This will also minimize the migration trained during drought condition and enhance the prosperity of the people.

B - NEW ROAD SECTOR SCHEMES:

DISTRICT THAR AND UMERKOT             TOTAL COST                 PROJECT PERIOD

1. Const: of Road from Jalo-jo-Chaunro             Rs. 93.00 Mil.                 3 Years
    to Rantnour (31kms)

2. Const: of Road from Chachro                        Rs. 66.00   "                       -do-
    to Mubarak-jo-Tar (20kms)

3. Const: of Road Chachro                                 Rs. 118.00  "                      -do-
    to Khensar (36 kms)

4. Const: of Road Khensar                                 Rs. 132.00   "                     -do-
    to Ratnour (40 kms)

5. Const: of Road Chachro                                Rs. 132.00 "                         -do-
    to Ratnour via Virari (40 kms)

6. Const: of Road Chelhar                                 Rs. 79.00 "                            -do-
    to Kantio (24 kms)

7. Const: of Road Islamkot to                             Rs. 244.00 "                     5 years
    Nagarparkar via Virawah (105 kms)

8. Const: of Road Wango to                             Rs. 158.00 "                         3 years
    Diplo via Khetlari (48 kms)

9. Const: of Road Naukot to                             Rs. 181.00 "                         3 Years
    Dilpo (55 kms)

10. Const: of Road Chachro to                         Rs. 363.00 "                         5 Years
    Virawah via Dano Dhandal (110 kms)

                              ---------------------------- -----------------

                              TOTAL Kms 478         TOTAL:- B) RS. 1,578.00 "

                                ---------------------------- -----------------

DADU AND THATTA DISTRICT             TOTAL COST             PROJECT PERIOD

1. Const: of Road from Tong Sharif                 Rs. 90.00 Mil.             3 Years
    to Karchat (30kms)

2. Const: of Road from Mole                         Rs. 78.00 "                         -do-
    to Sari (26kms)

3. Const: of Road Wahi Pandhi                     Rs. 75.00 "                         -do-
    to Chinni (25kms)

4. Const: of Road Thano Ahmad Khan         Rs. 105.00 "                         -do-
    to Thano Arab Khan (35 kms)

5. Const: of Road Dhamach                         Rs. 75.00 "                            -do-
    to Sari (25kms)

6. Const: of Road Thano Ahmad Khan         Rs. 216.00 "                         4 Years
    to Toung Sharif via Ali Murad Bareio(72kms)

7. Const: of Road Thano Ahmad Khan         Rs. 189.00 "                             -do-
    to Karchat via Thano Arab Khan (63kms)

8. Const: of Road Jungshahi to                     Rs. 84.00 "                                2 Years
    Malmari (28kms)

9. Const: of Road Malmari to                     Rs. 75.00 "                                     -do-
to Super Highway (25kms)

                        ---------------------------- -----------------

                    TOTAL Kms 329         TOTAL:- C) RS. 987.00 "

                            ---------------------------- -----------------

G. TOTAL FOR ON-GOING (A+B+C):- RS. 2,902.00 "
AND NEW PROPOSEDSCHEMES PACKAGE
-----------------------------------------------------------------------


 

ANNEXURE - 1
LONG TERM INVESTMENT PROGRAMME:

---------------------------------------------------------------------------------------------------------------------
NO.     Water Sector                    PROJECT                  TIME PERIOD                     RMKS:
---------------------------------------------------------------------------------------------------------------------
1. Drilling/Installation of                 Rs. 15.000                 12 months PC-I submitted to P&D Deptt.
10 Nos Tube Wells in Kohistan Region

2. Constructing Delay Action         Rs. 29.845                 24 months                     Concept clearn.
Dams, Small Dams, Recharge                                                                                paper attached.
Gabion Dams in (upper Kohistan)                                                                          PC-I prepared in
                                                                                                                            1990-93

3. Constructing Delay Action         Rs. 161.969                 36 months                             -do-
Dams, Small Dams, Recharge
Gabion Dams in (lower Kohistan)

4. Constructing Delay Action         Rs. 98.828                     20 months                             -do-
Dams, Small Dams, Recharge
Gabion Dams in (Central Kohistan)

5. Constructing of 15 Nos Recharge     Rs. 24.950             12 months                               -do-
Gabion-Dam in N.P.Kar area of
Thar Region in Sindh Arid Zone

6. Drinking Water Supply through     Rs. 55.000                     -do-                                     -do-
    Pipe line from Pokhan Dhoro to
    Surrounding villages (25 Kms)

7. Drinking Water Supply through        Rs. 14.200                 -do-                                         -do-
    Pipe line from Parche-ji-Wari to
    Dudhrio (07 Kms)

8. Drinking Water Supply through     Rs. 161.000                 24 months                             -do-
    Pipe line from Umerkot to Jalo-
    Chanro and adjoining village (70 Kms)

9. Introduction of Drip Irrigation         Rs. 10.000                 12 months                                --
    System in Thar and Kohistan Region

10. Community Based cactus             Rs. 15.000                 36 months                                 -
    plantations in Arid Zone of
    Sindh

11. Drilling/Installation of                 Rs. 98.750                 24 months                         Concept clearn.
    50 Nos Tube Wells                                                                                                paper attached
    in Thar Region (Northern Thar)                                                                              PC-I Prepared
    (through hired Rigs)                                                                                                 1990-93

12. Drilling/Installation of                 Rs. 98.750                     -do-                                         -do-
    50 Nos Tube Wells in
    Thar Region (Southern Thar)
    (through hired Rigs)

13. Drilling/Installation of                 Rs. 98.750                     -do-                                         -do-
    50 Nos Tube Wells in
Koh: Region (Lower Kohistan)

14. Drilling/Installation of                 Rs. 90.000                     -do-                                            -do-
    50 Nos Tube Wells in
    Koh: Region (Upper Kohistan)
    (through hired Rigs)

15. Drilling/Installation of                 Rs. 98.750                     -do-                                             -do-
    50 Nos Tube Wells in
    Koh: Region (Central Kohistan)
    (through hired Rigs)

16. Feasibility Study for Construction     Rs. 15.000             12 months                                         -do-
    of Gaj Dam for drinking &
    Irrigation purposes in Kohistan Region

17. Feasibility Study of Thar Canal         Rs. 10.000             12 months                                         -do-

                                                    -----------------

                                                TOTAL: RS. 1,095.992

                                                        -----------------