National Environmental Action Plan Support Programme (NEAP-SP)
Table of Contents
NEAP Support Programme
SECTION 1- PROBLEM DESCRIPTION
1.0. Problem description / 1
1.1. Poverty-Environment Nexus /1
1.1.1. Environmental Degradation in Pakistan / 2
1.2. The Population Groups Affected / 2
2.0. Previous Experiences and Lessons Learned / 3
2.1. Social Action Programme / 3
2.2. National Conservation Strategy / 4
2.3. Environment Protection and Resource Conservation Project / 5
2.4. On-Going Programme on Poverty and Environment of UNDP / 5
2.5. Programmes of Partner Agencies / 6
2.6. Summary of Lessons Learnt / 7
3.2 Capacities to be built / 9
SECTION II - PROGRAMME CONTEXT AND STRATEGY
4.0. POLICY FRAMEWORK / 11
4.1. Government Plans and Policies / 11
4.1.1. GoP’s 7-Point Agenda / 11
4.1.3. NGO Framework in Pakistan / 16
4.1.4. Pakistan Experience in Development Work
through CBOs / NGOs / 16
4.2. UNDP Policies / 17
4.2.1. UN Policy Framework at the Global Level / 17
4.2.2. UN Pakistan / 17
4.2.3. GoP and UNDP Country Cooperation Framework / 18
5.1. Innovation in the spirit of Agenda 21 / 18
5.2. Support to the implementation of NEAP towards economic growth and poverty reduction without environmental losses / 18
5.3. Poverty Alleviation and Sustainable Development Facility - a key link with the Programme/ 19
5.4 Sustaining Programme Impact / 20
5.4.1. Economic Sustainability / 20
5.4.2 Environmental Sustainability / 20
5.4.3 Technical Sustainability / 20
5.4.4 Institutional Sustainability / 20
5.4.5 Socio-Cultural Sustainability / 21
SECTION III. PROGRAMME OBJECTIVES AND MANAGEMENT
PROGRAMME OBJECTIVES / 22
7.0. OUTCOMES, OUTPUTS AND MONITORING INDICATORS / 29
8.0. PROGRAMME MANAGEMENT / 29
8.1. Main Elements of the Implementation Strategy / 29
8.2. Role of the Ministry of Environment in the Programme / 30
8.3. Role of the CRPRID in Programme / 30
8.4. UNDP Role in the Programme / 31
8.5. Linkage of On-going/Pipeline Projects with NEAP Support Programme / 31
8.6. Programme Phasing / 31
8.7. Programme Finance / 32
8.8. Implementation Arrangements / 32
8.9. Coordination with Other Programs and Projects / 38
8.10 Arrangements and Preparation of Work Plans / 38
8.11 Technical Backstopping / 38
9.0. MONITORING AND EVALUATION / 39
10.0. FINANCIAL MANAGEMENT / 40
10.1. Total Programme Costs/Budget / 40
10.2. Programme Financing / 40
11.0. RISK AND PRIOR OBLIGATIONS / 50
11.1. Risk Analysis / 50
11.2. Prior Obligations and Pre-requisites / 51
12.0. LEGAL CONTEXT / 52
ANNEXES
Annex I. Environmental Degradation in Pakistan
Annex II. Excerpts From United Nations Millennium Declaration
Annex III. Poverty Alleviation and Sustainable Development Facility
Annex IV. Expected Outcomes and Monitoring Indicators
Annex V. Linkage of On-going/Pipeline Projects with NEAP Support Programme
Annex VI. Work Plan for Planning Phase
Annex VII. Implementation Arrangements for NEAP
Annex VIII. Terms of Reference for the Programme Implementation Unit/Committees and Core Staff Positions
Annex IX. Staffing of PMIU and PIUs
Annex X. Linkages of NEAP-SP with National Plan & International Conventions/Treaties.
Annex XI. Specimen Format for Project Concept Paper
LIST OF FIGURES
Fig. 1. Poverty Environment Nexus / 2
Fig. 2. Framework of the National Environment Action Plan / Followed Page 14
Fig. 3. Framework of the NEAP Support Programme / Followed Page 22
Fig. 4. Implementation Arrangements of the NEAP Support Programme / Followed Page 33
Fig. 5. Management Structure for NEAP Support Programme /Followed Page 33
ACRONYMS
|
AJK |
Azad Jammu and Kashmir |
|
APR |
Annual Project Report |
|
AsDB |
Asian Development Bank |
|
CAP |
Community Action Plan |
|
CAP 21 |
Capacity 21 |
|
CBD |
Convention on Biodiversity |
|
CBO |
Community-Based Organization |
|
CCA |
Common Country Assessment |
|
CCC |
Convention on Climate Change |
|
CCD |
Convention on Combating Desertification |
|
CCF |
Country Cooperation Framework |
|
CDS |
Community Development Specialist |
|
CIDA |
Canadian International Development Agency |
|
CITES |
Convention on International Trade in Endangered Species |
|
CO |
Country Office |
|
CRPRID |
Centre for Research on Poverty Reduction and Income Distribution |
|
CSD |
Commission on Sustainable Development |
|
DALY |
Disability-Adjusted Life years |
|
EAD |
Economic Affairs Division |
|
EDCG |
Environment Donors Coordination Group |
|
ENERCON |
Energy Conservation Centre for Pakistan |
|
EPA |
Environmental Protection Agency |
|
EPRCP |
Environmental Protection and Resource Conservation Project |
|
ETPI |
Environment Technology Programme for the Industry |
|
EU |
European Union |
|
FAO |
Food and Agricultural Organization |
|
FERTS |
Fuel Efficiency in Road Transport Sector |
|
FIM |
Financial Management System |
|
FPCCI |
Federation of Pakistan Chambers of Commerce and Industries |
|
GDP |
Gross Domestic Product |
|
GEF |
Global Environment Facility |
|
GoP |
Government of Pakistan |
|
HDIP |
Hydrocarbon Development Institute of Pakistan |
|
HDR |
Human Development Report |
|
ICARDA |
International Centre for Agricultural Research in Dry Areas |
|
ICRISAT |
International Crops Research Institute for the Semi-Arid Tropics |
|
IFAD |
International Fund for Agricultural Development |
|
IT |
Information Technology |
|
IUCN |
The World Conservation Union |
|
LIFE |
Local Initiative Facility for Urban Environment |
|
MACP |
Mountain Areas Conservancy Project |
|
MAF |
Million Acre Feet |
|
MIS |
Management Information System |
|
MoELGRD |
Ministry of Environment, Local Govt. & Rural Development |
|
MYFF |
Multi-Year Funding Framework |
|
NCS |
National Conservation Strategy |
|
NDP |
National Drainage Programme |
|
NEAP |
National Environmental Action Plan |
|
NEAP-SP |
National Environmental Action Plan Support Programme |
|
NEQS |
National Environmental Quality Standards |
|
NEX |
National Execution |
|
NGO |
Non-Government Organization |
|
NORAD |
Norwegian Agency for Development Cooperation |
|
NPD |
National Project Director |
|
NRSP |
National Rural Support Programme |
|
NSDF |
National Sustainable Development Facility |
|
NTC |
National Tariff Commission |
|
NUST |
National University of Science and Technology |
|
NWFP |
North West Frontier Province |
|
ODS |
Ozone Depleting Substance |
|
P&DD |
Planning & Development Division |
|
P&DD |
Planning and Development Department |
|
PA |
Protected Areas |
|
PAF |
Poverty Alleviation and Sustainable Development Facility |
|
PCAT |
Pakistan Council of Appropriate Technology |
|
PCOM |
Project Cycle Operation Manual |
|
PEPA |
Pakistan Environment Protection Act |
|
PEPC |
Pakistan Environment Protection Council |
|
PIC |
Programme Implementation Committee |
|
PIHS |
Pakistan Integrated Household Survey |
|
PIU |
Programme Implementation Unit |
|
PLM |
Participatory Learning and Monitoring |
|
PLMF |
Participatory Learning and Monitoring Facility |
|
PLUS |
Programme of Improving Livelihoods in Urban Settlements |
|
PM |
Project Manager |
|
PMIU |
Programme Management and Implementation Unit |
|
PPS |
Participatory Planning Specialist |
|
ProDoc |
Project Document |
|
PRSP |
Poverty Reduction Strategy Paper |
|
PSC |
Programme Steering Committee |
|
PD |
Programme Document |
|
PU |
Programme Unit |
|
RBM |
Results-Based Management |
|
ROAR |
Results-Oriented Annual Report |
|
SAP |
Social Action Programme |
|
SDN |
Sustainable Development Network |
|
SHD |
Sustainable Human Development |
|
SPIC |
Sub-Programme Implementation Committee |
|
SPPD |
Support for Programme and Policy Development |
|
SRF |
Strategic Results Framework |
|
SWEEP |
Solid Waste and Environment Enhancement Programme |
|
TOR |
Terms of Reference |
|
TPR |
Tripartite Review |
|
TTPR |
Terminal Tripartite Review |
|
UNCED |
UN Conference on Environment and Development |
|
UNDESA |
UN Department for Economic and Social Affairs |
|
UNDP |
United Nations Development Programme |
|
UNEP |
United Nations Environment Programme |
|
UNFPA |
United Nations Population Fund |
|
UNHSF |
UN Human Security Fund |
|
UNICEF |
United Nations Children’s Fund |
|
UNIDO |
United Nations Industrial Development Organization |
|
UNOCHA |
United Nations Office for the Coordination of Humanitarian Affairs |
|
WFP |
World Food Programme |
|
WO |
Women Organization |
|
WWF |
Word Wide Fund for Nature |
NATIONAL ENVIRONMENTAL ACTION PLAN
SUPPORT PROGRAMME
SECTION I
PROBLEM DESCRIPTION
This section analyzes the nature and extent of environment related problems and issues within the context of poverty-environment nexus. These problems and issues relate to degradation of natural resources (soil, water, pastures, forests), loss of biodiversity, and pollution. The most affected groups are identified. A summary of programmes and projects initiated to address these problems is presented with an objective to draw lessons.
1.0. Problem Description
Pakistan is blessed with tremendous human and natural resources, which if used carefully can advance human development. However, poor governance in the past has resulted in institutional decay leading to an array of problems, such as poverty, lack of access to basic services, low literacy rate, gender disparities, environmental degradation and above all high indebtedness.
The issues related to sustainable development and the poverty – environment nexus are described as follows:
1.1. Poverty-Environment Nexus
According to 1998 census, the population of the country was 131 million with an annual growth rate of 2.4%. Pakistan ranks 135 out of 174 countries in the Human Development Index 2000. Increasing poverty has become a major area of concern in Pakistan. According to caloric-based approach, poverty has increased from 17.4% in 1987-88 to 22.4% in 1992-93 and jumped further to 32.6% in 1998-99. According to Human Development Report of 2000, population below income poverty line of one US dollar per day is 31%, which implies that every third household in Pakistan does not have sufficient income to afford daily intake of 2,250 calories per person.
Some 15% of the population is without access to health facilities, 21% without access to safe drinking water and 44% without access to sanitation facilities. The main reasons for the spread of poverty in Pakistan are: a small tax base (and consequent lack of budget for social investments); increased power tariffs which have undermined the industrial growth, thus job opportunities; loss of confidence of the private sector investors on government policies; drop in foreign exchange remittances; and impediments in implementation of structural reforms.
The poor are solely dependent on natural resources and virtually have no resources to invest in their conservation. On the other hand, the rich consume many times more of natural resources and apply wasteful practices both as landlords/producers and as consumers. The poor are often left to cope in extremely limited conditions on the most marginal and fragile lands. Also, the poor mostly do not have neither the knowledge nor the means to apply sustainable practices and techniques. For instance, the soil is not adequately fertilized, high efficiency irrigation and drainage techniques are not applied, rangelands are overgrazed or degraded by expanding cropping, forests are degrading through exploitation of timber and fuelwood which consequently depletes capacity of water reservoirs due to siltation, and contributes to lower groundwater table. Once the ecosystems are degraded, the human and livestock population cannot be sustained, which results in reduced income for the already poor people, thus leading to aggravated poverty. In urban centres, the poor have to spend more on below standard housing and face health hazards due to lack of safe drinking water, sanitation and exposure to industrial and air pollution. The combined effect of these factors is reduced life span, loss of income due to job-days lost because of illnesses, increased expenses on health care, etc. The poverty-environment nexus is further explained in Fig. 1.
The GoP is in the process of finalizing a poverty reduction strategy to achieve the poverty reduction target to be reached by the end of 9th Five-Year Plan (1998-2003), 26% (27.1% rural and 20.1% urban). The target set in the draft 10th Five-Year Plan (2003-2008) is 15.2% (15.5% rural and 11.5% urban).

Fig. 1. Poverty-Environment Nexus Leading to Social Effects and Conflicts on Environmental Scarcities
1.1.1. Environmental Degradation in Pakistan
Pakistan is confronted with a number of severe environmental problems which are also linked with poverty, such as degradation of natural resources, industrial and vehicular pollution, pollution of marine environment, degradation of human health, etc. Summarizing in monetary terms, the annual cost of environmental degradation in the country is about 4.3% of GDP (US $ 4.3 billion) which is equivalent to almost half of the Pakistan’s export earnings. In Annex I, specific examples are given under the following themes: (i) Land, (ii) Water, (iii) Drought and Desertification, (iv) Forests, (v) Loss of Biodiversity, (vi) Environmental Health, (vii) Disposal of Liquid and Solid Waste, (viii) Vehicular and Industrial Pollution, (ix) Climate Change, and (x) Ozone Depletion.
1.2. The Population Groups Affected
The affectees of institutional decay, failure of macroeconomic policies and environmental degradation are overwhelmingly the poor, in both urban and rural areas, who are less protected than the rich from the health and income impacts of water/soil/air pollution and natural resource-base degradation. Different population groups are affected by environmental degradation to a different extent, as the examples below indicate:
2.0. Previous Experiences and Lessons Learned
Over the last decade or so, the development focus had been to alleviate poverty in one way or the other. Towards this aim, successive Governments implemented a wide range of programmes and projects. Some of these programmes and projects have already been completed while others are still going on. All these programmes and projects met with varying degrees of successes and failures. This section reviews the most significant undertakings with a view to learn from their experiences so as to draw useful lessons for better future planning.
2.1. Social Action Programme
The Social Action Programme (SAP) was conceived in 1991 by the Government of Pakistan (GoP) in response to the realization that Pakistan's performance and ranking in social development compared unfavorably with developing countries in general, and with the other countries of South Asia in particular. The Programme is supported by the SAP project- a project co-financed by a World Bank-led consortium, comprising the Bank itself, the Asian Development Bank, the European Union and the Governments of Netherlands and United Kingdom. The programme was initiated with substantial donor assistance in 1992-93 and has since been able to achieve success in terms of increased allocation, improved access especially to primary health care and greater awareness along government functionaries and civil society at large regarding the importance of the programme.
The Pakistan Integrated Household Survey (PIHS) concluded that SAP has had only a very small impact on the basic social indicators. In education sector, the gross enrollment rate for primary education actually declined by 1% (73% baseline in 1991; 72% in 1997), except in the case of girls which increased from 59% in 1991 to 64% in 1997; and enrollment in government schools declined (86% in 1991 vs. 78% in 1997) even though there has been a major increase in the number of schools. In health sector, however, there has been 11% reduction in the incidence of diarrhea, mainly due to successful implementation of the Lady Health Workers Programme and the expanded immunization programme.
The World Bank in its appraisal of SAP-II, concluded that in SAP-I the sectors received enhanced funding; allocations were largely protected; policy dialogue was encouraged; and some preliminary steps to initiate institutional reform had been taken. However, the vested political interests at various levels
remained strong enough to frustrate reform; bureaucratic delays and political interference plagued the system from the top down through several layers to the local level; the management of services was too centralized with too little community involvement; implementation capacity of various institutions remained weak; and users who ought to have a stake in reforming the system remained largely uninvolved. However, proponents of the SAP argue that in the absence of SAP access to basic social services would have been more limited.
SAP-I experience has led to the reinforcement of SAP-II by including a focus on quality; decentralization and a shift to community control; encouragement of service provision by the NGOs; and measurement of outcomes and impacts. SAP-II calls for much greater emphasis on monitoring and evaluation. This is essential, as line departments have, for many years, relied on the information gap between the village and provincial headquarters to hide their poor performance. Strengthening government capability in this area is an obvious need.
2.2. National Conservation Strategy
The NCS mid-term review, a year long process completed in May 2000, concluded that the NCS was highly instrumental in creating awareness in environment and conservation, initiating a consultative process for achieving its goal at various levels, advocating priorities, and putting in place the environmental institutional framework. On the other hand, it was also concluded that the NCS has not resulted in influencing macroeconomic and sectoral policies (pricing, incentives, structural adjustment), providing incentives and safeguards for ‘clean’ growth, improving general environment, and proper reporting on sustainable development and state of the environment. In case of poverty reduction, there are a few cases of improvement in environmental health but overall the natural resource management is still weak, response to hazard reduction and disaster management is limited and empowerment of communities is still absent.
The review while recommending NCS Phase-II suggested that: (i) NCS should operate adequately as a sustainable development strategy; (ii) implementation capacity of institutions should be strengthened; (iii) bottom-up demand driven, rather than supply-driven, approach should be followed; and (iv) resources should be mobilized locally by pricing, efficiency gains, cost recovery, credit access and exploring innovative funding sources, such as green business opportunities and capturing of global environment benefits locally. The NEAP-SP shall address some of the recommendation of NCS review, such as policy research and advocacy to influence national development agenda, inter-ministerial coordination to address the environmental issues holistically, local resource mobilization through incentives and dis-incentives, involvement of private stakeholders- especially setting up of green enterprises, tapping of international trust funds, and sustainable industrial development for alleviating poverty vis-à-vis environmental conservation.
2.3. Environment Protection and Resource Conservation Project
The Environment Protection and Resource Conservation Project (EPRCP) was in operation from 1993 to 2000. The project was one of the first stand-alone environmental projects supported and financed by the World Bank Group. It included an institutional development component and a number of natural resource management sub-components. From the Bank’s perspective, EPRCP was part of a much larger programme to support economic development, with special emphasis on the social sectors, agriculture production, natural resource management, and environmental protection. The project was initially designed to be national in scope, but Balochistan province was excluded after appraisal at the province’s request. However, the province later benefited from a separate project, Balochistan Natural Resource Management Project. In addition, two of EPRCP’s watershed rehabilitation sub-projects, Dir, Kohistan in NWFP, and Murree, Kahuta and Kotli Sattian in Punjab, were re-appraised by the European Union and financed separately (parallel financing) through a grant.
The general objective of the project was to improve protection of the environment and management of natural resources. Its specific objectives were to: (i) initiate the strengthening of key federal and provincial environmental protection institutions so they can deal with environmental protection and resource conservation in a systematic and planned manner, (ii) strengthen environmental legislation, and initiate environment policies and programmes, (iii) disseminate information, concerning damage to the environment and natural resources to policy makers, government officials, and the public, (iv) strengthen professional education in environmental and natural resource planning and management, (v) implement sub-projects to rehabilitate, protect, develop and manage agro-ecological resources which have been damaged or which are threatened with damage, and (vi) undertake studies and preparation for future environmental protection and resource conservation projects /sub-projects..
The EPRCP review concluded that the project objectives were largely coherent with the GoP’s priority multi-sectoral environmental objectives and strategies. However, with 14 components distributed over four different geographical regions, the project was inherently complex and suffered from weak coordination and other implementation problems. The project contributed to the development of new institutions, enactment of environmental legislation, building environmental awareness and education and piloting participatory approaches and sustainable management practices both at community and watershed levels. However, the effectiveness of the ‘strengthened" institutions and legal framework is yet to be realized in terms of credible policy impact, environmental assessment and monitoring enforcement. In general the project performed a pioneering role in translating strategies, like the NCS and Forestry Sector Master Plan, into actions.
2.4. On-Going Programme on Poverty and Environment of UNDP
In the environment sector, UNDP Pakistan’s major interventions are in the area of solid waste management and environmental enhancement in the urban areas, mitigating pollution due to operation of tanneries, rehabilitation of waterlogged and saline land; and biodiversity conservation and climate change- through Global Environment Facility (GEF) funding. The GEF Small Grants Programme and LIFE (Local Initiative Facility for Urban Environment) have proved highly instrumental in utilizing the NGOs resource-base for making strategic interventions in GEF programme areas and urban sector, respectively. The macro GEF projects in the area of biodiversity conservation and climate change are the concrete examples of public-civil society and private sector partnership.
As poverty and environment are inter-linked, UNDP Pakistan is making interventions in resource poor areas of AJK, Balochistan, NWFP and Northern Areas through its area-based programmes by mobilizing Community-Based Organizations (CBOs) for natural resource management. Other programme interventions under Sustainable Livelihoods Programme are addressing the menace of waterlogging and salinity, introducing sustainable waste management practices, and mitigation measures. These programmes, though targeting on poverty alleviation, are supporting initiatives in the areas of natural resource management, through the involvement of communities at the local level. All these projects deal with the most disadvantaged and poorest of the poor. Conceived as models of community-based poverty alleviation programmes, they draw on the experience of successful rural support programmes and aim at expanding people’s choices and opportunities for sustainable farming practices, and increasing incomes from informal productive activities and services.
However, highly conservative society and socio-culture norms prevalent in the remote regions often result in delays in the implementation of projects. The society particularly resists in initiating activities aimed at the advancement of women. Nevertheless, the use of the participatory approach to development has helped to overcome the conservative culture, thereby reaching at workable strategies.
2.5. Programmes of Partner Agencies
After the approval of NCS by the cabinet on March 1, 1992, the GoP reached an agreement with the World Bank and affiliated donors, for a technical assistance credit of US $ 29.2 million for the Environmental Protection and Resource Conservation Project (EPRCP). The scope of EPRCP and lessons learned from its implementation have been discussed in Section 2.2.
CIDA had supported the preparation of NCS as well as provided support for its implementation in the form of Pakistan Environment Programme. These initiatives were followed by other donor initiatives, including the EC-funded watershed rehabilitation project (included in the EPRCP), the Swiss and Dutch funded projects on sustainable industrial development and several sectoral projects supported by the ADB and NORAD.
The Food and Agriculture Organization (FAO) is collaborating with UNDP in several on-going projects, such as Area Development Programme AJK, food security, rational use of pesticides, etc. FAO is also implementing a programme on integrated pest management with the assistance of European Union.
The main activities of UNIDO in Pakistan, in collaboration with UNDP, are in the area of pollution control in tanneries and research and studies on industrial and environmental policy. UNIDO also plans to initiate cleaner production centre programme in Pakistan, for which UNDP has provided assistance for the formulation of a project in oil sector. The other sectors of UNIDO’s anticipated interventions are: textile, leather and chemicals. In the past, UNIDO has provided technical assistance to the Ministry of Food, Agriculture and Livestock for the establishment of national eco-toxicology centre which is equipped with the state-of-the-art equipment for pesticides residues analysis.
UNICEF supports the Prime Minister's Lady Health Worker's Programme, Vitamin-A Supplementation Programme, establishment of database on out of school children in selected districts, and water sector development in the country. UNICEF’s high-level social policy advocacy is the major activity which has given an impetus to policy dialogue on water and sanitation sectors in Pakistan.
UNFPA has formulated its 6th Country Programme (2000-2003). The overall achievements of the 5th Country Programme are reflected in the documented onset of the fertility decline. The Programme has played an instrumental role in bringing about a paradigm shift in the population policies from a narrowly defined family planning approach to the broader concept of reproductive health. The new Country Programme has three thematic sub-programmes: namely, Reproductive Health, Population and Development, and Strategies and Advocacy. A major undertaking of the new programme is to bring about behavioral change conducive to improving the quality of life and the empowerment of women.
WFP in Pakistan provides food assistance to a variety of activities under the three main components of its current Country Programme: the environmental sector (natural resource management), the social action sector (promoting primary health care and girls education) and assistance to Afghan Refugees. In 1999, WFP brought into Pakistan about 48,000 tons of food worth of over US $ 12 million.
IFAD has supported 16 projects in Pakistan, with a total loan commitment of about SDR 219 million. The IFAD's development strategy seeks to improve villager’s opportunities, increase productivity and conservation of the environment and mobilize communities. UNDP is implementing IFAD funded projects in AJK and Northern Areas.
A number of projects and programmes that have been implemented in the past have been reviewed in the preceding section. These projects and programmes met with varying degrees of success. The experiences gained and lessons learnt during the implementation of these projects and programmes can provide useful insights towards the formulation of the PD and developing institutional arrangements for its successful implementation. These lessons are summarized below:
The institutions concerned by the activities supported through this national programme need certain capacities to attain and sustain the expected impact. These capacities can be broadly defined in terms of substantive capacities (policy formulation, institutional, human resources, technological, and financial) and support capacities (programme management & co-ordination, information management and budgetary). This section examines these capacities with an aim to identify opportunities for strengthening these capacities through the programme proposed in this PD.
3.1 Substantive Capacities
3.1.1. Policy and Legislation Formulation Capacity
The Government of Pakistan enacted the Pakistan Environmental Protection Act (PEPA) in 1997--which is the most recent and updated legislation on environment. It provides a framework for establishing federal and provincial Environmental Protection Agencies (EPAs), and suggestions for protection and conservation of species, habitat and biodiversity, and conservation of renewable resources. The MoELGRD has recently approved the NEAP for improving the environmental conditions and natural resources protection. The organizational structure of the MoELGRD is being adjusted to improve its capacities to facilitate the implementation of both PEPA and NEAP. The Ministry will continue to take initiatives in collaboration with the Pakistan Environmental Protection Council (PEPC) and provincial EPAs to adjust the PEPA and NEAP to match up with the changing realities on the ground. Within the Ministry, there is also a NCS Unit that is responsible for promoting and monitoring progress of NCS implementation. As a follow-up to these initiatives, it is likely that decrees will continue to be prepared and issued in the near future to further improve the state of environment and regulate the natural resources utilisation and pricing. The MoELGRD under its new structure will have to strengthen necessary capacities to steer the process of policy and legislation formulation, fund management and implementation of the existing laws and NEQs in collaboration with the local administration and judiciary.
3.1.2. Institutional Capacity
At the institutional front, the MoELGRD has to play three important functions as a regulatory agency, technical support agency and public health agency. As a regulatory agency, it is required to work with the corporate or industrial sector so as to provide information on clean technologies, sources of funding and assistance, and access to markets for environment friendly products. In the capacity of technical support agency, it is required to create conditions for sustaining the livelihood economies. This entails community organization and mobilization efforts in order to empower the local communities to protect their natural resource base. As a public health agency, it should undertake and promote research on environment-health nexus, and building a strong constituency around the protection of human health. The staff of the Ministry and its subsidiary organizations would form the core staff who will undertake functions relevant to these roles. The Ministry and its subsidiary organizations possess certain capacities in these aspects--but these capacities appear to be well short of those required to deliver a comprehensive national programme such as elaborated in the NEAP and NCS. These agencies though may be able to recruit new staff or draw upon staff from other relevant ministries / institutions in accordance with the existing laws and regulations, there is definitely a need to strengthen institutional capacities in terms of their roles and functions, as well as in planning, enforcement and monitoring of environment related initiatives.
3.1.3. Human Resources and Technological Capacities
Historically, other than the upstream level policy and legislative related tasks, most of the environmental related programmes and projects in Pakistan have been implemented directly by the international NGOs by forming partnerships with the private sector and CBOs. This reliance on international NGOs was partly due to lack of trained human resources in the national institutions responsible for these tasks. The technological capacities in terms of availability of modern equipment to support the technical functions were also limited. In recent years, however, there had been more awareness and recognition to develop and strengthen such capacities. To ensure long-term sustainability of the environment-related projects, the programme proposed herein gives due recognition to this need. Building and strengthening such capacities require comprehensive analysis of the current situation in terms of national expertise and equipment available vis-à-vis what is needed and for what purpose, especially with respect to implementation of NEAP and NCS.
3.1.4. Financial Capacity
Different types of capacities required to attain and sustain the impact of the environmental management agenda proposed in the NEAP and NCS have been outlined in the preceding paragraphs. However, these capacities will not prove productive in achieving the desired objectives unless adequate funds are made available to execute the national programme. Total funding requirements for implementing various components of the environmental agenda as outlined in the NCS were estimated to be around Rs. 150 billion. Out of this, an amount of about Rs. 21 billion was allocated during the 8th Five-Year Plan. Since the Ninth Five-Year Plan has not been released yet, it is not clear how much of the financial resources will be allocated to target the NCS agenda. Similarly, financial requirements for NEAP are not explicitly available but presumably these could be considered as part of the overall NCS estimates.
Given the very special circumstances of Pakistan stemming from very tight economic and financial conditions, availability of required amount of funds is the key to attain and sustain the impact of the proposed programme. The Government has indicated that it will allocate substantial amount of required funds from its own development and non-development budgetary sources. The balance will have to be mobilized from non-governmental (or external) sources. Towards this aim, the Government’s resource mobilization efforts will focus on building partnerships with the private sector and international donor agencies. Nevertheless, these efforts will have to go much beyond the financial size of this Programme (estimated to be $60.01 million). In other words, financial resources will have to be mobilized not only to finance the present Programme but also for other activities which are not included here but which form building blocks of the national environmental programme, and especially where it interfaces with the poverty reduction strategy.
3.2. Capacities to be Built
The programme will build the following capacities to contribute towards the implementation of the National Environmental Action Plan (NEAP):
Capacities will be strengthened in the following areas:
Among the many topics to be considered for the training programme are the following:
SECTION II
PROGRAMME CONTEXT AND STRATEGY
This section provides an overview of the Programme strategy. The section starts with an overview of the GoP plans and policies that form the building blocks of the strategy. This is followed by description of UN policy framework at the global level. The global framework combined with the GoP development agenda led to the identification of specific capacities that are to be targeted for support under this Programme.
4.0. POLICY FRAMEWORK
4.1. Government Plans and Policies
At the national level, the Federal Government is responsible for developing overall programmes and policies whereas the Provincial Governments are responsible for their implementation.
The Planning & Development Division at the federal level and Planning & Development Departments at the provincial levels are responsible for the preparation of development plans and allocation of resources. At the federal level, the Ministry of Environment, Local Government and Rural Development is responsible for the development of policies and programmes under the environment theme. The Pakistan Environmental Protection Agency (PEPA) and provincial EPAs are the main regulatory bodies for environmental monitoring. Overall planning including planning for poverty reduction is the responsibility of the Planning Commission at the federal level. The concerned line departments, such as agriculture, water, health, education, municipalities, etc. are responsible for the implementation. The present Poverty Reduction Strategy views poverty in a more holistic manner, and several line departments are involved in its implementation.
4.1.1. GoP’s 7-Point Agenda
Pakistan’s political history is checkered with many attempts at delivering a better life for people; however, these initiatives have on the contrary resulted in causing the people further dismay. The non-use, misuse and abuse of political and administrative systems have led to a profound institutional crisis that has slowed down national development and threatened the future. To address the institutional crisis, the present Government has elaborated a seven point agenda, which is as follows:
.
The GoP has announced a strategy for the reconstruction of local government that not only addresses the agenda point on "Devolution of Power and Responsibility" to the grassroots level but also the rest of the six points as the reconstruction process applies a bottom-up approach. It includes the following key elements:
The GoP has also established a National Reconstruction Bureau, which is preparing policies and plans for economic revival, strengthening of public institutions and preparing action plans for implementing the devolution plan. The present Programme would support GoP’s initiative in devolution of power through its efforts in sharing best practices, lessons learned, sensitization of policy community in sustainable development and actually demonstrating sustainable development practices through community actions in the pilot areas.
4.1.2. Poverty Reduction Strategy, NEAP, and Local Government (Devolution) Plan and Information Technology Policy
Addressing the poverty-environment nexus holistically stands very high on GoP’s national development agenda. To this effect, Government priorities and strategies can be found in the following major documents. Alternatively stated, the actions and measures outlined in these documents forms the main elements of the national programme to address the issues related to poverty--environment nexus.
More recently, the Government has taken concrete steps to implement the Devolution of Power Plan and Information Technology Policy. Both these initiatives provide necessary impetus to translate the actions and measures proposed in the above-referred documents into reality--thus paving the way to achieve the goal of sustainable environmental management. Main features of the national environmental programme as described in these documents are summarized below.
Poverty Reduction Strategy
The GoP is in the process of finalizing the Interim Poverty Reduction Strategy Paper (IPRSP), in collaboration with all the stakeholders, including the Brettonwoods Institutions, multi /bi-lateral donors and UN Agencies. In the draft paper, poverty has been defined as a multi-dimensional concept, which encompasses economic, political, and social needs that are sine qua non for a meaningful and complete existence. It has been realized that the poor are not simply deprived of income and resources, but they lack basic capabilities like education, health and clean drinking water. Low capabilities combined with social exclusion make it difficult for the poor to access the markets. Moreover, limited access to education, health and nutrition limits their ability to secure gainful employment. However, even if they succeed, these deprivations retard their ability to be productive participants in the economic process thus denying them the opportunity of bringing about an improvement in their lives. Besides income poverty, lack of resources makes them vulnerable to exogenous shocks. This is further exacerbated by institutions of governance that tend to exclude the most vulnerable from the entire decision making process.
The IPRSP aims at forging broad-based alliances with civil society in the quest to eliminate poverty and ensure development. The complex and multi-dimensional nature of poverty warrants that strategies for poverty reduction should encompass plans for rapid pro-poor economic growth, sound macroeconomic policies, structural reforms and social improvement. Therefore, the focus of strategy is on:
The key elements of the PRS include: (a) introducing a series of macroeconomic and sectoral reforms; (b) promoting agricultural policies geared towards robust and sustainable growth through efficient import-substitution, export orientation, enhanced productivity and poverty reduction; (c) developing an open, market driven, innovative and dynamic industrial sector; and (d) and using information technology as an impetus to generate economic growth in the country. In addition, the PRSP views environment and natural resource management as the main factors which could significantly contribute in poverty alleviation, through community mobilization and organization for improved governance with a focus on minimizing environmental degradation and pollution, eliminating the root causes of environmental degradation (population pressures and poverty) and integration of environment and development to achieve sustainable development.
The programme proposed in this PD will significantly contribute to the achievement of the objectives of PRSP by proposing and being instrumental in making policy reforms, promoting inter-departmental coordination for sustainable development, and regeneration of economic activities.
National Environmental Action Plan (NEAP)
The first effort to introduce specific legislation for environmental protection in Pakistan was made in 1977. Since then, many institutional, policy and regulatory developments have taken place at the federal and provincial levels. These include, among others, the creation of the Ministry of Environment and environmental protection agencies, promulgation of the Pakistan Environmental Protection Act in 1977 and the Pakistan Environmental Protection Ordinance in 1983. In 1992, the Pakistan National Conservation Strategy (NCS) was developed, and in 1999 the NCS was subject to mid-term review. The NEAP was approved by the Pakistan Environment Protection Council chaired by the Chief Executive in February 2001.
The development objective of the NEAP is to initiate actions and programmes for achieving a state of the environment that safeguards public health, promotes sustainable livelihoods, and enhances quality of life of the people of Pakistan. It will focus on taking immediate measures to achieve a visible improvement in the rapidly deteriorating quality of air, water and land, through effective co-operation between the government agencies and civil society.
Based on the lessons learnt from projects that have attempted to address the issues of poverty-environment nexus, the NEAP strategy calls for shifting the focus, capacities and resources in a limited number of core areas where a high level of impact can be achieved in the near term. It recommends a programme approach as opposed to project approach which has evident merits, such as a higher level of flexibility in addressing core issues, maintaining priorities, directing the actions towards pre-defined targets, and responding to cross-cutting issues, e.g., gender, poverty reduction, capacity building, etc. The NEAP is based on poverty-environment nexus and it is planned to take the following measures to achieve its objectives:
The NEAP will implement the above measures and actions through the following major sub-programmes.
The major beneficiaries of NEAP will be the poor in rural and urban areas who are suffering from air and water pollution and degradation of natural resources, especially the women and children. The private sector will also benefit from NEAP activities because of exposure to economical and eco-friendly production processes which will result in creation of job opportunities. The second line of beneficiaries will be the institutions at various levels and NGOs whose capacities will be strengthened as a result of NEAP activities. Last but not the least, the beneficiaries of NEAP will be several species of animals and plants, which are under severe threat due to degradation of their ecosystems.
While the institutional/implementation mechanisms for the individual programmes will inevitably vary, a common institutional framework has been proposed by NEAP for efficient utilization of available resources. The framework is based on ensuring high-level political and administrative commitment to the programmes, allocation of sufficient resources, providing professional leadership, and instituting a system of monitoring at all levels of implementation (Figure 2). It is planned to encourage private sector, NG0s and citizen groups in the execution of projects to the extent possible.
The NEAP implementation strategy calls for raising mass awareness at different levels. It will be linked with the specific initiatives in the key departments and institutions at the federal level including the EPA, Office of the Inspector General of Forests Parks and Wildlife, and the Office of the Director General Environment. Expertise for mass awareness will be made available in the Programme Support Units attached to these departments.
The proposed programme goes much beyond the technical scope of NEAP. It will provide support in the implementation of main sub-programmes outlined above, strengthen the implementation and monitoring arrangements envisaged in the NEAP, and will further cover areas such as environmental disaster management in dry-land (drought prone) areas, environmental governance, energy generation, and strengthening capacities of CBOs in environmental management and natural resources conservation.
Other Government Initiatives
As mentioned earlier, the Government has recently taken concrete steps to implement the Devolution of Power Plan and Information Technology Policy. These initiatives provide necessary impetus to translate the environmental management agenda described above. Main features of these initiatives are summarized below.
Devolution of Power Plan: In the present system, the local governments have not enough authority over the development activities in their areas, therefore, their role in the national development is limited. However, the present government has announced a strategy for the reconstruction of local governments. Under the new strategy, Village Councils, Union Councils and District Councils will be established through a democratic process, which will also allow equal representation of women in each council. The district administration will be headed by the Chief Mayor (Nazim) and coordinated by a District Coordination Officer (DCO). The Chief Mayor will create a development vision for the district with the support of government, the private sector, civil society organizations and the local level institutions, such as Village-, Union- and Tehsil-councils. A District Officer will head each District Department. The administration will consist of 13 departments, including one on Environment, headed by District Officers and Deputy District Officers in-charge of specific functions within them. Assistant District Officers will be located in Tehsil towns, wherever possible. The district administration will initially be set up with the existing line departments. However, it will gradually move towards the corporate governance driven by an entrepreneurial approach.
The NEAP-SP will provide opportunities to the officials of line departments engaged in development work with local communities in the pilot areas to implement initiatives in sustainable development, particularly those, which are directly related to poverty-environment nexus. Training in Participatory Learning & Monitoring (PLM) as provided by the linked Poverty Alleviation and Sustainable Development Facility set up in the Planning Commission, would facilitate flow of information and refinement of plans at various levels. The members of various councils and Citizen Community Boards (at the village level) will surely need training/information in sustainable development, participatory planning, implementation and monitoring, and the programme proposed in this PD would play an instrumental role in this regard.
Information Technology Policy: The GoP has also launched its Information Technology (IT) policy whereby software parks are being established in the country, along with several other ventures, to absorb the youth in income generation activities. It is envisaged that with its linkage with the PAF, NEAP-SP would set up a PLM facility by using the state-of-the-art IT and by capitalizing cooperation of various on-going projects, such as Sustainable Development Network (SDN). The Information sharing through internet, e-conferencing, databases, e-workshops, e-study tours, etc., would bridge the gap between the professionals, policy community and public at large. These activities will directly contribute in achieving the UNDP Administrator’s and GoP’s plans for IT discussed under the Section on PRSP.
10 Year Perspective Plan 2001-2011: In addition to the above, the Government of Pakistan is currently working on the development of a 10 year perspective plan for 2001-2011 under the aegis of the Planning Commission. The NEAP Support Programme would greatly contribute to this process.
4.1.3. NGO Framework in Pakistan
NGOs are registered in Pakistan under the Societies Registration Act of 1860, Trust Act of 1882, Charitable & Endowments Act of 1890, Cooperatives Society Act of 1925, Voluntary Social Welfare Agencies (Registration & Control) Ordinance of 1961, Companies Ordinance of 1984 (for non-profitable companies). The Government has given substantial freedom to NGOs for participating in development and policy work. Notable national NGOs include: National and Provincial Rural Support Programmes, Orangi Pilot Project, Aurat Foundation, Banh Beli, Sustainable Development Policy Institute, Leadership for Environment and Development (LEAD), etc. The key international NGOs operating in Pakistan are: IUCN, WWF, ActionAid, Agha Khan Rural Support Programme, etc. These NGOs are implementing some major Government- and donor-assisted programmes.
4.1.4. Pakistan Experience in Development Work through CBOs / NGOs
Pakistan applies community-based development approach in many of its projects, such as the UNDP-assisted Area Development Programme AJK, Area Development Programme Balochistan, Pakistan Community Development Project for Rehabilitation of Waterlogged and Saline Land, Mountain Areas Conservancy Project, GEF Small Grants Programme, Local Initiative for the Improvement of Urban Environment and National Rural Support Programme. In these projects, communities are organised into Community-Based Organizations (CBOs) and Women Organizations (WOs) conducting development work with the technical guidance of the projects. In some areas, the CBOs are at an advanced stage of development and many of them are clustering in the form of national NGOs. This approach is considered to be a highly successful intervention of UNDP.
4.2. UN Policies
4.2.1. UN Policy Framework at the Global Level
In 1992, UN Conference on Environment and Development (UNCED) - called the Earth Summit, held in Rio de Janeiro - resulted in drawing attention towards the urgent problems of environmental and socio-economic challenges. As a result of the Conference, a plan for achieving sustainable development in the 21st century labeled Agenda 21 was adopted (ref. http://www.un.org/esa/sustdev/agenda21). Furthermore, three Conventions were elaborated concerning Biodiversity, Climate Change, and Desertification Combat, respectively (ref. http://www.biodiv.org, http://ccc.de, http://unccd.int), and the Rio Declaration and the Forest Principles was adopted (ref. gopher://gopher.un.org/00/conf/unced/english/forestp). The Commission on Sustainable Development (CSD), created in December 1992, ensures follow-up to UNCED and reviews reports on implementation of the Earth Summit agreements at the local, national, regional and international levels by the participating governments. Agenda 21 recognizes that the UN system, with its multi-sectoral capacity and extensive experience in international cooperation, is uniquely positioned to assist governments establish more effective patterns of economic and social development reflecting sustainable environment management. Pakistan is a signatory to Agenda 21, and has signed and ratified all three above mentioned Conventions.
Subsequent UN conferences have underscored the relationship between human rights, population, social development, women, human settlements and the need for sustainable development. The World Conference on Human Rights held in Vienna in 1993 stressed the rights for all to healthy environment and development.
The Earth Summit+5, a Special Session of the General Assembly held in June 1997, adopted a comprehensive document entitled "Programme for the Further Development of Agenda 21", prepared by the CSD. The Earth Summit+10 is scheduled to take place in September 2002, in Johannesburg (ref. http://www.johannesburgsummit.org).
The present Programme aims at renewed and concerted efforts to implement Agenda 21 in Pakistan, through information sharing, integration and participation. The pilot projects included in the programme would assist in the implementation of Convention on Biodiversity (CBD), Convention to Combat Desertification (CCD) and UN Framework Convention for Climate Change (UNFCCC). The Programme will emphasize gender sensitivity to achieve equitable distribution of benefits, which is in line with the global Beijing Platform for Action and the related National Plan of Action prepared by the GoP for the advancement of women. In this way, the Programme would address several analogous commitments vis-à-vis poverty alleviation. Reference will be made to the resolution coming out of the Social Summit+5, held in Geneva 1999, where global targets were agreed for poverty alleviation worldwide. Most importantly, these targets were further elaborated and adopted by the UN Millennium General Assembly and the Millennium Summit (ref. http://www.un.org/millennium, click on Millennium Summit and Declaration). The Millennium targets are listed in Annex II.
4.2.2. UN Pakistan
UN Pakistan has prepared a number of policy documents including "Integrated Follow-up to Global Conferences" and "Statement on Gender in Pakistan". These policy documents provide an analysis of the development issues at the macro-level and a framework for future programme in the country and call for the attention of GoP for policy reforms and more investments on human resource development, poverty alleviation, removal of gender disparities, and sound environmental management. Led by the UN Resident Coordinator, the UN Country Team is composed of Heads of Agencies, and the Team is presently working on a Common Country Assessment to serve as bases for future UN assistance in the country. The interventions envisaged in this Programme are fully in line with the thinking in the Team.
4.2.3. GoP and UNDP Country Cooperation Framework
UNDP’s cooperation with Pakistan is outlined in the Country Cooperation Framework (CCF), 1998-2003. The overarching objective of CCF is poverty alleviation with emphasis on good governance and participation, including community empowerment. The first CCF Annual Review held in March 1999 concluded that the CCF is congruent with and relevant to Pakistan’s development strategies. The review also found that the four aspects of equity, collaboration and coordination, national ownership and participation, and efficiency and effectiveness had been actively addressed in the CCF projects/programmes.
The NEAP-SP will follow a programme approach and provide a flexible mechanism for providing technical assistance to the emerging needs of the country, in the poverty-environment nexus. It will take into account new initiatives, such as participatory learning and monitoring with support of Capacity 21 Programme, implementation of sustainable development projects at the local level, and integration of on-going and pipeline projects. Thus the NEAP-SP is consistent with the objectives of the current CCF.
In consultation with the Government coordinating agency Economic Affairs Division (EAD), and as per corporate policy, UNDP Pakistan prepared its first Strategic Results Framework (SRF) in May 1999 and later revised it in December 1999 to align it with the corporate SRF. The SRF is a planning tool, whereby UNDP Pakistan has aligned its efforts with a global results framework for UNDP, particularly in the areas of good governance, poverty alleviation and sustainable livelihoods, environment and gender. The NEAP-SP would contribute to achieving several outputs, outcomes and sub-goals listed in the SRF for Pakistan.
5.0 PROGRAMME STRATEGY
5.1 Innovation in the Spirit of Agenda 21
From problem description through capacity assessment to concerted efforts for capacity building, including innovative approaches to policy change and participation, the NEAP-SP has been formulated in the spirit of Agenda 21. The UN Commission on Sustainable Development monitors Agenda 21, and it will be reviewed next in connection with the Rio+10 Summit in Johannesburg 2002. The intentions and initial results of the present Programme will be presented at the Rio+10 Summit as part of Pakistan’s National Report to the Summit.
5.2 Support to the implementation of NEAP towards economic growth and poverty reduction without environmental losses
The NEAP-SP will help translate the recently adopted NEAP into initial action, while enhancing the poverty-environment nexus aspects in operational terms. The development objective of the NEAP-SP is environmental sustainability and poverty reduction in the context of economic growth. It is based on the concept that economic growth can be pursued without costs in the form of environmental losses or increased poverty, and rather with gains in the form of improved environment and reduced poverty.
The NEAP-SP will allow for a series of studies and actions formulated to achieve specific programme objectives supplementary to the ongoing projects under GoP/UNDP/GEF execution by the Ministry of Environment. Projects will be identified along the line, and additional resources will be mobilized. A few of these additional projects have already been formulated, and will be approved at the onset of the NEAP-SP, based on the existing GEF-OFP mechanism and project design which is in an advanced stage of development for subsequent approval by the Global Environment Facility. The intention is to coordinate better, learn more, harmonize and strive for synergy.
The NEAP-SP proposes a wide range of technical, institutional, regulatory, social and economic interventions in terms of different interventions grouped under the following six major sub-programmes: (a) policy coordination and environmental governance (b) pollution control; (c) ecosystems management and natural resources conservation; (d) energy conservation and renewables; (e) dryland management and water conservation; and, (f) support for grassroots initiatives; These sub-programmes, in addition to pursuing their technical objectives, will strengthen the institutional and technical capacities of relevant GoP institutions for participating in the international conventions/fora and contribute to the implementation of the conventions/treaties on natural resources protection and environmental management.
The MoELGRD and other environment related agencies (such as EPAs) will have to assume lead responsibility in co-operation with all relevant partners at national, provincial, district and local levels. Similarly, management of different ecosystems (such as: uplands, drylands, irrigated and marine coastal) constitute important elements of the poverty-environment nexus but activities related to these aspects are focused across many departments/institutions.
Participation of women in the Programme, at all levels including project level activities, will be promoted.
5.3. Poverty Alleviation and Sustainable Development Facility (PAF) – a key link with the Programme
Building on the NEAP and the PRS, as well as associated initiatives (e.g. the National Action Programmes on Biodiversity, Climate Change and Desertification Combat), the NEAP-SP will introduce change in terms of bringing the local realities closer to the policy making institutions of the country. Thus, new mechanisms will be piloted for horizontal and vertical dialogues, necessary to make correct diagnoses and to promote solutions that are feasible, acceptable and affordable to the local populations concerned. For this innovation to happen, the Poverty Alleviation and Sustainable Development Facility (see Section 6.2, SP-1) will be the key. This Facility will provide the mechanism for introducing innovation in all activities of the Programme, and will constitute the "launching ramp" from which local level diagnoses or best practices identified under NEAP-SP can be launched into the macro-policy sphere of the country’s economic development planning process. Therefore, the PAF will be implemented by a most centrally placed institution, namely the Centre for Research on Poverty Reduction and Income Distribution (CRPRID) coming under the Planning Commission. The Economic Affairs Division of the Ministry of Finance, in its capacity as government coordinating agency for development cooperation, will also be closely associated with the activities of the PAF. The PAF would be linked to NEAP-SP through the Steering Committee mechanism, by informing the PSC about the PAF activities. The PAF would be managed independently by the Planning Commission, with control over work plans and budgets remaining with the Planning Commission.
Through the NEAP-SP, environmental action in Pakistan will no longer be fragmented as hitherto, but clustered under common objectives and implemented under common leadership and with harmonized approaches, keeping all relevant institutions involved and informed. Hence PAF will help in building capacities and strengthening the existing structures with its activities and would be linked with the overall programme of NEAP-SP in this regard.
5.4. Sustaining Programme Impact
The following paragraphs highlight the sustainability aspect under different themes of relevance to the Programme.
5.4.1. Economic Sustainability
From the economic sustainability point of view, the major source of concern is to contribute for capturing an amount equivalent to 3-4% of the GDP that is lost annually due to environmental degradation. As a result of continuous depletion of the natural resources, ecosystems had become increasingly vulnerable to degradation--thus not being able to sustain the human and livestock population dependent upon them. Implementation of the proposals advocated in this document is essential to reverse these trends. Subsequently, continuation of different elements of the programme is also imperative to sustain the programme impact in years to come. After the Programme’s duration, the district administrations must continue to receive, or to collect through taxes, the same budgetary resources (in real terms) as would be made available to them during the programme life.
5.4.2. Environmental Sustainability
Industrial and vehicular pollution, water quality deterioration, ecosystem degradation, and depletion of natural resources are the major environmental hazards that the country is facing within the context of poverty-environment nexus. The environmental impact of the programme proposed herein is expected to be positive since it aims to combat pollution, improve environmental health conditions and reverse the natural resources exploitation trends. Presently, the EPA is charged with advising the Government to maintain the quality of the environment, including the establishment and enforcement of NEQS. The Programme will contribute towards creating conducive conditions through improved institutional and public awareness means in which strict enforcement of laws and standards is possible.
5.4.3. Technical Sustainability
The capacity building programme proposed herein is designed to turn various institutions involved in the implementation of present programme fully operational both in terms of technical and managerial capabilities. On the technical side, a significant portion of the programme resources would be devoted to research and development activities such as planning and execution of various studies, implementation of pilot projects and action plans, and establishment of environmental accounting and monitoring system etc. Also, human resources development is envisaged through an extensive training plan. As a result, at the completion of the programme, these institutions should be able to meet their mandates with respect to environment and natural resources management--thus ensuring that the programme is technologically sustainable.
5.4.4. Institutional Sustainability
Institutional sustainability to a large extent is linked to the fact that as to what extent various implementing agencies will be able to perform their functions and mandates. Performance of their managerial and technical staff, as well as the financial resources made available to these institutions to carry out their functions, are also crucial to their sustainability. High performance of managerial and technical staff is expected since they will be chosen based on merit. In view of the existing civil service structure, designing effective performance incentives is very difficult. Sustaining the costs of such incentives in the long-term may be even more challenging. However, provision of financial incentives in terms of field allowances to the technical staff while on field duty is an existing practice, which can be continued--but there is a need to rationalize this allowance more in line with the actual cost of living. In addition, some critical management interventions are required very early in the programme life to secure basis for institutional sustainability. These interventions include: (i) restructuring of Ministry’s organizational structure to bring it in line with its strategic goal; (ii) establishment of different PUs and PSUs and making them functional; (iii) training of the staff of implementing institutions, (iv) coordinating inter-sectoral activities within the framework of national environment policy; and (v) continuous orchestration of above interventions so that they reinforce each other, even though political and decision making environment may change. With these conditions in place, institutional sustainability is guaranteed to a large extent.
5.4.5. Socio-cultural Sustainability
The crisis stemming from poverty-environment nexus have significantly disrupted the socio-cultural fabric of the large part of the population affected by environmental degradation. The proposed programme will provide a better understanding of the local situation in a number of areas, improving the conditions for decentralization and public participation. The programme will prescribe measures that will contribute towards alleviating poverty through improved environment and natural resources management. Better planning tools and decision making criteria will result in efficient allocation of natural resources among alternative uses, thus leading to maximization of social and economic benefits. The programme will especially consider the situation of women, providing possibilities for them to play an effective role in conserving natural resources and improving environmental health conditions. The women will be trained under the public awareness component of the programme to make efficient resource allocation and utilization decisions. The proposed programme provides sufficient opportunities for the female technical staff of the implementing agencies to enhance their technical skills using the training opportunities provided therein. The improved environmental health conditions realized as a result of this programme will uplift the health situation of women and children relatively more since they suffer most due to poor environmental conditions.
SECTION III
PROGRAMME OBJECTIVES AND MANAGEMENT
6.0. PROGRAMME OBJECTIVES
The development objective supported by the NEAP-SP is environmental sustainability and poverty reduction in the context of economic growth. For this purpose, the NEAP-SP supports the implementation of the NEAP, and the environmental aspects of the PRS, aiming towards an economic growth without costs in the form of environmental losses or increased poverty, and rather with gains in the form of improved environment and reduced poverty.
The NEAP-SP proposes a wide range of technical, institutional, regulatory, social and economic interventions in terms of different interventions grouped under the following six major sub-programmes: (a) policy coordination and environmental governance; (b) pollution control; (c) ecosystems management and natural resources conservation; (d) energy conservation and renewables; (e) dryland management and water conservation; and, (f) support for grassroots initiatives. These sub-programmes, in addition to pursuing their technical objectives, will strengthen the institutional and technical capacities of relevant GoP institutions for participating in the international conventions/fora and contribute to the implementation of the conventions/treaties on natural resources protection and environmental management. Moreover, the proposed programme will promote participation of women at all levels and particularly at the project level.
The six sub-programmes have been designed to respond to the needs and address issues through one or more projects for each component. The sub-programmes and their respective components are shown in Figure 3. This section outlines the Programme-specific objectives and the technical justification for selecting each component, followed by a sub-section on the management of the Programme.
6.2. Programme Objectives and Sub- Programmes Description
Following is a list of the programme objectives along with the action plan to achieve these objectives. The sub programmes along with their components are outlined with the respective objectives.
6.2.1. Programme Objective 1: Strengthening national institutions for environmental policy formulation, coordination and governance so as to address issues related to poverty-environment nexus in a coordinated and integrated manner. The sub-objectives include:
Sub-Programme 1: Policy Coordination & Environmental Governance
This sub-programme is really the hub of NEAP-SP. It will focus on bringing policy change to conserve environment and combat poverty as well as promoting inter-ministerial coordination to influence the national planning process. Environmental education, accounting, monitoring and regular publication of the state of environment report will be the other features of this sub-programme to bring an attitudinal change.
Component 1.1: Policy Planning and Coordination
The MoELGRD is expected to assume greater responsibilities with respect to environmental policy formulation. Moreover, there is a strong need to coordinate these functions at the federal, provincial and local levels. The existing capacities within the Ministry are limited to cope with these responsibilities. This component will provide assistance in establishing an environmental policy analysis unit in the MoELGRD for policy research. This unit would also provide support to the Ministry in fulfilling its commitments to international conventions that it is signatory to. This would include strategy development and enforcement for the GEF programme in Pakistan.
Component 1.2: Environmental Information Management System
This component will facilitate the highest level decision making by providing an objective analysis of the country’s environmental situation and its impacts on different sectors of the economy. Under this component, an environmental accounting and monitoring system (EAMS) will be established which will consist of: (i) information system; (ii) decision support system; and (iii) coordination and reporting system.
Component 1.3: Environmental Education and Awareness
Environmental awareness in recent years has grown considerably in certain segments of the society. However, large population (especially women and children) still remains uneducated about the sources of pollution and the environmental health risks associated with different types of pollution. Thus, there is a need to expand the environmental knowledge base as means to secure basis for sustainable environmental and natural resources management. This component will assist in launching large-scale public awareness campaigns, as well as in introducing environmental educational material in schools, colleges and universities.
Link with SP-1: Poverty Alleviation and Sustainable Development Facility (PAF)
The main purpose of this facility which will be closely linked to the NEAP-SP through the Programme Steering Committee, is to influence the policy making and planning process to address the issues of sustainable development in the context of poverty alleviation and environmental enhancement. This involves setting up of a "Participatory Learning and Monitoring Facility" (PLMF) to provide training in participatory approaches in planning, implementation and monitoring for supporting the "Devolution Plan" of GoP. The interventions envisaged under this Facility would directly support the implementation of Agenda 21 and recommendations of several other conventions, vis-à-vis Poverty Reduction Strategy, Local Government Plan and Information Technology Policy of the GoP.
Support will also be provided to conduct policy research, advocacy and monitoring of poverty through the Center for Research in Poverty Reduction and Income Distribution hosted by the Planning Commission of Pakistan. A summary note on the PAF initiative is attached as Annex III.
6.2.2. Programme Objective 2: Improving environmental health conditions by minimizing industrial, vehicular, indoor and urban pollution and by protecting drinking water quality. The Sub-objectives include:
Sub-Programme 2: Pollution Control
This sub-programme comprises of 6 components, namely, industrial, vehicular and indoor pollution, urban management, water quality protection and hazardous waste management. These components are inter-linked and also are a priority action area under the NEAP. The importance of each component is given as follows:
Component 2.1. Industrial Pollution
Industrial pollution is a major problem in Pakistan, and little effort has been made until comparatively recently, either to use clean production technologies, or to adopt end-of-pipe methods of pollution control. The minimal response of industry to pollution control is mainly due to the poor performance of the sector, lack of information about new technologies and high investments required for changing the processes coupled with weak regulatory mechanism.
Pollution problems affect both large enterprises in such industries as chemicals, petroleum refining, sugar, paper and pulp and iron and steel, as well as the many clusters of small- and medium-sized enterprises in industries such as leather, textiles, marble polishing and food processing. UNIDO is assisting GoP in the formulation of an integrated programme to support capacity building for sustainable industrial development. The assistance will be in the following 5 sectors, namely, (a) cleaner production and environmental management, (b) institutional capacity-building for small- and medium-sized enterprises, (c) metrology, standardization, testing and quality, (d) regional development, and (e) industrial investment promotion and technology transfer.
The NEAP-SP will cater to the area of promoting cleaner production in highly polluting industries, through waste minimization, reuse and recycling and end-of-pipe treatment to minimize pollution, and also to support the EPAs in enforcing the NEQS, conducting EIAs and collection of pollution charges. Likewise, NEAP-SP will also provide technical support for the implementation of agreements under the Montreal Protocol for the phase out of ozone depleting substances, through continued funding for the ozone cell in MoELGRD.
Component 2.2: Vehicular Pollution
Pakistan imports almost 3.8 million tons of oil per annum at a cost of about US $ 581 million. These oil imports are further increasing proportionally to the ever-rising human and vehicular population. Another problem directly associated with the road transport sector is its contribution to air pollution. Owing to the high proportion of old and poorly tuned engines and the dependence on buses and light commercial vehicles in metropolitan areas, air pollution along busy roads is greater in magnitude than would be expected for the number of vehicles on the road.
Air pollution is caused by suspended particulate matter, sulfur dioxide, carbon monoxide, nitrous oxides and lead. Motor vehicles account for 90% of the total emissions of hydrocarbons, aldehydes and carbon monoxide in cities, and for 75% of all sulphur dioxide and nitrogen oxides. The suspended particulates in air cause lung irritation, sinus problems, bronchitis and asthma, whereas lead emitted by gasoline vehicles causes liver dis-function and impairment of mental health. A recent study conducted by the Agha Khan Medical University concluded that 80% of the sampled children in Karachi had less than normal IQ level. The main objective of the initiatives under this component is to help in minimization of pollution caused by automobile emissions.
Component 2.3: Urban Management
During the last several decades, migration has occurred from rural to urban areas. The chief factors responsible for this migration are: slow progress in the agriculture sector, low crop yields, lack of alternate employment opportunities and environmental degradation due to waterlogging / salinity, deforestation and desertification. The large rural influx has, in turn, contributed to the overburdening of urban infrastructure and urban services. There has not only been a rapid decline in the quality and availability of basic urban resources and amenities, such as housing, potable water, transportation, electricity, gas, drainage and sewage but also mushrooming of katchi abadis (squatter settlements), often located on the most marginal land. Today, squatter settlements account for about 25 to 30% of Pakistan’s overall urban population. The municipal institutions do not have sufficient resources and technical capacity to accommodate the needs of increasing urban population. Assistance under this component will be targeted to strengthen the technical and managerial capacities of municipal administrations for improving health, sanitation, education, shelter, employment and income generation of the poor.
Component 2.4: Water Quality Protection
During the last several years, Hepatitis-B is on the rise in major cities, which is mainly due to the mixing of sewage with the drinking water. Likewise, recent studies have revealed the presence of residues of pesticides, nitrates and nitrites in drinking water above the NEQS limits. During 2000, a bone deformity disease appeared in the form of an outbreak in the peripheries of Lahore, which is attributed to the contamination of groundwater by fluorine. These cases warrant regular monitoring of the groundwater quality, especially the drinking water to minimize the health risks. Therefore, support under this component will be provided to strengthen institutional capacities to develop and implement water quality monitoring programme, as well as to enforce approved standards to ensure the supply of safe drinking water.
Component 2.5: Indoor Pollution
Major sources of indoor pollution are gaseous emissions from burning of fuel-wood and kerosene, dust, paints and other chemicals used in polishing. The main objective of this component is to improve health and environmental conditions at the household level by minimizing indoor pollution.
Component 2.6: Hazardous Waste Management
Effective control of the generation, storage, treatment, recycling and reuse, transport, recovery and disposal of hazardous wastes is of paramount importance for proper health, environmental protection and natural resource management, and sustainable development. This requires active cooperation and participation with the international community, and large enterprises, including transnational corporations and domestic industry. The component will support capacity building measures for prevention of the generation of hazardous wastes and the rehabilitation of contaminated sites. This would include aspects of hospital waste management.
6.2.3. Programme Objective 3: Sustaining livelihoods through efficient and integrated management of different ecosystems and improved natural resources management. The Sub-objectives include:
Sub-Programme 3: Ecosystems Management and Natural Resources Conservation
This sub-programme comprise of 5 components, namely, upland ecosystems, marine and coastal ecosystem, irrigated ecosystem, wetlands and protected areas management covering all the major ecosystems in the country. The sub-programme as a whole will complement the proposed actions under the National Environment Action Plan (NEAP), particularly, for testing various management models and institutional mechanisms proposed under the Eco-systems management Programme of NEAP. Description of each component is given as follows:
Component 3.1: Upland Ecosystems Management
As mentioned in Section 1, the major issues of uplands ecosystems include: deforestation, degradation of watersheds, soil erosion and loss of biodiversity because of growing human and livestock populations and insensitivity to environmental issues in the national planning process. As ecosystems cannot sustain the rapidly growing human population, there is a widespread poverty in the Northern Areas, Azad Jammu and Kashmir (AJK) and Balochistan. Therefore, this component aims to provide support towards alleviating poverty through integrated and efficient management of natural resources in the upland ecosystems.
Component 3.2: Marine and Coastal Ecosystems Management
The marine and coastal ecosystems are under a great deal of stress because of the exploitation of mangrove forests, discharge of all the municipal and industrial effluents (untreated) into the sea and spillage of oil, chemicals, etc., at the harbor, which also goes into the sea. All these factors are contributing towards the loss of important species, such as marine turtle, etc., and loss of revenues because of very low tourism activities. Thus, assistance under this component will be targeted to improve the marine and coastal environment by protecting and conserving the ecosystems and species through an integrated approach.
Component 3.3: Irrigated Ecosystems Management
There is evidence that crop yields in the irrigated ecosystems are stagnant for the last several years. The main causes of reduced land productivity are: shortage of irrigation water, salinity and sodicity, waterlogging, flooding and loss of organic matter (96% of the sampled soils). These problems often occur simultaneously and produce synergistic impacts on agricultural productivity. Growing of crops on soils deficient in organic matter for years is also resulting in deficiency of vital micro nutrients, which lead to further reduced crop production. In fact, the poor performance of the agriculture sector is the principal cause of migration of farm workers to cities, which is resulting in degradation of the urban environment. The main objective of this component is to contribute towards alleviating poverty by increasing farm incomes through sustainable management of land and water resources.
Component 3.4: Wetlands Management
The wetlands in Pakistan serve as flyways for various bird species, some of which are of global significance. The bird species are threatened because of uncontrolled hunting and deterioration of water quality because of the discharge of industrial and municipal effluents and agricultural run-off. However, under the Ramsar Convention, Pakistan has a commitment to protect bird species and their habitat. Therefore, this component aims to develop and implement a well-defined system of intervention and strategic plan for the conservation and protection of the diversity of global significance in representative wetlands of Pakistan. This includes identification and classification of wetland resources, review and strengthening of institutional capacity, training and enhancing human resources capabilities in research, planning, administration and management of wetlands and their resources.
Component 3.5: Protected Areas Management
Over the course of the past three decades, Pakistan's protected areas (PA) system has expanded to include 227 sites that are listed as protected areas on the national register. Although the overall number of sties and the percentage of the country considered protected (11.25%) are impressive, this figure includes sites established without a basis in legislation. If only sites established under Provincial and Territorial Wildlife Acts and Ordinances are considered, then their number drops to 200: 14 National Parks, 97 Wildlife Sanctuaries and 89 Game Reserves. If only the national parks and wildlife sanctuaries are considered as PAs, as these provide protection to biodiversity because they also protect habitat, then the overall number of protected areas is further reduced to 111- a drop of protected land from 11.25% to 6.5%. The objective of this component is to protect Pakistan's full range of biodiversity in representative areas and help maintain the natural ecosystem and associated cultural heritage by introducing systems approach which is systematic, logical, organized and goal-oriented, as opposed to an ad hoc and largely reactionary approach to the planning and designation of protected areas.
6.2.4. Programme Objective 4: Mitigating energy crisis/deficit by promoting practices leading to conservation of energy in all sectors of economy, viz., buildings, industrial, agriculture and transport sectors and adopting renewable energy technologies. The sub-objectives include:
Sub-Programme 4: Energy Conservation and Renewables
This sub-programme comprises of 2 components covering the exploration and exploitation of renewable sources of energy (wind, solar and hydel) as well as promoting energy conservation in all sectors of economy, vis-a-vis, buildings, industrial, agriculture and transport sectors by creating awareness to use energy efficient practices and appliances through demonstrative projects/ programmes. The sub-programme will contribute for developing and deploying renewables and also increasing energy efficiency, the two core areas of National Conservation Strategy (NCS).
Component 4.1: Energy Conservation
Pakistan meets about 40% of its petroleum requirements through imports. Petroleum products account for approximately 43% of primary energy supply in the country. The use of coal and oil for power generation is increasing which is highly detrimental to the environment. As of 1996, the country had an estimated 21 trillion cubic feet (cft.) of recoverable natural gas reserves and the estimated production is 1,600 million cft. per day, which falls just short of estimated demand (1700-1800 million cft.). Besides domestic and commercial uses of gas, its other major uses are power generation (32% of total gas consumed) and fertilizer production (26% of total gas consumed). The GoP's development priorities in the energy sector include renewed emphasis on energy conservation and cleaner and cheaper energy sources. Accordingly, this component will develop and promote measures, which result in energy conservation in all sectors of economy including buildings, industrial, agriculture and transport sectors.
Component 4.2: Renewable Energy
The potential for renewable energy has remained largely unutilized in the country. With the exception of mini- and micro-hydel power generation, this sector has been plagued by institutional and policy failures. Therefore, assistance under this component will be targeted to explore additional sources of energy supply, including promotion of renewable energy sources at a wider scale. This sector has a great potential to be tapped in collaboration with the private sector, especially in terms of investments for technological innovations, which have been proved successful in other countries.
6.2.5. Programme Objective 5: Sustaining livelihoods of poor communities in dryland areas (especially arid and semi-arid areas prone to drought and water scarcity) through better planning for disaster management and promoting community based initiatives for the restoration of environment and regeneration of natural ecosystems in these areas. The Sub-Objectives include:
c) To promote agriculture and livestock production in drylands.
Sub-Programme 5: Dryland Management and Water Conservation
Drought has become a serious problem in the Balochistan and Sindh provinces for the last about 3 years. It is further expanding toward the north-eastern areas. This sub-programme will focus on the management of dryland to protect the communities from the hazards of drought, through early warning to combat the drought effects and protection from flash floods, and also by promoting practices which are sustainable in the low rainfall / less water availability environment.
Component 5.1: Early Warning and Disaster Management
Recently national and international attention has focussed on a growing disaster in Pakistan- drought, particularly in the Provinces of Balochistan and Sindh and southern Punjab. Official reports of the impact of drought indicate considerable livestock loss and even human fatalities. It is estimated that 2.2 million people and 7.2 million heads of livestock have affected. More than 120 persons and 30,000 livestock have perished. Further analysis revealed that the institutional infrastructure for early warning and disaster management, particularly for disasters such as drought, is weak in the country. This programme will focus on the establishment of disaster management institutional infrastructure, improving water harvesting and conservation, watershed management and livelihoods of the vulnerable groups in dryland.
Component 5.2: Sustaining Livelihoods in Drylands
One of the principal reasons for the drought had been no rain in recent years. As a result, the stock of groundwater in fresh groundwater zones has considerably depleted. A number of areas in drought prone areas are already in a state of severe groundwater mining. Thus, there is need to develop long-term strategy for sustainable management of groundwater with an objective to sustain the livelihoods of poor communities by improved agricultural and livestock production and watershed management.
6.2.6. Programme Objective 6: Promoting community and NGOs based initiatives developed in the form of innovative micro-level projects on environment management geared towards localized poverty alleviation. The sub-objectives include:
Sub-Programme 6: Grassroots Initiatives
This sub-programme will focus on strengthening and utilization of NGOs and CBOs to implement micro-projects, which are innovative in nature or are in those geographical areas, which cannot be covered by any other major project. The sub-programme will strengthen capacities at the local level by supporting community actions in line with the devolution plan, within the areas specified in NEAP. The projects will be in the following areas:
Component 6.1. Environment and Natural Resources Management
Assistance under this component will be provided to support community led initiatives for improved environmental management and more effective natural resource conservation. This objective will be realized by implementing a series of localized projects in social forestry, community watch of deforestation, environmental management and natural resources conservation, including trophy hunting and private wildlife sanctuaries.
Component 6.2. Low-cost Technologies for Solid and Liquid Waste Management
This component aims to provide support to NGOs to implement projects, in collaboration with municipal institutions, which aim at improving the service delivery systems and consequently, the environmental health. The aim will be to introduce low-cost sanitation/ clean drinking water supply/solid waste disposal technologies.
Component 6.3. Promotion of Renewable Energy Technologies
This component will provide assistance in promoting low cost technologies for sustainable environment management and energy generation, and creating a conducive environment for community participation in the promotion of these technologies.
Component 6.4. Development of Green Enterprises
Assistance under this component will be targeted to improve environmental conditions by supporting home-based enterprises, which lead to environmental improvement by re-using or recycling household/industrial wastes. For this purpose, local communities will be linked to micro-credit and marketing enhancement programmes.
NEAP-SP Coordination Unit in Planning Division:
The Planning Division under the Member, Sustainable Development, through the Environment Section, will coordinate Planning Division’s inputs into the NEAP-SP, while focusing on the poverty aspects. The key tasks to be undertaken by the Unit would be as under:
7.0. OUTCOMES, OUTPUTS AND MONITORING INDICATORS
The proposed interventions are described in the form of a logical framework. For the time being, presentation of the logical framework has been limited only to these elements since a lot of planning work has yet to be carried out during the first phase (year) of the programme. This planning phase will define the expected outputs and related activities in more detail with due discussions with the relevant stakeholders. This work will subsequently enable to develop more concrete output indicators, targets to be achieved and costs associated with each of the planned output. However, this refinement process will be carried out within the technical scope of various sub-programmes outlined in the logical framework presented in Annex IV.
8.0. PROGRAMME MANAGEMENT
8.1 Main Elements of the Implementation Strategy
The main intent of the programme implementation strategy is to create an enabling institutional environment and conducive technical and social conditions to secure basis for integrated environment and natural resources management at the local, national and regional levels. Thus the strategy takes into account the specificity of the issues to be addressed, the current institutional setting, and the socio-economic features and constraints facing the country. More specifically, the programme implementation strategy will:
8.2. Role of the Ministry of Environment in the Programme
The Government of Pakistan through the Ministry of Environment has developed and adopted the National Environmental Action Plan. The NEAP-SP has been formulated to provide support for the operationalisation and implementation of the NEAP. The MoE will be the national executing agency entrusted with coordination and management of the Programme, assuming ultimate responsibility for the achievement of NEAP-SP objectives. This role has been detailed in Section 8.8 of this document.
A Programme Steering Committee (PSC) chaired by the Secretary Environment will be established, as described in section 8.8, to provide policy guidance to the project and monitor progress and performance. The PSC will facilitate inter-agency coordination of the project at the national level and will ensure the proper progress of the Programme.
Concerned federal, provincial and district authorities will be integrated in the management structure, as required, for the implementation of local level Programme components and activities.
8.3. Role of the CRPRID in the Programme
The Centre for Research in Poverty Reduction and Income Distribution (CRPRID) will be the implementing agency for the Poverty Alleviation and Sustainable Development Facility (see Section 6.2, SP-1). Since it is through this Facility that the Programme will be innovative, it is essential to have a most centrally placed entity forming a close link with the activities of NEAP-SP, and CRPRID based under the Planning Commission, is most well-positioned to take over this role. The role of CRPRID will be to implement the PAF in such a way so as to facilitate for all other implementing agencies to introduce innovation in their respective components. Though CRPRID will independently be implementing the PAF, it would maintain close coordination with the NEAP Support Programme through participation in Steering Committee Meetings. CRPRID, under the aegis of the Planning Commission (which is also a member of PSC) will furthermore, facilitate and monitor, the poverty aspects of all NEAP-SP components so that the Programme effectively addresses poverty-environment nexus concerns in sustainable development.
8.4. UNDP Role in the Programme
The present Programme has essentially been developed in close collaboration between the Government and UNDP. During this process, consultations were also held with a number of interested development cooperation partners. UNDP, in addition to providing its own resources, will assist in resource mobilisation. Some efforts in this direction are already underway (ref. Section 10). UNDP will assist in negotiating co-financing agreements, and manage or monitor resources as specified in such agreements. UNDP’s main role will be to assist MoE and the Planning Commission in the overall supervision and coordination of the Programme.
8.5. Linkage of On-going/Pipeline Projects with NEAP Support Programme
There are various on-going/pipeline projects that form a linkage with the NEAP Support Programme as there is an overlap of some of the outputs and activities planned under these projects and those planned under different Programme Components. The implementing agencies for some of the on-going projects are also the same as proposed for some of the related Programme Components. A brief description of the on-going/pipeline projects showing their linkage with the respective Programme Components of the NEAP Support Programme is provided in Annex V. The ongoing projects will continue their implementation as per their existing Project Documents, and will not form part of the NEAP-SP. The pipeline projects which would be signed after NEAP-SP approval, will be included as part of NEAP-SP.
8.6. Programme Phasing
The Programme will extend over five years and be implemented in three phases with some flexibility between phases: planning phase (one year), implementation phase (4.5 years) and results consolidation phase (half year).
The first phase of one year will focus on elaborating the proposed interventions, as well as putting in place the required institutional arrangements. Proposed interventions can be grouped in three categories. First, there are those which have already been defined in terms of project documents and detailed working papers. Second, there are some which have been sufficiently elaborated in the present document in the form of targets to be achieved, outputs to be produced and activities to be undertaken to realize the planned outputs. Third, there are some, which still need to be discussed with the potential stakeholders so as to translate them into concrete projects. During this phase, detailed concept papers (based on a simplified Format enclosed as Annex XI) will be prepared for each component, describing salient features of the projects to be implemented. The idea here is not to develop new projects—but only to add more details to the proposed interventions—staying within the technical scope of work outlined for each sub programme/component in the present document. However, if any donor/agency requires a separate document on a prescribed format, it will be developed but will not go through the LPAC process.
Elaborating the proposed interventions in terms of their technical scope and contents during the first phase will serve three main purposes. First, it will enhance stakeholders’ participation in the planning stage--thus promoting the process of national ownership. Second, it will pave the way for smooth implementation of proposed projects during the subsequent phases. Third, resource mobilization will become relatively easier as more concrete ideas and details about various programme components will be available to the potential donors. The detailed project concept papers will not be required to go through the formal government approval process. Approving this Programme will qualify these interventions to proceed with their respective implementation, subject to PSC approval. Main tasks to be accomplished during the first phase include:
The work plan for the first year of the planning phase of the programme is given in Annex VI.
The second phase of four and half years will be fully devoted to the implementation of interventions proposed under the PD, and projects developed during the first phase. Implementation of field level activities for some of the sub-programmes/ components initiated during the first phase will continue at full scale during this phase as well.
The final phase of six months will evaluate and consolidate the results of different sub-programmes for their transformation into follow-up action programmes.
|
Phases |
Year 1 |
Year 2 |
Year 3 |
Year 4 |
Year 5 |
|
Phase 1 |
|||||
|
Phase 2 |
|||||
|
Phase 3 |
8.7 Programme Finance
Total estimated cost of the programme is US$ 42.78 Million, but all the required resources are not immediately available. This means that the whole programme cannot be implemented in its entirety from the very beginning. Thus the Programme will be implemented gradually, as required resources become available. A resource mobilization strategy and work plan will be elaborated and followed as an integral part of the Programme. Some funding will be project-linked, some funding will be crosscutting for the Programme as a whole, for example to put the required institutional structure in place. For the purpose of resource mobilization, it will be important to prioritize components and activities, during the first phase.
8.8. Implementation Arrangements
Following the General Assembly Resolution 47/199 in 1992, the National Execution (NEX) modality has become the norm for projects and programmes assisted by the UN system, with due consideration given to the means and capacities existing in the country. The existing national capacities will be utilised to the maximum possible extent to deliver major part of the programme inputs in the form of: (a) recruitment of national consultants; (b) local procurement of equipment; (c) nationally executed subcontracts; (d) local training; and (e) field surveys and studies.
Executing Agency
The executing agency for the implementation of this Programme will be the MoELGRD, under the NEX modality. In this capacity, the MoELGRD will be responsible for the overall management of the implementation of the Programme. However, disbursement of funds for various activities will be based on the annual rolling work plans approved by the Programme Steering Committee and delegated to the respective implementing agencies by the National Executing Agency. The implementing agencies will be accountable to the National Executing Agency, and the Programme Steering Committee, for the use of allocated resources and for achieving the objectives of the Programme. (It should be noted that the institutional arrangements proposed hereunder are somewhat similar to those described in Annex VII for the implementation of NEAP. The intention is to contribute further towards strengthening the institutional framework proposed for the implementation of NEAP.)
Co-operating Agencies
There are two types of co-operating agencies that will be involved in the programme implementation, namely national and international. The national co-operating agencies are those which will work hand in hand with the national implementing agency to implement field level technical activities and tasks. National co-operating agencies anticipated to be involved in programme implementation would be various and are expected to be a government institution, private sector entity, community based organizations, and local NGOs. International agencies in most cases will be the UN specialized agencies which may provide assistance to the government implementing agencies in those specific areas in which available national capacities are not sufficient to meet the programme objectives. The decision on the co-operating agencies for specific activities would be the part of rolling plan, which would include information on the proposed agencies as part of the projects summaries attached to the annual plans. Table 2 identifies the possible cooperating agencies for different sub-programmes and their components. More names can be added to the list as implementation progresses.
External Technical Co-operation Agencies
Consistent with the UN mandate, under the NEX modality, efforts will be made to utilize the national capacities to the maximum possible extent to deliver major part of programme inputs. However, in cases where national capacities are limited, it is recommended that relevant implementing agencies may call upon the UN specialized agencies, international NGOs and other external organizations to provide technical assistance and backstopping. Within the context of the present programme, agencies which can provide such support are suggested in Table 2. These agencies could especially assist the PMIU/PIUs with international training programmes and international consultancy services as required.
Programme Implementation Structure
Implementation arrangements for this Programme include the establishment of the following units and committees:
A schematic presentation of implementation arrangements of the Programme is given in Figures 4 and 5. See also Annex VIII for detailed TOR/functions.
Programme Steering Committee (PSC)
Integrated environment and natural resources management can best achieve its objectives in a multi-sectoral development framework. This requires participation of leading institutional stakeholders in prioritizing the environmental agenda in line with the national development objectives and priorities. Moreover, the programme calls for active participation of many private and public institutions, it is not very unusual to face problems and constraints that go much beyond the administrative jurisdiction of programme/project administration. Therefore, it is essential to have an institutional mechanism in place to deal with such situations.
For this purpose, it is proposed that a PSC may be established to: (a) provide vision for long-term sustainable environmental management and poverty alleviation agenda; (b) improve the quality of decision making, sector efficiency and managerial performance in the planning and implementation of poverty / environment related programmes and projects; (c) advocate and ensure inter-ministerial coordination for long-term sustainable programme in all respects; (d) approval of rolling work plans on annual basis; and (d) mobilize further technical and financial assistance. This Committee will not be involved in the routine day-to-day programme management operations; instead its role will be to monitor programme progress and provide policy advice and guidance to the PMIU in achieving programme objectives.
This committee will be chaired by the Secretary, MoELGRD. The members include Secretaries of Ministries/Divisions of: (a) Economic Affairs; (b) Planning & Development; (c) Water & Power; (d) Food & Agriculture; and (e) Science & Technology, as well as heads of the EPAs and provincial P&Ds, a representative of Environment Donors Coordination Group (EDCG), and the UNDP Resident Representative. The Chair will have the discretion to expand membership of the committee, as needed, during the implementation of the programme. The PMIU will serve as Secretariat to the PSC to facilitate its operations and functions, and the NPD will be secretary to PSC. The committee will meet twice a year, or on need-basis.
Programme Management and Implementation Unit (PMIU):
Under the authority of the NPD, the PMIU will provide the technical, logistical and administrative support to the executing agency and all implementing agents in carrying out the planned tasks. In addition, it will be responsible for: (a) reporting on programme progress and impact; (b) identifying gaps and bottlenecks; (c) brokering donors support; (d) mobilizing and managing programme resources; (e) monitoring and evaluating programme performance and impact; overall budget management; and (f) reviewing and validating the continued relevance of the PD components and approach etc. The purpose is to ensure the effectiveness of the activities being undertaken; efficiency with which they are being implemented; the continued relevance of the proposed actions in an evolving environment to assess the impact and determine the sustainability of the outputs; and to propose corrective course of actions whenever necessary.
Programme Implementation Committee (PIC)
Coordination in implementation of different sub-programmes and their components will be realized through the establishment of a PIC. This committee will be chaired by the NPD. Its members will include National Programme Manager, Sub-Programme Directors and Sub-Programme Managers. This committee will meet on quarterly basis to discuss the programme management issues, work plans, budgets, implementation constraints, and potential solutions, etc. For all practical purposes, this committee will have the responsibility to ensure the implementation of programme activities and delivery of outputs in accordance with the approved work plan. This committee will also ensure as how to optimize the cross-cutting effects of different sub-programmes in harmony with the overall programme objectives.
In view of the integrated and very complex nature of the programme, it requires very high level of coordination, and within this context, needs to be linked to the upstream level decision making structure in the Government. Therefore, it is proposed that the Additional Secretary, MoELGRD be designated as the National Programme Director (NPD) to lead the programme. He/She will be facilitated in his/her functions by the National Programme Manager to be hired under the programme. The PMIU will ensure a continuous flow of information between the NPD, Sub-Programme Directors (SPDs), core technical staff, sub-programme managers, and external partners. The management of implementation of different sub-programmes, however, will largely be the responsibility of the Managers of the respective sub-programmes, under the authority of the respective SPD.
Specialised teams will be established under the PMIU to provide technical support to the relevant offices and agencies for each sub-programme. Each team will be headed by a Sub-Programme Manager to be hired under the programme. The PMIU and its technical teams will be staffed by qualified national professionals recruited on merit, and based on the required level of competencies. List of the staff to be hired under the programme is given in Annex IX. Staffing gaps in areas with limited national capacities will be bridged through international expertise. For this purpose, the PMIU in consultation with the national executing agency, may seek technical assistance from the specialized UN agencies.
Sub-Programme Implementation Committees (SPICs)
The SPICs will be chaired by the respective Sub-Programme Director. The following government officials be designated as the respective Sub-Programme Directors (see Figure 5):
SP-1 Policy Coordination, Environmental Governance & Education --- DG , MoELGRD
SP-2 Pollution Control --- DG (Federal EPA), MoELGRD
SP-3 Ecosystems Management & Natural Resources Conservation --- IG (Forest), MoELGRD
SP-4 Energy Conservation and Renewables --- MD (ENERCON), MoELGRD
SP-5 Dryland Management and Water Conservation --- Designate P&DD, Sindh&Bal.
SP-6 Grassroots Initiatives --- DG , MoELGRD
Each sub-programme consists of a number of components, while each component encompasses various interventions defined in terms of different projects. This essentially means involvement of wide range of stakeholders in the implementation of field level activities. These stakeholders may belong to public institutions, private sector groups, local communities, and NGOs etc. Thus, there is a need to coordinate their activities and actions in order to facilitate mobilization of local knowledge (in terms of identification of problems and their potential solutions) and resources into the planning process.
It is therefore proposed that various partners (both public and private) responsible for implementing various components of each sub-programme may be organized in the form of a SPIC to: (a) improve the quality of decision making at the sub-programme level in the planning and implementation of environment related projects; (b) coordinate sub-programme level activities to avoid duplication of efforts and promote inter-departmental / inter-ministerial coordination on need-basis; (c) provide technical advice and guidance to the PIU and its teams; (d) promote sharing of knowledge, experience and data among the agencies and individuals participating in the SPIC; and (e) review technical outputs to be produced under the sub-programme. The SPICs will meet on quarterly basis. The respective PIU should serve as its secretariat to facilitate its operations and functions.
Programme Implementation Units (PIUs):
PIUs will be established for sub-programmes. The PIUs will be headed by Sub-Programme Managers hired for the purpose. The PIUs will be responsible for the procurement and delivery of programme inputs and their conversion into outputs. This entails the following activities: (a) recruitment of national experts and consultants; (b) local procurement of equipment; (c) management of nationally executed subcontracts; (d) local training; (e) development of detailed work plans and budgets; and (f) undertaking of any other activities identified in the Programme as being the responsibility of the implementing agents.
The implementing agencies will assign their own staff for implementation of programme activities. The Programme will pay the travel cost / operational expenditures of the attached staff but not their salary.
Table 1. Implementing / Cooperating Agencies for Various Sub-programmes and Their Components
|
Sub-Programmes/ Components |
National Cooperating Agencies/Agents |
Potential Int'l Cooperating Agencies |
Level of Action |
|
SP.1: Policy Coordination and Environmental Governance |
Lead Implementing Agencies: Office of the Director General (MoE) and Economic Affairs Division |
||
|
1.1 Policy Planning and Coordination |
EPAs, Planning Division, Provincial P&DDs, IUCN, WWF, SDPI |
National |
|
|
1.2 National Sustainable Develop. Facility |
P&D Depts., CBOs, NGOs, District Administration, SDNP |
CAP 21, UNHSF |
National / District/Local |
|
1.3 Environmental Information Management System |
EPAs, Planning Division, Provincial P&DDs, IUCN, PCSIR |
National, Provincial |
|
|
1.4 Environmental Education and Awareness |
Ministry of Education, University Grants Commission, Provincial Education Departments, LUMS, FAST, NUST, GoP & private institutions |
National |
|
|
SP 2: Pollution Control |
Lead Implementing Agency: EPA |
||
|
2.1 Industrial Pollution |
Ministry of Industries / Petroleum & Natural Resources, FPCCI, NTC, ETPI, Provincial Industrial Departments, Research and Policy Institutes, oil refineries |
UNIDO |
Main industrial areas / cities |
|
2.2 Vehicular Pollution |
District Management, Traffic Department, HDIP, ENERCON, NTRC, NHA |
Main cities |
|
|
2.3 Urban Management |
Municipal corporations, Directorate of Katchi Abadis, Private Sector, Local Communities, NGOs, Orangi Pilot Project |
UNICEF (in sanitation aspects), WB |
Main urban towns and katchi abadis |
|
2.4 Water Quality Protection |
Municipal Corporations, Water & Sanitation Agencies, CBOs |
UNDESA, UNICEF |
National |
|
2.5 Indoor Air Pollution |
Private Sector (manufacturing groups) |
National |
|
|
2.6 Hazardous Waste Management |
National Institutions, Private Sector (industrial entities, importers) |
National |
|
|
SP 3: Ecosystems Management and Natural Resources Conservation |
Lead Implementing Agency: Office of the Inspector General of Forests and Wildlife, MoELGRD |
||
|
3.1 Uplands Ecosystem Management |
Provincial Forest & Agric. Departments, District Council, Local Communities, NGOs, Pakistan Forest Research Institute, WWF, IUCN, Zoological Survey Dept. |
FAO, WB, CIDA, SDC, EU |
District/Local |
|
3.2 Marine & Coastal Ecosystem Mgmt |
Marine Pollution Control Board, P&DD, Private Sector, National Institute of Oceanography, Marine Biology Department (Karachi University), IUCN, WWF |
Local |
|
|
3.3 Irrigated Ecosystem Management |
Provincial Irrigation and Drainage Authorities, Provincial Water Mgmt. Directorates, P&DDs Federal Water Mgmt Cell, Water Users Groups, WAPDA |
UNDESA for Water Mgmt. aspects, IWMI for community based irrigation mgmt., WB, AsDB |
District/Local |
|
3.4 Wetlands Management |
National Wetlands Mgmt Committee, National Council for Conservation of Wildlife, Provincial Wildlife Departments, WWF, Private sector, IUCN, NDP |
JICA, EC, Ramsar Secretariat |
District/Local |
|
3.5 Protected Areas Management |
Provincial Wildlife Departments, District Councils, Tourism Dept, Corporate Private sector, WWF & IUCN |
District/Local |
|
|
SP 4: Energy Conservation and Renewables |
Lead Implementing Agency:National Energy Conservation Center (ENERCON) |
||
|
4.1 Energy Conservation |
Energy Wing (MoPD), NGOs, Private Sector, Research and Development Institutes, , WAPDA, NUST, Private sector |
National / Local |
|
|
4.2 Renewable Energy |
Energy Wing (MoPD), NGOs, Private Sector, Research and Development Institutes, ENERCON, NUST, Pakistan Council of Research in Appropriate Technology, HDIP |
National, Local |
|
|
SP5: Dry-land Management and Water Conservation |
Lead Implementing Agency: Planning & Development Departments in Quetta and Karachi, with coordination functions by Planning Commission through Member (SD’s) office |
||
|
5.1 Early Warning and Disaster Management |
Meteorological Dept,Emergency Relief Cell ( Cabinet Div.),District Administrations, NGOs |
UNHSF, WMO |
National, Provincial, Local |
|
5.2 Sustaining Livelihoods in Dryland
|
Provincial Agricultural, Livestock, Forests and Irrigation Depts, Agency for Barani Area Development, Sind Arid Zone Dev. Authority, District Councils, Local Communities, AZRI, WAPDA,Cholistan Res. Inst., NGOs |
EC, ICARDA and FAO for Agric Production Systems and UNDESA for Groundwater Management
|
Provincial, District, Local |
|
SP 6: Grassroots Initiatives |
Lead Implementing Agency: Office of DG (MoE), NGOs, CBOs and Local Governments |
||
|
6.1 Environment & NR Management |
NGOs, CBOs, Forestry Departments, AKRSP, PRSPs |
Local |
|
|
6.2 Low Cost Tech. For Solid and Liquid Waste Management |
NGOs, CBOs and Municipal Authorities |
Local |
|
|
6.3 Promotion of Renewable Energy Technologies |
CBOs, Research Institutes, Private Sector |
Local |
|
|
6.4 Development of Green Enterprises |
CBOs, Private Sector |
Local |
|
Note: More agencies can be added to the above list as programme implementation progresses.
8.9. Coordination with Other Programmes and Projects
There are a number of notable projects/programmes, which are either on-going or planned to be implemented, with which this PD will have to establish effective coordination mechanisms. Most important among these are the: (a) area based programmes in natural resource management; (b) poverty alleviation programme; (c) social action programme; and (d) national drainage programme. If viewed in a broader national development framework, the ultimate goal of these programmes/projects and the programme proposed in this document is the same - poverty alleviation. This alone provides sufficient justification and rationale to establish strong interface between these programmes/projects and the NEAP-SP.
8.10. Arrangements and Preparation of Work Plans
The proposed programme will be implemented in three phases (Section 8.6). The first phase of one year, inter-alia, will focus on elaborating the technical interventions, putting the required institutional framework in place, recruitment of staff, and preparation of detailed budgets and work plans for each of the sub-programme. In addition to the resource mobilization efforts, work will be initiated for components, which are of utmost national importance. As mentioned in Section 8.5, the projects and programme components for which required funding is available will receive priority in terms of implementation. Accordingly, the work plan presented in Annex VI describes the activities to be undertaken during the first phase.
8.11. Technical Backstopping
As repeatedly emphasized in this document, the proposed programme will be implemented utilizing the national expertise and resources to the maximum possible extent. However, complexity of the proposed programme stemming from its multi-sectoral context underscores the need for providing the most qualified technical advice and backstopping. Moreover, it is important to learn from the global experience with respect to different technical and institutional aspects as they relate to the interventions proposed under various sub-programmes. For this purpose, services of UN specialized agencies and other inter-governmental organizations and NGOs will be utilized. This assistance can to some extent be foreseen under the SPPD/STS modality of UNDP (Support for Policy and Programme Development & Support for Technical Services). Once this Programme is approved, UNDP will call upon the relevant specialized UN agencies to propose their technical services to relevant Programme components. UN specialized agencies and other organizations that could become part of this process are identified in Section 8.8 (Table 1).
9.0. MONITORING AND EVALUATION
At the initiation of the programme, performance indicators and plan for other monitoring tools, such as interviews, questionnaires and case studies will be reviewed/refined through a series of participatory, stakeholders’ analysis workshops. Information gathering approaches/methods will be designed and responsibilities for collection, analysis and management of monitoring information will be shared amongst stakeholders and programme staff. Overall benchmark statistics of Pakistan are available in the poverty Reduction Stretegy, the NEAP, the UNDP Human Development Report series and other documents of GoP, and UN (UN Resident Coordinator’s reports, reports by UNICEF and UNFPA). The baseline data and benchmark statistics will serve as inputs to future evaluations.
The ultimate responsibility for monitoring of the proposed programme lies with the Government as part of its fundamental responsibility to execute its own programme. The monitoring system will respond to the specificity of each sub-programme, its components and the outputs to be produced. Detailed performance indicators and benchmarks will be defined during phase 1 for monitoring the programme performance. The monitoring functions will be assured through the PMIU. In addition, the PIC and SPIC will meet on quarterly basis to discuss and review the status of programme implementation. At a higher level, the PSC will meet twice a year to review if the programme implementation is moving ahead smoothly accordingly to the plan of work. To the extent possible, MoELGRD, EAD, UNDP and other development partners will carry out joint field visits.
A Management Information System (MIS) will be implemented based on the reporting system which will ensure a smooth flow of information relating to the implementation of various activities to managers at different levels of the hierarchy. The MIS will also include a feedback mechanism so as to ensure that top managers utilize the information supplied to them. In this context, the chain of information related to performance of participating agents will flow on quarterly basis in the form of progress reports. The process of preparing the progress report will be initiated by each PIU which will be submitted to its respective hierarchy and to PMIU and UNDP. The PMIU will be responsible for collaborating with the PIUs in initiating the process for preparation of quarterly progress reports. The PMIU will then compile the progress reports into an Annual Programme Report (APR). This report will describe the achievement of benchmarks on the time scale, and specify the actions required by the concerned parties in order to achieve the next set of targets and, if necessary, will make substantive recommendations about the orientation of the programme.
The proposed programme will be reviewed and evaluated at least at three different levels. The first level of review and evaluation process calls for continuous monitoring of the performance indicators for various outputs planned under different programme components (Table 2). These indicators suggest the target dates for the tasks to be completed during the first phase. As mentioned earlier, more comprehensive indicators/benchmarks will be developed for all programme components during the first phase--when the interventions have been adequately elaborated and mobilization of required resources is sufficiently secured. The quarterly meetings of the SPIC and PIC provides necessary forum for this review. The PMIU will facilitate in carrying out this level of review and evaluation.
Table 2: Monitoring Indicators for the First Phase
|
Description of Performance Indicators/Benchmarks |
Target Dates: from the Starting Date |
|
Within 3 months Within 6 months Within 7 months
Within 4 months Within 7 months Within 6 months
Within 4 months Within 6 months Within 12 months |
The second level of review calls for more intensive evaluation of the programme on an annual basis in the form of Tripartite Review (TPR). However, additional TPRs could be called, if considered necessary by GoP, UNDP or executing agency. Representatives of the Government, UNDP/donors, executing agency, implementing agencies, and cooperating agencies will participate in this meeting. This meeting will take place at the end of each programme year, to allow time for the revision of work plans, and the incorporation of agreed changes into the budget for the coming financial year. This review process will take place according to the UNDP policies and procedures described for this purpose. Towards this aim, the PMIU will prepare the APR using the UNDP format with the involvement of all stakeholders. The report will reflect the results achieved so far and the problems encountered in the programme execution. In addition, the effectiveness of the management and coordination mechanisms will be reviewed. Additional reports may be required during the programme implementation phase, particularly with regard to specific programme outputs and capacity building targets. The PMIU will prepare such reports in collaboration with respective PIUs as and when required.
The third level of review suggests for an independent mid-term evaluation of the programme (during the middle of the third year). This review will evaluate the performance of all the implementing agencies and stakeholders in delivering the planned outputs. Terms of Reference for this evaluation will be prepared, and external consultants will be hired to represent UNDP and other cost-sharing partners, and national consultants to represent the national implementing agencies. Also, the participation of selected beneficiaries of the programme will be encouraged.
A Programme terminal report will be prepared for consideration of the Terminal Review meeting. The report shall be prepared in draft sufficiently in advance to allow review prior to the Terminal Review meeting. The NPD/NPM will be responsible for the preparation of the terminal report of the programme according to the guidelines given, and for completing all the formal procedures required for formal closing of the programme, including the disposal of equipment. The Programme shall also be subjected to a terminal evaluation during the last quarter of implementation. The organization, TOR and precise timing of the evaluation will be determined by the PSC.
10.0. FINANCIAL MANAGEMENT
A number of donors’ supported interventions are planned under the programme. Technical scopes of these interventions have sufficiently been elaborated in the previous sections. This section describes the financial aspects of the proposed programme.
10.1 Total Programme Costs/Budget
Total financial size of the proposed programme is $42.78 Million, which includes $ 1.7 million for PAF being implemented independently with overall linkages to the sub-programmes under this propgramme. The funding of the programme will play a catalytic role in the successful execution of the initiatives undertaken through NEAP-SP. The programme has a broad scope enfolding different sub projects hence the money available would be used to mobilize the resources in the most efficient manner.Table 3 shows indicative figures by sub-programme and their respective components. The estimates shown against different budget lines will be refined and updated during the first phase of the programme. The funds to be channeled through this programme are going to be $ 41.1 million. Share of the ecosystem management sub-programme in the total costs/budget will be around 34%, followed by pollution control (26%), energy conservation and renewables (13%), policy coordination and environmental governance (9%), drylands management and water conservation (10%), grassroots initiatives (5%) and institutional support costs (3%). Alternatively stated, share of the MoELGRD in total programme budget will be around 87%, and planning commission/provincial P&Ds in Sindh and Balochistan (10%). Institutional support costs required to make the PMIU and PIUs functional will cost around 3% of the total programme costs/budget.
The proposed programme will be funded using two types of financing modalities: (a) cost-sharing; and (b) parallel financing. First type of modality is the standard norm for UNDP led projects/ programmes under which potential donors/funding agencies channel their resources through UNDP. The second modality refers to the funds available under those projects which maintain their independent status/identity but their activities closely fall within the technical domain of the proposed programme. In other words, funds available under these projects are not channeled through the proposed programme--but definitely utilized to support and complement the activities planned under the programme.
10.2.1 Funds Available Under Cost-Sharing
At the time of preparing the programme document, an amount of $13.03 Million has already or likely to become available under the cost-sharing modality. Out of this $2.0 Million is contribution of UNDP and the rest is likely to become available from other bilateral donors who have expressed their interest to participate in the proposed programme on cost sharing basis. For example, discussions are underway with the GEF and EU to finalize projects dealing with Sustainable Development of Chilghoza Forest Ecosystems, Conservation of Species and Habitats, Conservation of Juniper Forests, and Protected Areas Management and with bilaterals for introducing cleaner production processes in refinery and textile sectors.
Table 3: Total Programme Costs/Budget (Indicative Figures in 000$)
|
Reference No. |
Sub-Programme/Components |
International Consultants (ST) |
National Experts (LT) |
National Consultants (ST) |
Administrative Support Personnel & Field Technicians |
Mission Costs/Technical Backstopping |
Duty Travel |
Sub-Contracts (tech studies, field surveys, public awareness) |
Training /HRD (fellowships, study tours, workshops) |
Equipment |
Miscellaneous |
C.O Support Costs*. |
Total Costs |
|||
|
1 |
Policy Coordination and Env. Governance |
136.0 |
144.00 |
88.0 |
2.5 |
34.5 |
103.5 |
2,206.0 |
517.5 |
345.0 |
17.3 |
103.5 |
3,697.80 |
|||
|
1.1 |
Policy Planning and Coordination |
68.0 |
72.0 |
17.6 |
1.0 |
15.0 |
45.0 |
968.0 |
225.0 |
150.0 |
7.5 |
45.0 |
1,614.1 |
|||
|
1.2 |
Environmental Information Management System |
34.0 |
72.0 |
35.2 |
1.0 |
13.0 |
39.0 |
814.0 |
195.0 |
130.0 |
6.5 |
39.0 |
1,378.7 |
|||
|
1.3 |
Environment Education and Awareness |
34.0 |
0.0 |
35.2 |
0.5 |
6.5 |
19.5 |
424.0 |
97.5 |
65.0 |
3.3 |
19.5 |
705.0 |
|||
|
2 |
Pollution Control |
204.0 |
356.0 |
114.4 |
7.0 |
110.0 |
330.0 |
6,161.4 |
1,650.0 |
1,100.0 |
55.0 |
330.0 |
10,417.8 |
|||
|
2.1 |
Industrial Pollution |
68.0 |
72.0 |
35.2 |
2.0 |
75.0 |
225.0 |
4,234.0 |
1,125.0 |
750.0 |
37.5 |
225.0 |
6,848.70 |
|||
|
2.2 |
Vehicular Pollution |
- |
- |
- |
43.40 |
- |
- |
- |
- |
43.40 |
||||||
|
2.3 |
Urban Management |
34.0 |
68.0 |
26.4 |
2.0 |
10.0 |
30.0 |
350.0 |
150.0 |
100.0 |
5.0 |
30.0 |
805.40 |
|||
|
2.4 |
Water Quality Protection |
102.0 |
144.0 |
26.4 |
2.0 |
20.0 |
60.0 |
1,200.0 |
300.0 |
200.0 |
10.0 |
60.0 |
2,124.4 |
|||
|
2.5 |
Indoor Air Pollution |
0.0 |
72.0 |
26.4 |
1.0 |
5.0 |
15.0 |
334.0 |
75.0 |
50.0 |
2.5 |
15.0 |
595.9 |
|||
|
3 |
Ecosystems Mgmt. And N.R Conservation |
238.0 |
428.0 |
158.4 |
5.0 |
180.0 |
701.0 |
8,380.0 |
1,775.0 |
1,400.0 |
123.5 |
577.0 |
13,965.9 |
|||
|
3.1 |
Uplands Ecosystems Management |
34.0 |
72.0 |
35.2 |
1.0 |
75.0 |
441.0 |
2,500.0 |
500.0 |
500.0 |
73.5 |
299.0 |
4,530.70 |
|||
|
3.2 |
Marine/Coastal Ecosystems Mgmt. |
34.0 |
72.0 |
17.6 |
1.0 |
10.0 |
30.0 |
600.0 |
150.0 |
100.0 |
5.0 |
30.0 |
1,049.6 |
|||
|
3.3 |
Irrigated Ecosystems Management |
68.0 |
68.0 |
52.8 |
1.0 |
25.0 |
80.0 |
1,000.0 |
150.0 |
200.0 |
10.0 |
73.0 |
1,727.80 |
|||
|
3.4 |
Wetlands Management |
68.0 |
144.0 |
26.4 |
1.0 |
45.0 |
75.0 |
2,780.0 |
600.0 |
350.0 |
22.5 |
100.0 |
4,211.90 |
|||
|
3.5 |
Protected Areas Management |
34.0 |
72.0 |
26.4 |
1.0 |
25.0 |
75.0 |
1,500.0 |
375.0 |
250.0 |
12.5 |
75.0 |
2,445.9 |
|||
|
4 |
Energy Conservation and Generation |
102.0 |
7112.0 |
52.8 |
15.0 |
60.0 |
200.0 |
3,314.0 |
900.0 |
450.0 |
30.0 |
190.0 |
5,425.8 |
|||
|
4.1 |
Energy Conservation |
68.0 |
56.0 |
35.2 |
9.0 |
10.0 |
150.0 |
2,000.0 |
700.0 |
200.0 |
25.0 |
100.0 |
3,353.20 |
|||
|
4.2 |
Renewable Energy |
34.0 |
56.0 |
17.6 |
6.0 |
50.0 |
50.0 |
1,314.0 |
200.0 |
250.0 |
5.0 |
90.0 |
2,072.60 |
|||
|
5 |
Drylands Management and Water Cons. |
170.0 |
216.0 |
70.4 |
3.6 |
40.0 |
120.0 |
2,400.0 |
600.0 |
400.0 |
20.0 |
120.0 |
4,160.0 |
|||
|
5.1 |
Early Warning and Disaster Mgmt. |
68.0 |
72.0 |
35.2 |
2.0 |
15.0 |
45.0 |
900.0 |
225.0 |
150.0 |
7.5 |
45.0 |
1,564.7 |
|||
|
5.2 |
Sustaining Livelihoods in Drylands |
102.0 |
144.0 |
35.2 |
1.6 |
25.0 |
75.0 |
1,500.0 |
375.0 |
250.0 |
12.5 |
75.0 |
2,595.3 |
|||
|
6 |
Grassroots Initiatives |
0.0 |
0.0 |
0.0 |
0.0 |
20.0 |
60.0 |
1,850.0 |
0.0 |
0.0 |
10.0 |
60.0 |
2,000.0 |
|||
|
6.1 |
Environment and NR Management |
0.0 |
0.0 |
0.0 |
0.0 |
5.0 |
15.0 |
462.5 |
0.0 |
0.0 |
2.5 |
15.0 |
500.0 |
|||
|
6.2 |
Low Cost Tech. for Waste Management |
0.0 |
0.0 |
0.0 |
0.0 |
5.0 |
15.0 |
462.5 |
0.0 |
0.0 |
2.5 |
15.0 |
500.0 |
|||
|
6.3 |
Promotion of Ren. Energy Technologies |
0.0 |
0.0 |
0.0 |
0.0 |
5.0 |
15.0 |
462.5 |
0.0 |
0.0 |
2.5 |
15.0 |
500.0 |
|||
|
6.4 |
Development of Green Enterprises |
0.0 |
0.0 |
0.0 |
0.0 |
5.0 |
15.0 |
462.5 |
0.0 |
0.0 |
2.5 |
15.0 |
500.0 |
|||
|
Institutional Support Costs |
0.0 |
510.0 |
0.0 |
456.0 |
0.0 |
0.0 |
0.0 |
0.0 |
300.0 |
44.0 |
0.0 |
1,412.0 |
||||
|
PMIU and PIUs(see notes 1&2) |
102.0 |
510.0 |
0.0 |
456.0 |
0.0 |
0.0 |
0.0 |
0.0 |
300.0 |
44.0 |
0.0 |
1,412.0 |
||||
|
PAF |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
1,700 |
||||
|
Total programme Costs |
952.0 |
1,710.00 |
484.00 |
489.10 |
444.50 |
1,494.50 |
24,205.4 |
5,544.50 |
4,145.00 |
299.80 |
1,310.50 |
42,779.3 |
||||
|
Cost Composition (%) |
2.3 |
4.3 |
1.2 |
1.2 |
1.1 |
3.8 |
59.3 |
13.3 |
9.8 |
0.7 |
3.0 |
100.00 |
||||
*. As per agreement with UNDP (July 2001), Government of Pakistan has agreed to a 3.0% support cost from projects/programmes under
NEX modality to bear the cost of UNDP Country Office support activities. The total support cost will not exceed 3.0% of actual programme
delivery.
The GoP contribution is also expected to become available through the: (a) cash contribution, if available; (b) in-kind contributions from the implementing agencies--mainly from regular non-development budgetary sources; and (c) concessions provided to the private sector on import duties for the procurement of environmental friendly equipment.
10.2.2 Funds Available Under Parallel Financing
In addition to the funds available from the above projects, there are strong indications that partner donor agencies will also come up with new projects to support the implementation of national agenda outlined to address the issues with respect to poverty-environment nexus. In cases, where these agencies tend to follow their own administrative procedures to manage their respective technical assistance programmes, cost-sharing (as defined in the present context) is usually not viewed by them as the most preferred modality for channeling their assistance. Nevertheless, resources provided by these agencies could be considered as part of the parallel financing--as long as the activities planned under their projects relate to the overall scope of the programme. Similarly, funds allocated for PAF, which has strong linkage with the programme, are also considered to be under parallel financing.
10.3 Earmarking of Donors Resources by Sub-Programmes
Financial earmarking for donors’ resources is presented in Table 4. Total programme costs amount to $US 42.78 Million in five years (2001-2005). At the time of preparing the document, funds that are available or are in advance stages of mobilisation under the cost-sharing modality amount to $13.03 Million. Similarly, under the parallel financing modality $1.70 Million is also committed towards the programme. In other words, about 34% of the required resources could be considered to have become available. The balance of $28.05 Million is yet to be mobilized. Much of these remaining resources are expected to come from the bilateral donors, GoP and private sector (under the cost-sharing modality), and the World Bank and AsDB (under the parallel financing modality). The total and balance resources available for the programme are summarised in Table 5.
Table 4: Earmarking of Resources by Donors/Sub-Programmes
|
Sub-Programme/Components |
UNDP |
UNHSF |
CAP21 |
GEF |
Bilateral 2 |
UN Foundation |
Bilateral 1 |
Bilateral 3 |
Montreal Protocol |
World Bank |
ADB |
Private Sector |
GOP |
Total |
||
|
1 |
Policy Coordination & Env. Governance |
0.200 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.200 |
|
|
1.1 |
Policy Planning and Coordination |
0.100 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.100 |
|
|
1.2 |
Environmental Information Management System (NI) |
0.100 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.100 |
|
|
1.3 |
Environmental Education and Awareness |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
2 |
Pollution Control |
0.600 |
--- |
--- |
--- |
--- |
--- |
2.000 |
2.000 |
0.170 |
--- |
--- |
1.000 |
--- |
5.77 |
|
|
2.1 |
Industrial Pollution |
0.400 |
--- |
--- |
--- |
--- |
--- |
2.000 |
2.000 |
0.170 |
--- |
--- |
1.000 |
--- |
5.570 |
|
|
0.200 |
--- |
--- |
--- |
--- |
--- |
2.000 |
--- |
--- |
--- |
--- |
1.000 |
--- |
3.200 |
||
|
0.200 |
--- |
--- |
--- |
--- |
--- |
--- |
2.000 |
0.170 |
--- |
--- |
--- |
--- |
2.370 |
||
|
2.2 |
Vehicular Pollution |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
2.3 |
Urban Management |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
2.4 |
Water Quality Protection |
0.200 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.200 |
|
|
2.5 |
Indoor Air Pollution |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
3 |
Ecosystems Mgmt. & N.R Conservation |
0.55 |
--- |
--- |
4.000 |
0.750 |
0.200 |
--- |
--- |
--- |
--- |
--- |
0.060 |
--- |
5.560 |
|
|
3.1 |
Uplands Ecosystems Management |
0.25 |
--- |
--- |
3.000 |
0.600 |
0.200 |
--- |
--- |
--- |
--- |
--- |
0.060 |
--- |
4.110 |
|
|
--- |
--- |
--- |
1.000 |
0.600 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
1.600 |
||
|
--- |
--- |
--- |
1.000 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
1.000 |
||
|
0.250 |
--- |
--- |
1.000 |
--- |
0.200 |
--- |
--- |
--- |
--- |
--- |
0.060 |
--- |
1.510 |
||
|
3.2 |
Marine/Coastal Ecosystems Mgmt |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
3.3 |
Irrigated Ecosystems Management |
0.150 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.150 |
|
|
0.150 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.150 |
||
|
3.4 |
Wetlands Management |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
3.5 |
Protected Areas Management |
0.150 |
--- |
--- |
1.000 |
0.150 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
1.300 |
|
|
4 |
Energy Conservation and Renewables |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
4.1 |
Energy Conservation |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
4.2 |
Renewable Energy |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
5 |
Drylands Management |
0.100 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.100 |
|
|
5.1 |
Early Warning and Disaster Mgmt. |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
5.2 |
Sustaining Livelihoods in Drylands |
0.100 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.100 |
|
|
6 |
Grassroots Initiatives |
--- |
--- |
--- |
0.450 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.450 |
|
|
6.1 |
Environment and NR Management |
--- |
--- |
--- |
0.150 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.150 |
|
|
6.2 |
Low Cost Tech. for Waste Management |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
|
|
6.3 |
Promotion of Renewable Energy Tech. |
--- |
--- |
--- |
0.150 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.150 |
|
|
6.4 |
Development of Green Enterprises |
--- |
--- |
--- |
0.150 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.150 |
|
|
Institutional Support Costs |
0.950 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.950 |
||
|
PMIU & PIUs |
0.950 |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
0.950 |
||
|
Total |
2.400 |
--- |
--- |
4.450 |
0.750 |
0.200 |
2.000 |
2.000 |
0.170 |
--- |
--- |
1.060 |
--- |
13.030 |
||
|
Cost Sharing (available) |
2.400 |
--- |
--- |
4.450 |
--- |
0.200 |
--- |
--- |
0.170 |
--- |
--- |
1.060 |
--- |
8.280 |
||
|
Cost Sharing (adv. Stages of mobilisation) Parallel Financing (PAF) |
--- 0.95 |
--- 0.500 |
--- 0.250 |
--- --- |
0.750 --- |
--- --- |
2.000 --- |
2.000 --- |
--- --- |
--- --- |
--- --- |
--- --- |
--- --- |
4.750 1.700 |
||
Table 5: Available Resources/Sources of Funds (US $ Million)
|
A: Cost-Sharing (available) |
|
|
2.00 |
|
Sub-total (A) |
2.00 |
|
B: Cost-Sharing (advance stages of mobilisation) |
|
|
2.00 |
|
0.75 |
|
2.00 |
|
6.28 |
|
Sub-total (B) |
11.03 |
|
C: Parallel Financing |
|
|
--- |
|
--- |
|
1.700 |
|
Sub-total (C): |
1.700 |
|
Total Resources Available (A+B+C) |
14.73 |
|
Resource Gap |
28.05 |
|
Total Programme Funds |
42.78 |
10.4 Resource Mobilization Strategy
As mentioned in the preceding section, about 66% of the total required resources ($28.05 Million) are yet to be mobilized. In order to move ahead with the programme implementation in its entirety, it is important that these resources become available as early as possible, preferably during the first phase of the programme implementation. This would require concerted efforts on the part of the Government of Pakistan. The role of UNDP will be equally important, as it will assist the Government in mobilizing the required resources from partner donors. Main features of the proposed resource mobilization strategy are outlined below.
The proposed programme can absorb government contributions on cost-sharing basis depending on the resource availability. This contribution is viewed very essential by all partners as it would serve two inter-linked purposes. First, it will demonstrate Government’s commitment to the environmental agenda. Second, Government’s commitment will pave the basis to raise additional resources. The GoP will have to explore alternative means to raise its cost sharing contributions. Such resources may come from the GoP’s Poverty Alleviation Fund because main emphasis of the proposed programme is also on poverty alleviation through improved environment and natural resources management. The Revolving Loan Funds to be established under the GEF funded major projects may also be tapped for advancing the agenda of environmental management. Recently announced establishment of Environment Fund provides another window to secure necessary Government contributions. For this purpose, the PMIU will seek maximum possible assistance from the Programme Steering Committee (PSC). The Government may also consider making part of the required contributions available in the form of import duty concessions for the procurement of environment-friendly equipment by the private sector. This option may yield two distinct advantages. However, all the funding of the programme will be exclusively through grants.
10.5 Technical Support Services
The proposed programme will be implemented utilizing the national expertise and resources to the maximum possible extent. However, it is equally important to benefit from the global experience with respect to different technical and institutional aspects as they relate to the interventions proposed under various sub-programmes. This could possibly be achieved by involving the UN specialized agencies and similar international organizations and NGOs in the implementation of the programme.
10.6 Mechanisms for Financial Accounting and Reporting
10.6.1 UNDP Country Office
The Country Office (CO) is accountable to the UNDP Administrator for all the resources provided to the GoP through this programme. As such, the CO will be responsible for monitoring the programme/project interventions to ensure proper use of funds. Specific services will be provided to the programme at the request of the National Programme Director, based on the requirements of the Sub-programme Directors, which include:
10.6.2 Financial Accountability
The PMIU shall be responsible for ensuring that the resources allocated to the programme are utilized effectively in financing the envisaged activities. PIUs will maintain records and controls for the purpose of ensuring the accuracy and reliability of the programme/project’s financial information and provide information to the PMIU in the form of progress and financial reports. The accounting systems in place shall ensure that the receipts and disbursements of available funds are properly recorded and that such disbursements are within the approved budgets. Tight controls in budget management would need to be ensured at all times, to exercise compliance with UNDP’s Financial Management System (FIM). UNDP would provide the necessary software along with training to the PMIU and PIUs, Finance and Accounts staff, to facilitate their task of accounting and financial management.
10.6.3 Advance of Funds
The UNDP CO shall disburse funds on the basis of quarterly financial reports/ work plans, to the Executing/Implementing Agencies. All quarterly advance requests supported by quarterly work plans must be submitted to UNDP through National Programme Director (NPD). The NPD will in turn delegate the authority to SPDs for undertaking disbursements during the quarter as per UNDP PCOM procedures. These would, however, need to remain within the quarterly advance requested, with due consideration being given to budget availability per budget line. Implementing agencies which are outside the Government’s system (e.g. NGOs and Private Sector Institutions) shall request for advance directly from UNDP in accordance with the terms and conditions set-forth in the Memorandum of Understanding and/or Project Cooperation Agreement that shall be prepared and signed between them and the UNDP in this respect.
10.6.4 Direct Payments
In cases where hard currency payments are to be made, the implementing Agency may request UNDP, through the Executing Agency, for processing such payments. When UNDP is asked to make a payment on behalf of the Executing Agent, the request must be forwarded to UNDP CO via a standard letter "Request for Direct Payment" duly completed and signed by the National Programme Director, in line with PCOM requirements.
10.6.5 Audit Requirements
The UNDP auditors will audit all project operations as and when required, at least once in a year. It is the responsibility of the Executing/Implementing Agency to cooperate with the auditors in terms of providing the requested information, as well as to ensure that all audit observations are attended to adequately.
10.6.6 Procurement of Goods and Services
The UNDP's established rules and procedures as provided in the PCOM guidelines would be used for procurement of goods and services. The Executing Agency shall be responsible for maintaining an up-to-date stores/inventory record of the acquisition and disposition of property and equipment procured under the programme/project.
10.6.7 Allocation of Resources
Total programme budget by sub-programme and components is provided in Section 10.1. This budget will be further refined and prepared according to the standard UNDP budgeting format during the first phase once the proposed interventions have been elaborated in more detail. However, as UNDP has already allocated an amount of $2 million to initiate the programme implementation, a detailed budget for this amount using standard UNDP format has been prepared and included in Table 6. The Executing/Implementing Agencies may utilize this amount in accordance with the amount allocated against different budget lines and for different programme components as per rules and regulations outlined in this Section.
10.6.8 Programme Implementation Agreements
The agreements to be signed under this programme may include the following.
Table 6: Programme Budget Showing UNDP Contributions (US$)
|
BL |
Description |
Exec. |
Costs/ |
Total |
2001 |
2002 |
2003-2005 |
|
Agent |
W/M |
||||||
|
11 |
International Consultants |
|
|||||
|
11.51 |
Industrial Pollution Control |
UN |
Net Amount |
34,000 |
17000 |
17,000 |
|
|
W/M |
2.00 |
1.00 |
1.00 |
||||
|
11.52 |
Water Quality Protection |
UN |
Net Amount |
17,000 |
8,500 |
8,500 |
|
|
W/M |
1.00 |
0.5 |
0.5 |
||||
|
11.53 |
Drought Management |
UN |
Net Amount |
34,000 |
17,000 |
17,000 |
|
|
W/M |
2.00 |
1.00 |
1.00 |
||||
|
11.54 |
Environmental Policy and Accounting |
UN |
Net Amount |
34,000 |
17,000 |
17,000 |
|
|
W/M |
2.00 |
1.00 |
1.00 |
||||
|
11.55 |
Evaluation Missions |
UN |
Net Amount |
34,000 |
34,000 |
||
|
W/M |
00 |
00 |
|||||
|
11.99 |
Sub-total: |
Net Amount |
153,000 |
59,500 |
93,500 |
||
|
|
|
W/M |
7.00 |
3.5 |
3.5 |
||
|
13 |
Administrative Support Staff |
||||||
|
PMIU + PIUs |
|||||||
|
13.01 |
Admin Assistant |
NEX |
Net Amount |
18,000 |
1,500 |
6,000 |
10,500 |
|
13.02-- |
Accounts Assistants |
NEX |
Net Amount |
138,000 |
1,000 |
37,000 |
100,000 |
|
13.12 |
|||||||
|
13.13-- |
Secretaries |
NEX |
Net Amount |
81,600 |
600 |
20,000 |
61,000 |
|
13.20 |
|||||||
|
13.21-- |
Drivers |
NEX |
Net Amount |
62,400 |
400 |
15,000 |
47,000 |
|
13.32 |
|||||||
|
13.33 |
Social Security |
NEX |
|||||
|
13.99 |
Sub-total: |
300,000 |
3,500 |
78,000 |
218,500 |
||
|
15 |
Monitoring & Evaluation |
||||||
|
15.01 |
In-country travel |
NEX |
Net Amount |
55,000 |
1,000 |
15,000 |
39,000 |
|
15.99 |
Sub-total: |
55,000 |
1,000 |
15,000 |
39,000 |
||
|
17 |
National Professionals |
||||||
|
17.01 |
National Programme Manager |
NEX |
Net Amount |
96,000 |
6,000 |
24,000 |
66,000 |
|
W/M |
48 |
3 |
12 |
33 |
|||
|
17.02 |
Asst National Programme Manager |
Net Amount |
30,000 |
15,000 |
15,000 |
||
|
W/M |
24 |
12 |
12 |
||||
|
17.03 |
Sub –Programme Manager (SP1) |
NEX |
Net Amount |
30,000 |
15,000 |
15,000 |
|
|
W/M |
24 |
12 |
12 |
||||
|
17.04 |
Sub –Programme Manager (SP2) |
NEX |
Net Amount |
30,000 |
15,000 |
15,000 |
|
|
W/M |
24 |
12 |
12 |
||||
|
17.05 |
Sub –Programme Manager (SP3) |
NEX |
Net Amount |
30,000 |
15,000 |
15,000 |
|
|
W/M |
24 |
12 |
12 |
||||
|
17.06 |
Sub-Programme Manager (SP4) |
NEX |
Net Amount |
30,000 |
15,000 |
15,000 |
|
|
W/M |
24 |
12 |
12 |
||||
|
17.07-- |
Sub-Programme Managers (SP5) |
NEX |
Net Amount |
60,000 |
30,000 |
30,000 |
|
|
08 |
W/M |
48 |
24 |
24 |
|||
|
17.09 |
Sub-Programme Manager (SP6) |
NEX |
Net Amount |
30,000 |
15,000 |
15,000 |
|
|
W/M |
24 |
12 |
12 |
||||
|
17.10-- |
Four Provincial/Regional Coordinators |
NEX |
Net Amount |
120,000 |
30,000 |
90,000 |
|
|
17.13 |
W/M |
96 |
24 |
72 |
|||
|
17.14 |
National Consultants (short-term) |
NEX |
Net Amount |
76,000 |
25,000 |
51,000 |
|
|
17.15 |
Social Security |
NEX |
|||||
|
17.99 |
Sub-total |
Net Amount |
532,000 |
6,000 |
199,000 |
327,000 |
|
Table 6: Programme Budget Showing UNDP Contributions (US$)
|
BL |
Description |
Exec. |
Costs/ |
Total |
2001 |
2002 |
2003-2005 |
|
Agent |
W/M |
||||||
|
19 |
Component Total: |
Costs |
1,040,000 |
10,500 |
351,500 |
678,000 |
|
|
|
|
||||||
|
20 |
Subcontracts (see note 2) |
|
|||||
|
21.01 |
Pollution Control Studies |
NEX |
Net Amount |
60,000 |
25,000 |
35,000 |
|
|
21.02 |
Drought Management Studies |
NEX |
Net Amount |
40,000 |
20,000 |
20,000 |
|
|
21.03 |
Participatory Management Techniques |
NEX |
Net Amount |
60,000 |
25,000 |
35,000 |
|
|
21.04 |
Environmental Policy Studies |
NEX |
Net Amount |
20,000 |
10,000 |
10,000 |
|
|
21.05 |
Public Awareness |
NEX |
Net Amount |
50,000 |
15,000 |
35,000 |
|
|
21.06 |
Other Miscellaneous |
NEX |
Net Amount |
15,000 |
5,000 |
10,000 |
|
|
21.07 |
Premises (Provinces) |
NEX |
Net Amount |
70,000 |
30,000 |
40,000 |
|
|
29 |
Component Total: |
315,000 |
130,000 |
185,000 |
|||
|
30 |
Training |
||||||
|
31.01 |
Short-term Fellowships |
UN |
Net Amount |
70,000 |
20,000 |
50,000 |
|
|
32.01 |
Group Study Tours |
UN |
Net Amount |
100,000 |
40,000 |
60,000 |
|
|
32.02 |
In-Country Training |
NEX |
Net Amount |
90,000 |
40,000 |
50,000 |
|
|
32.03 |
Workshops/Seminars |
NEX |
Net Amount |
27,000 |
15,000 |
12,000 |
|
|
39 |
Component Total: |
287,000 |
115,000 |
172,000 |
|||
|
40 |
Equipment (PMIU, PIU1) |
||||||
|
45.10 |
Expendable Equipment |
NEX |
Net Amount |
18,000 |
4,000 |
4,000 |
10,000 |
|
45.11 |
Non-expendable Equipment (office .equipment) |
NEX |
Net Amount |
30,000 |
3,000 |
17,000 |
10,000 |
|
45.12 |
Audio-visual Equipment (PMIU) |
NEX |
Net Amount |
15,000 |
2,000 |
13,000 |
|
|
45.13 |
Field Vehicles |
NEX |
Net Amount |
154,000 |
154,000 |
||
|
45.14 |
Computing/GIS Equipment |
NEX |
Net Amount |
85,600 |
50,000 |
35,600 |
|
|
45.15 |
Operation & Maintenance |
NEX |
Net Amount |
25,000 |
2,000 |
8,000 |
15,000 |
|
49 |
Component Total: |
327,600 |
11,000 |
246,000 |
70,600 |
||
|
50 |
Miscellaneous |
||||||
|
52.01 |
Reporting Costs |
NEX |
Net Amount |
12,500 |
1,000 |
5,000 |
6,500 |
|
53.01 |
Sundries |
NEX |
Net Amount |
17,900 |
5,000 |
5,000 |
7,900 |
|
53.02 |
CO Implementation Support Cost |
NEX |
|||||
|
59 |
Component Total: |
30,400 |
6,000 |
10,000 |
14,400 |
||
|
99 |
Total Project Costs: |
Net Amount |
2,000,000 |
27,500 |
852,500 |
1,120,000 |
Note 1: Costs related to the execution of technical studies and field surveys in support of various programme components are reflected under the subcontracting budget line. However, if in-house capacities are to be used for these studies, the amount provided under this budget line will be re-programmed to provide the necessary inputs.
Note 2: BL 53.02 is for 3.0 % CO Support Cost based on actual delivery.
11.0. RISKS AND PRIOR OBLIGATIONS
11.1. Risk Analysis
Given the perceived complexity of this Programme in terms of its comprehensive coverage for securing sufficient basis for sustainable environment management, its proposed institutional arrangements, and execution modality etc., potential risks may be encountered at a number of levels and in a variety of ways. However, these risks should be viewed taking into account the expected benefits of the programme or, alternatively, in terms of consequences of not having the programme. Even moderate success in the implementation of the programme will significantly improve the current state of environment and strengthen the national capacities in natural resources conservation and protection. But this should not be interpreted to mean that the programme should continue if corrective measures are not taken to address the potential risks. The potential risks faced by the programme are discussed below together with their possible corrective measures are presented in Table 7.
In addition to the risk specific corrective measures mentioned in Table 7, a number of additional measures will be taken to further minimize the potential risks. Government cost-sharing will be secured to enhance commitment and national ownership. A competitive recruitment modality will be adapted for national consultants and counterparts to ensure adequacy of profile and competence to the requirements of the post. Moreover, extensive use will be made of national human resources and organizations wherever feasible, instead of international ones, in order to intensify capacity development and enhance sustainability. If required, technical backstopping will be secured from various UN cooperating agencies in their respective areas of expertise through the PMIU to reinforce the implementation capacities of national entities. Finally, monitoring and evaluation will be undertaken, as described in Section 9 above, in order to remove bottlenecks and introduce corrective measures.
Table 7: Potential Risks, Their Likelihood and Possible Corrective Measures
|
Risks |
Likelihood |
Corrective Measures |
|
1. Some of the administrative actions outlined in Section 9.2 below are not fully implemented prior to the start of programme implementation. |
Low to Medium |
If, for one reason or the other, the programme is initiated based on assurances from the Government that required decisions would be taken in due course of time, a MOU providing time table for certain agreed actions may be signed between the relevant parties. |
|
2. Difficulties in implementing & coordinating different programme activities due to delays in the establishment of PMIU and PIUs, and constitution of committees. |
Low |
If these units and committees are not set up within four months of the start of the programme, a multipartite review will be scheduled to decide whether or not the programme should be continued. |
|
3. Lack of commitment of national staff assigned to work with the programme, and of relevant government authorities due to absence of adequate incentive structure. |
Low to Medium |
The programme and implementing agencies should cater some financial resources to provide incentives to the GoP counterpart staff of PIUs. Appropriate subsistence allowance should be paid to the staff as per UNDP procedures while they are on field travel. The PMIU/ PIUs should have the financial autonomy in implementing such decisions. |
|
4. Lack of cooperation among the national implementing agencies in pursuing programme objectives and targets. |
Low |
Utilize the services of PSC and Environment Donors Coordination Group to the maximum possible extent in coordinating sub-sectoral activities. If required, the NPD should ensure enforcement of additional coordination arrangements through the intervention of the office of the Minister of Environment. |
|
5. The programme may not be sustainable after withdrawal of donors’ assistance. |
Low |
The programme will technically be sustainable as MoELGRD and other institutions participating in the implementation of the programme will have acquired all the necessary skills, expertise and equipment required for natural resources conservation and environmental management. Key to the financial sustainability is that the implementing agencies should set aside or allocate enough resources to continue important activities beyond the programme duration. The programme in its last six months should work with the relevant implementing agencies to determine which activities should continue, how much resources will be required, and from where these resources will come. |
|
6. Financial resources may not become available in the amounts required. |
Low to Medium |
Preliminary discussions with various donors have proven to be very promising. Continuous dialogue between the PSC and local donors group will be maintained. The GoP is planning to establish an environment fund, which may also be tapped for the programme. |
11.2. Prior Obligations and Pre-requisites
This Programme provides a flexible response to the institutional building needs of a wide range of national institutions involved in one way or the other in poverty alleviation through the protection of natural resources and environmental management. However, the major part of the Programme will be geared towards strengthening the technical and institutional capacities of Government institutions concerned. It is believed that the Government cannot embark on such an ambitious programme unless necessary elements of the capacity building are put into place. Therefore, conditions for approval of UNDP/donor assistance to the proposed Programme and its completion rests on sufficient evidence that the following actions will be taken.
12.0. LEGAL CONTEXT
The legal context for UNDP-assisted programmes and projects in Pakistan is established by the two major agreements: (i) the Convention on the Privileges and Immunities of the United Nations, given affect by Act XX of 1948 of the Pakistan Constituent Assembly (Legislative) and assented to 16 June, 1948; and (ii) the agreement between the Government of the Islamic Republic of Pakistan and the United Nations Development Programme concerning assistance under the Special Fund Sector of the United Nations Development Programme, signed by the parties on 25th February 1960.
This Programme Document shall be the instrument (therein referred to as a Plan of Operation) envisaged in Article 1, paragraph 2, of the agreement between the Government of the Islamic Republic of Pakistan and the United Nations Development Programme concerning assistance under the Special Fund Sector of the United Nations Development Programme.
The UNDP-assisted programmes and projects for Pakistan are planned and executed in accordance with the global UNDP Financial Rules and Regulations, the Programming Manual and the Project Cycle Operations Manual for Pakistan (PCOM).
ANNEXES
ANNEX I
Environmental Degradation in Pakistan
Land
Pakistan has a total land area of approximately 88.2 million hectares, of which about 20 million hectares is used for agriculture, while some 3 million hectares is forest and rangeland.
The main causes of reduced land productivity are: shortage of irrigation water, wind erosion, salinity and sodicity, waterlogging, flooding and loss of organic matter. These problems often occur simultaneously and produce synergistic impacts on agricultural productivity which is evident in the form of static crop yields for the last one-decade.
The relationship of land degradation and poverty is explicit in the context of Pakistan. There are disparities in land distribution among small and big farmers. Big landholdings have encouraged absentee landlordism and full potential of soils is not utilized, rather the farm workers on such lands, in the absence of owners, waste valuable resources including water. On the other hand, small farmers cannot afford to leave their land fallow as they earn their livelihood from it. Consequently, the soils are suffering from waterlogging / salinity and nutritional mining. Growing of crops on soils deficient in organic matter for years is also resulting in deficiency of vital micronutrients, which leads to lower crop production. Brandon and Hammond (1995) estimate the loss of agricultural production due to land degradation is US $ 300 million. The farmers are aware of these problems but are unable to add supplements into their soils due to lack of financial resources. They are bound to burn crop residues and animal dung as there is scarcity of fuelwood and natural gas and the poor cannot afford high cost of electricity. In fact, the poor performance of the agriculture sector is the principal cause of migration of farm workers to cities.
Water
Surface Water Availability: Of 175 billion cubic meters of water entering Indus Basin annually, 128 billion cubic meters are diverted for irrigation purposes at the canal heads while the remaining water flows to the sea. It is estimated that about 50% water is lost in transit from canals to fields and 25% because of inefficient irrigation techniques.
If the population continues to increase at the current rate and efforts are not made to improve irrigation efficiency and rainwater harvesting then the per capita availability of water will fall below the minimum required threshold of 1,000 cubic meters per capita per annum and Pakistan will fall in the category of desert countries.
Pakistan currently lacks the necessary storage capacity, in part because of heavy silting of reservoirs, which is a result of degradation of watersheds. The country has regularly experienced critical water shortages resulting in power blackouts and also inadequate supplies of irrigation water for the winter crop-growing season. The shortage / mismanagement of irrigation water is one of the main factors preventing the nation from attaining food self-sufficiency.
Groundwater Mining: Beyond the Indus Basin, sharp drops in water-table of underground aquifers- 15 centimeters to over 60 cm per annum- are occurring in a number of areas. In the Pishin-Lora river basin, the average abstraction of water is 52 cubic ft / second whereas the recharge rate is 35% less than the abstraction rate, meaning that the groundwater reserves are being depleted. Consequently, many wells have dried up in the basin and orchards are under a serious drought stress, which alters the physiology of plants. The stressed trees are heavily attacked by insects and diseases which subsequently result in low productivity. The decline in vegetation cover has already resulted in degradation of watersheds.
In Balochistan, less than normal rainfall, for the last 3 consecutive years, in most of the upland of the province for the last three years, has caused complete drying off of the surface water resources and has decreased water output from springs and tubewells. This has also caused the water-table to drop in most of the valleys affecting the population. Due to prolonged drought, about 8% of the livestock have starved to death, with an equal number weakened or succumbed to diseases. Similarly, in the Sindh province, Thar, Kohistan and Kachoo regions, where 95% of the population live below the poverty line, about 1.3 million people have been directly affected by drought and around 30,000 heads of the total 5 million livestock have perished.
Forests
Approximately 5.2% of the total landmass of Pakistan is under some kind of forest cover. Between 1974 and 1985, timber supplies from state forests declined by 45%, in part because of the reduced forest area. The loss to forests occurred at a rate of 0.4% from 1981 through 1984. Now it has decreased to 0.2% per annum. This figure translates into the destruction of 7,000 to 9,000 ha of forested land every year. Today, Pakistan imports about 30% of the timber it uses.
Efforts for afforestation and watershed management have not kept pace with the increasing demand for timber and excessive cutting and overgrazing. The heavy deforestation stems from a number of factors. During the colonial and post-independence periods, entrepreneurs commercially exploited large forest tracts to meet the demands of a growing rural and urban population. With the development of canals, hundreds of thousands of hectares of riverine, scrub and forestland in the Indus plains were cleared for agriculture. Energy demand has also increased pressure on the forests. With the increase in population, further increase in wood consumption is hardly surprising.
The negative consequences of uncontrolled forest exploitation are obvious. They include: soil erosion and sedimentation, desertification of once-productive upland areas, silting up of waterways in plains thus making them more prone to flooding, and marked scarcities of fuel wood and building timber which creates an economic burden on low-income communities.
Loss of Biodiversity
Pakistan lies at the Western end of the Indian sub-continent and the Iranian plateau. Its landscape and habitats are diverse, and about 26 types of habitats exist in the country. It has a varied and interesting mix of flora and fauna, which are composed of a blend of Palearctic and Indomalayan elements, with some groups also containing forms from the Ethiopian region.
Wetlands: There are nine major ecological zones and 21 out of the 22 recognized Asian Wetland types in Pakistan. About 6,000 plant species have been identified, of which around 5,000 are indigenous and 370 species (6% of the total) are considered to be endemic. The wild relatives of domesticated crops are very important gene-banks for resistance against pests and diseases and as carriers of parasites, predators and pollinator of important crops, when the main crop is over. There are about 2,000 plant species that have medicinal value, yet 90% of Pakistan’s medicinal herb is imported.
The varied landscape of Pakistan contains wetlands from the Indus delta and mudflats to the glacial lakes of the High Himalayas, as well as artificial canal reservoirs. Surrounded by the Hindukush and Karakoram ranges, the valley of Chitral is a flyway for a number of migratory birds, specifically waterfowl. In the past common hunting was prohibited and only the royal family members were allowed to have their occasional hunting. However, since 1969 royal restrictions ended and migratory birds started falling prey to the guns and traps of the local hunters and poachers. The most highly abused species were of the waterfowl. According to WWF-Pakistan’s survey, 100,000 ducks are being lost annually to indiscriminate hunting and poaching. Falcons passing through Chitral is another species whose population is declining fast.
Animals: Ten of the 18 mammalian orders are represented in Pakistan, including the world’s smallest surviving mammal, the Mediterranean pigmy shrew as well as the largest mammal in existence today, the blue whale. Major groups of birds include: waterfowl, waders, raptors, pheasants, partridges, herons, cranes, storks, ibises, pelicans, flamingos, terns, gulls, bustards, sand grouses, parrots, crows, song birds and fancy birds. Of the 72 snake species found in Pakistan, only 14 marine and 12 terrestrial snake species are poisonous; most well known are the Indian cobra, common krait, saw-scaled viper and Russel’s viper. There is high endemism in the reptilian taxa especially in the Chaghai district in Balochistan.
A range of globally threatened species are found: including the Snow Leopard, Himalayan Lynx, Marco Polo Sheep, blue Sheep, Ladakh Urial, markhor, Musk Deer, the Wooly flying Squirrel, Indus dolphin and marine turtles.
Marine & Coastal: About 400 species of marine fish and 150 native fresh water fish (plus several species introduced for sport fishing) are found in Pakistan of which 17 are endemic. Fish species diversity is highest in the Indus River plains and in adjacent hill ranges (Kirthar range) and in the Himalayan foothills in Hazara, Malakand, Swat and around Peshawar. The marine and coastal ecosystem is threatened due to discharge of untreated industrial and municipal waste and harbor activities.
Ecosystems Diversity: Pakistan has three ecosystems which are of unique ecological interest and international importance. These are (i) the Indus riverine zone, (ii) Juniper forests of Northcentral Balochistan, and (iii) the Chagai desert in Southwest Balochistan. There are a few pure stands of juniper forest in the world and those of Northcentral Balochistan are believed to be the most extensive examples remaining. Many of the juniper trees are known to be over 2,500 years old. The forests contain a unique flora and fauna, having Sino-Himalayan, Central Asian, Iranian and Turkish affinities. There is no commercial exploitation of Juniper forests, but cutting of trees for fuelwood has depleted the forest, and regeneration is hampered by unrestricted livestock grazing. The junipers are particularly susceptible to the effects of overexploitation owing to their extremely slow rate of regeneration. A total of 37,247 hectare are now included in Ziarat Juniper Wildlife Sanctuary but there is no management plan for these forests.
Protected Areas: Over the course of the past three decades, Pakistan's Protected Areas (PA) system has expanded to include 227 sites that are listed as protected areas on the national register. Although the overall number of sites and the percentage of the country considered protected (11.25%) are impressive, this figure includes sites established without a basis in legislation. If only sites established under Provincial and Territorial Wildlife Acts and Ordinances are considered, then their number drops to 200: 14 National Parks, 97 Wildlife Sanctuaries and 89 Game Reserves. If only the national parks and wildlife sanctuaries are considered as PAs, as these provide protection to biodiversity because they also protect habitat, then the overall number of protected areas is further reduced to 111- a drop of protected land from 11.25% to 6.5% which warrants re-classification of the PAs and the development of management plans for biodiversity conservation.
In summary the threats to biodiversity in Pakistan are: (i) degradation of ecosystems by domestic livestock, leading to a loss of habitat quality; (ii) hunting for food and sport and in retaliation against livestock predation; (iii) forest loss owing to the unsustainable harvest of fuelwood, trees for the construction of shelters and fodder for livestock; (iv) over-harvest of medicinal plants and other economically useful flora; (v) disease transmission from livestock to wild fauna, particularly closely related species. The wetlands and coastal ecosystems are further threatened by industrial / urban pollution which effects water-bodies; commercial fishing; hunting; and harbor development. The underlying causes of these threats are: (i) communities have little utilitarian stake in protecting the resources (lack of participatory management); (ii) poorly developed legal instruments to support community-based conservation initiatives; (iii) weakly developed incentives, (iv) lack of information exchange and networking among communities; (v) weak technical, human and institutional capacities amongst government and non-government agencies responsible for conservation; (vi) expansion of agriculture; (vii) minimal opportunities for livelihoods, water and fuelwood; (vii) limited access to alternate fuel sources; and (viii) poorly developed moral values for wildlife.
Agricultural Biodiversity: The non-judicious use of pesticides is another example of strong poverty-environment nexus. The consumption of pesticides has increased from 665 tons in 1972 to 44,872 tons in 1998. Despite the heavy use of pesticides in the country, outbreaks of pests occur regularly, causing billions of dollar loss to the economy, environment and human health. Several research studies conducted at the national and international institutions have revealed the presence of pesticide residues in soil, groundwater and food items, especially fruits, vegetables and edible oil. Women and children in particular, suffer from the residues of pesticides while picking cotton, which is heavily sprayed with pesticides (10-12 sprays per season).
The integrated pest management has not been promoted in the country due to several reasons. Although the farmers are aware of the health hazards due to pesticides, they are forced to use leaking, obsolete sprayers due to lack of credit for the purchase of efficient spray equipment. Furthermore, they obtain pesticides (mostly inferior quality) from dealers on credit as they do not have access to credit. The use of inferior quality pesticides has resulted in low cotton production due to the resurgence of pests, inhalation of natural enemies and development of resistance in key pests. The cotton ecosystem has been eroded eversince highest level achieved in 1992 (12.8 million bales) in the history of Pakistan
Environmental Health and Safety: Persistent organic pollutants, solid waste disposal, industries using hazardous chemicals, over use of pesticides and fertilizers pose serious threat to human and other living beings. It is of utmost importance that actions are taken to avoid harmful effect on the environment due to such elements.
Disposal of Liquid and Solid Waste
Resource capture opportunities often prompt a migration of dispossessed inhabitants from affected areas in search of a better life. Receiving areas-whether rural or urban- are frequently ecologically vulnerable and are further degraded as incoming migrants place an additional stress on existing resources. According to the 1981 census, of the 5.92 million persons who had migrated within the country, 87.6% moved from rural to urban areas, while only 12.4% moved in the opposite direction. Over 50% of them permanently settled in cities. The chief factors responsible for such migration were: slow progress in the agriculture sector, low crop yields, lack of alternate employment opportunities and environmental degradation due to waterlogging / salinity, deforestation and desertification.
The large rural influx has, in turn, contributed to the overburdening of urban infrastructure and urban services. There has not only been a rapid decline in the quality and availability of basic urban resources and amenities, such as housing, potable water, transportation, electricity, gas, drainage and sewage but also a mushrooming of katchi abadis (squatter settlements), often located on the most marginal land. Today, squatter settlements account for about 25 to 30% of Pakistan’s overall urban population. The municipal institutions have not sufficient resources and technical capacity to accommodate needs of increasing urban population.
The poor communities residing in urban settlements are often engaged in a number of initiatives on self-help basis, e.g., solid waste management and recycling. Almost all the paper, plastic, metals and glass are collected and re-used / recycled. Thus the poor communities in urban settlements play a key role in waste recycling. The only waste which remains on streets and collection points is the organic waste. This could be used for making compost but neither the municipalities nor private sector has moved towards this business.
Unfortunately, none of the cities in Pakistan has sewer water treatment plant- all of it either stays in streets due to lack of proper drainage infrastructure or goes to waterways. Likewise, only a fraction of the solid waste is collected and disposed of properly. The incidence of diseases related to in-sanitation and unsafe drinking water, like diarrhea, hepatitis, etc., is on the rise.
The poor are more prone to suffer the adverse health impacts. This is both because of their greater exposure to polluted water, as well as the lack of health facilities to deal with them. Absence of adequate nutrition, lack of education and overcrowded housing increase their vulnerability to diseases. Low income neighborhoods mushroom around industrial areas and power plants, where exposure to air pollution is high. The poor also work long hours in factories in unsafe conditions; in particular, women and children are the most vulnerable, exposed to dust and chemical inhalations in household industries producing carpets, textile and leather goods. Poor communities are the most exposed to auto-emission and other toxic fumes, as they tend to live close to the main trunk roads. The environmental factors are responsible for at least 45% of the burden of diseases (16,350.4 disability-adjusted life-years "DALYs" per 100,000 population). The impact of water and air pollution on human health is estimated to be $ 759 million and $ 301, respectively.
Vehicular and Industrial Pollution
The manufacturing industry is the second largest sector of the Pakistani economy, however it’s disappointing performance since 1970 highlights its continuing structural weaknesses, and inability to adjust to the economic liberalization measures introduced during this period, as part of the series of structural adjustment programmes.
A survey of industrial units all over Pakistan, conducted by the Environmental Protection Agencies, revealed extreme deviations in the level of toxic chemicals in air emissions and wastewater from the levels prescribed in the National Environment Quality Standards (NEQS). The untreated effluents contaminate water bodies and make water unfit for human consumption and aquatic life. Similarly, smoke emissions from the factories’ stacks and disposal of industrial refuse is a serious threat to the atmosphere, soils and health of nearby inhabitants who are generally poor.
A little effort has been made until recently, either to use clean production technologies, or to adopt end-of-pipe methods of pollution control. Pollution problems affect both large enterprises in such industries as chemicals, petroleum refining, sugar, paper and pulp and iron and steel, as well as the many clusters of small- and medium-sized enterprises in industries such as leather, textiles, marble polishing and food processing. The minimal response of industry to pollution control is mainly due to the poor performance of the sector, lack of information about new technologies and high investments required for changing the processes; and also due to lack of enforcement of regulatory framework.
Pakistan imports almost 3.8 million tons of oil per annum at a cost of about US $ 581 million. These oil imports are further increasing proportionally to the ever-rising human and vehicular population. Another problem directly associated with the road transport sector is its contribution to air pollution. Owing to the high proportion of old and un-tuned engines and the dependence on buses and light commercial vehicles in metropolitan areas, air pollution along busy roads is greater in magnitude than would be expected for the number of vehicles on the road. Air pollution is caused by suspended particulate matter, sulfur dioxide, carbon monoxide, nitrous oxides and lead. Motor vehicles account for 90% of total emissions of hydrocarbons, aldehydes and carbon monoxide in cities, and for three-fourths of all sulfur dioxide and nitrogen oxides. The suspended particulates in air cause lung irritation, sinus problems, bronchitis and asthma, whereas lead emitted by gasoline vehicles causes liver dis-function and impairment of mental health. A recent study conducted by the Agha Khan Medical University concluded that 80% of the sampled children in Karachi had less than normal IQ level.
The vehicular pollution problem is further compounded by the fact that the old model automobiles which have completed their lifetime are in use as the people lack enough resources to buy new automobiles and the country cannot afford to spend foreign exchange for this purpose. Such automobiles are not only energy in efficient, rather these emit more hazardous gases than the standards established by the auto-industry. As the price of diesel in the local market is about 50% less than that of gasoline, conversion of gasoline engines to diesel is a common practice. The air pollution due to diesel engines is very high. Thus there is a link of poverty with the degradation of urban environment. Above all, the lack of awareness / education among mechanics and automobile owners about vehicular pollution is the major impediment in improving urban air quality.
Climate Change
Scientists’ best calculations to date indicate that as a consequence of the steady increase in the atmospheric concentration of greenhouse gases, the earth is likely to be 1-2 degrees Celsius warmer by 2003 than it is today. Although Pakistan’s contribution to this global problem is relatively small, at least at current rates of fossil fuel use, the anticipated implications could be potentially large.
According to the NCS, changes in temperature and rainfall patterns in Pakistan may cause wet areas to become wetter and the monsoon to become more vigorous; arid areas are expected to become drier and to suffer greater evaporation losses. Semi-arid areas may be converted to deserts. Low-lying areas may become salinized. Mountain glaciers and snowfields are likely to recede, possibly creating a reduction over time in the water available for agriculture in the northern valleys that depend on summer snowmelt. This melting, together with the expansion of warmer oceans, is expected to cause a rise in sea levels of between 10 and 20 centimeters within the next 40 to 50 years. The sea level rise will result in regular flooding of many coastal settlements, loss of major mangrove resources, and thus serious consequences for mangrove-dependent fisheries. The poor communities who have no choice to leave the place or invest in measures necessary for mitigating the climate change effects will be the most effected.
As in case of Balochistan, the province has received less than normal rainfall during the last three years, which has resulted in a severe drought responsible for displacement of millions of people and perishing of livestock. The poor families in drought-stricken areas are again in poverty trap. According to UNDP’s Emergency Response Division, during 2000 Afghanistan, India, Iran and Pakistan have been seriously affected by drought. This may be a climate change effect.
Ozone Depletion
Halogenated hydrocarbons have been added to the natural environment in steadily increasing amounts over several decades as a consequence of their growing use, chiefly as aerosol propellants and as refrigerants. The chlorofluorofmethans have been detected throughout the troposphere in amounts roughly corresponding to the integrated world industrial production to date.
Observations of the atmosphere have proved depletion of Ozone over the middle and higher latitudes, and an "Ozone Hole" annually over the South Pole. Scientists have linked the ozone depletion and the "hole" to the increasing emissions of Ozone Depleting Substances (ODSs): Chlorofluorocarbons (CFCs), Hydrochlorofluorocarbons (HCFCs) and Halons, as well as Carbon tetrachloride, Methyl chloroform and Methyl bromide. The chemical inertness and high volatility, which make these materials suitable for technological use also, mean that they remain in the atmosphere for a long time (40-150 years). Photodissociation of the chlorofluoromethanes in the stratosphere (10-50 km above the earth) produces significant amounts of chlorine atoms, and leads to the destruction of atmospheric ozone.
The ozone layer is important as it screens the ultraviolet radiation reaching the earth’s surface from the sun. Excess exposure to ultraviolet radiation is known to raise the incidence of skin cancer among exposed populations, can increase cataract problems and may affect crop yields and forest growth. To date, the reduction in ozone layer thickness has been identified over polar and temperate regions of the earth, but the problem could spread to other areas.
Alarmed by these discoveries, governments agreed in 1985 upon the Vienna Convention for the Protection of the Ozone Layer and in 1987 on the Montreal Protocol on Substances that Deplete the Ozone Layer. The Montreal Protocol mandates the phase-out of the ODSs by all countries according to a specified timetable. Pakistan is signatory to Montreal Protocol. It is not a producer of ODSs, however, the total consumption of ODSs in Pakistan is 1676.8 metric tons per annum. A UNDP-funded project is in operation since 1996 and the project has identified various industries for a shift to the use of non-ODSs. However, the response of industry for shifting to non-ODSs is very slow as the price of ODSs is lower than the non-ODSs which warrants a policy decision by the GoP.
In summary, like in other developing countries, Pakistan’s policies did not address the issues of sustainable development and environmental protection in the national decision-making process. Unregulated use of forests, land, water, urbanization, expansion of agriculture but not attempting to increase the crop yield, misuse of pesticides, ecological and health-wise hazardous industrial processes are due to in-sensitivities to poverty-environment nexus and flaws in policies.
ANNEX – II
Excerpts From
United Nations Millennium Declaration
The General Assembly
Adopts the following Declaration:
United Nations Millennium Declaration
20. We also resolve:
25. We resolve therefore:
26. We will spare no effort to ensure that children and all civilian populations that suffer disproportionately the consequences of natural disasters, genocide, armed conflicts and other humanitarian emergencies are given every assistance and protection so that they can resume normal life as soon as possible. We resolve therefore:
Annex III
Poverty Alleviation and Sustainable Development Facility (PAF)
This project is at an advanced stage of approval and aims at setting up a participatory learning and monitoring facility to promote the knowledge of sustainable development among the policy makers and development practitioners with an ultimate aim to influence the development policy of the country for sustainable development and poverty reduction. The second component of the project aims to establish pilot projects (one urban and one rural) to demonstrate the effectiveness of community-based interventions for improving their livelihoods as well as environmental enhancement. Special focus will be on water harvesting, conservation and its efficient use to support livelihood in dryland areas. The third component aims to provide support to the newly established "Center for Research in Poverty Reduction and Income Distribution" (CRPRID) in the Planning Commission to support and coordinate the work of poverty monitoring / reduction and policy advice to the Government. The participatory development experiences gained through the pilots will directly feed into the national development policy, through the above-mentioned participatory learning and monitoring facility. The project will be funded by UNDP, Capacity 21 and UN Human Security Fund.
The project has been approved by the Planning and Development Division, cleared by the External LPAC, and Capacity 21. Capacity 21 is also following the approval with the United Nations Human Security Fund (UNHSF). As consented by the Government of Pakistan the Project is to be implemented by UNOPS.
Geographical Coverage :
District Thar (Sindh), Poverty Monitoring & IT work in Islamabad.
Objectives/Outputs:
Cost: US $ 1.7 million
ANNEX IV
Expected Outcomes and Monitoring Indicators
|
Programme Objectives |
Expected Outcomes |
Monitoring Indicators |
|
PO 1: Strengthening national capacities in environmental policy formulation, coordination and governance so as to address issues related to poverty-environment nexus in a coordinated and integrated manner |
Policy reforms for environmental conservation and poverty alleviation |
|
|
Coordinated GoP programme for sustainable development |
|
|
|
Increased environmental awareness |
|
|
|
Increased job opportunities |
|
|
|
PO 2: Improving environmental health conditions by minimizing industrial, vehicular and indoor pollution and by protecting drinking water quality. |
Improved environmental conditions in and around industries |
|
|
Sustainable city management |
|
|
|
Improved air and water quality |
|
|
|
Reduced incidence of respiratory diseases |
|
|
|
|
Increased job opportunities |
|
|
PO 3: Sustaining livelihoods through efficient and integrated management of different ecosystems and improved natural resources management |
Increased vegetation cover |
|
|
Sustainable use of biodiversity |
|
|
|
Minimized flow of untreated industrial and municipal effluents into the lakes / canals / rivers /sea |
|
|
|
Increased farm water supply |
|
|
|
Conservation of water |
|
|
|
Increased farm income from waterlogged / saline land |
|
|
|
Protection of animals through protected areas programme |
|
|
|
Increased job opportunities |
|
|
|
PO 4: Mitigating energy crisis/deficit by promoting practices leading to conservation of energy in all sectors of economy, vis-a- vis, buildings, industrial, agriculture and transport sectors and adopting renewable energy technologies |
Energy conservation in all sectors of economy |
|
|
Economical use of renewable energy |
|
|
|
Increased job opportunities |
|
|
|
|
Increased environmental awareness |
|
|
PO 5: Sustaining livelihoods of poor communities in dryland areas (especially in drought prone areas) through better planning for disaster management and promoting community based initiatives for the restoration of environment and regeneration of natural ecosystems |
Efficient disaster management and preparedness institutional infrastructure in place |
|
|
Increased farm water supply |
|
|
|
Conservation of water |
|
|
|
Increased farm income |
|
|
|
Improved watersheds and carrying capacity of rangelands |
|
|
|
Increased job opportunities |
|
|
|
PO 6: Promoting community and NGOs based initiatives developed in the form of innovative micro-level projects on environmental management geared towards localized poverty alleviation |
Improved natural resource management. Increased income generation. |
|
|
Energy conservation at household level |
|
|
|
Economical use of renewable energy |
|
|
|
Increased vegetation cover |
|
|
|
Sustainable use of biodiversity |
|
|
|
Improved sanitation and solid waste management resources |
|
Objectives, Outputs and Indicators
PO 1: Strengthening national capacities in environmental policy formulation, coordination and governance so as to address issues related to poverty-environment nexus in a coordinated and integrated manner
|
Programme Sub-Objectives |
Outputs |
Output Indicators |
Remarks |
|
1.1. To coordinate the environmental policy formulation and implementation process at the federal, provincial and local levels |
Establishment of environmental policy unit in the MoELGRD for policy research and dissemination; this would include support to International Conventions and Protocols, particularly the GEF programme & strategy for Pakistan. |
No. of policy briefs prepared, discussion forums held and instances of policy change by the government; No. of GEF projects moving from pipeline to approval phase |
Project concept and work plan to be developed |
|
Inter-ministerial coordination to update and implement plans of sustainable development |
Improvement in environmental rating of plans of concerned ministries as evident from their projects and reports |
||
|
Development of regional projects, contribution in international policy for resource mobilization |
|
||
|
1.2. To promote the goal of SHD by facilitating capacity building for a higher quality of decision making |
Establishment of GIS in MoELGRD and use of satellite imageries to monitor land use |
|
Project concept and work plan to be developed |
|
Database on environmental and socio-economic indicators |
|
||
|
Studies to document ecosystem health and impacts of policies |
|
||
|
Environmental accounting in national planning process |
|
||
|
1.3. To expand the environmental knowledge base as a mean of securing basis for environmental and natural resource management |
Environment as a compulsory subject in primary and secondary school education |
|
Project concept and work plan to be developed |
|
Environment as a graduate course in colleges and universities |
|
||
|
Trained environmental managers |
|
PO 2: Improving environmental health conditions by minimizing industrial, vehicular and indoor pollution and by protecting drinking water quality
|
Programme Sub-Objectives |
Outputs |
Output Indicators |
Remarks |
|
2.1. To enhance capacity of the industry and EPAs to minimize industrial pollution |
National Cleaner Production Centre for Clean Fuels |
|
Separate document prepared. |
|
National Cleaner Production Centre for Textile |
|
Project concept and work plan to be developed |
|
|
Cleaner production in chemicals, leather, paper & pulp, marble and other polluting industries |
|
Project concept and work plan to be developed |
|
|
Institutional support to industry for phase-out of ODS |
|
Project concept under preparation. |
|
|
Review of tariffs to promote eco-friendly chemicals and machinery in industries |
|
Detailed plan of activities to be developed |
|
|
Capacity building of EPAs for enforcement of environmental laws and accreditation of laboratories for pollution monitoring |
|
Detailed plan of activities to be developed |
|
|
Development / revision / updating of the NEQS |
|
Detailed plan of activities to be developed |
|
|
Strengthening of environmental tribunals and enforcement of environmental laws |
|
Detailed plan of activities to be developed |
|
|
Promotion of self-monitoring and reporting system |
|
Detailed plan of activities to be developed |
|
|
Preparation of annual report on industrial pollution |
|
Detailed plan of activities to be developed |
|
|
Awareness of environment-health nexus |
|
Detailed plan of activities to be developed |
|
|
2.2. To control vehicular pollution to minimize greenhouse gases emissions and improve environmental health |
Expansion of automated engine tune-up programme by mobilizing resources from private sector |
|
Complimentary programme with the on-going project "Fuel Efficiency in Road Transport Sector |
|
Pilot projects to demonstrate emission reductions |
|
Complimentary programme with the on-going project "Fuel Efficiency in Road Transport Sector" |
|
|
Revision of vehicle, fuel and lubricant standards and development & implementation of action plans to minimize vehicular pollution |
|
Complimentary programme with the on-going project "Fuel Efficiency in Road Transport Sector" |
|
|
Promotion of the use of CNG-awareness and local manufacturing of gas-kits |
|
Complimentary programme with the on-going project "Fuel Efficiency in Road Transport Sector" |
|
|
Awareness of environment-health nexus |
|
Complimentary programme with the on-going project "Fuel Efficiency in Road Transport Sector" |
|
|
2.3. To strengthen technical capacities of municipal administration for improving health, sanitation, education, shelter, employment and income generation of the poor |
Strengthened municipalities to develop and implement plans for sustainable cities |
|
On-Going Project on "Improving Livelihoods in Urban Settlements" |
|
Preparation and implementation of action plans for increased clean water supply, wastewater management, solid waste management and improvement of slums on self-help basis |
Action plans developed and implemented for:
|
On-Going Project on "Improving Livelihoods in Urban Settlements" |
|
|
Awareness in environment-health nexus |
|
On-Going Project on "Improving Livelihoods in Urban Settlements" |
|
|
2.4. To protect drinking water quality in urban and rural areas |
Accreditation of water quality monitoring laboratories |
|
Project concept and work plan to be developed |
|
Need assessment and capacity building (training, equipment, and protocol of data reporting) of water quality monitoring laboratories |
|
Project concept and work plan to be developed |
|
|
Assessment of sources of water contamination and identification of polluters |
|
Project concept and work plan to be developed |
|
|
Study on the impact of deteriorated water quality on human health |
|
Project concept and work plan to be developed |
|
|
Development and implementation of action plans to improve water quality |
|
Project concept and work plan to be developed |
|
|
Awareness in environment-health nexus |
|
Project concept and work plan to be developed |
|
|
2.5. To improve health and environmental conditions at the household level |
Promotion of efficient wood stoves and biogas plants |
|
Project concept and work plan to be developed |
|
Literature research on materials causing indoor pollution and advocacy to minimize those |
|
Project concept and work plan to be developed |
|
|
Awareness about indoor pollution and its health impacts |
|
Project concept and work plan to be developed |
|
|
Advocacy for minimizing disparity between natural gas and LPG and expansion of natural gas distribution system to areas not yet covered |
|
Project concept and work plan to be developed |
PO 3: Sustaining livelihoods through efficient and integrated management of different ecosystems and improved natural resources management
|
Programme Sub-Objectives |
Outputs |
Output Indicators |
Remarks |
|
3.1. Integrated and efficient management of natural resources in upland ecosystems for poverty alleviation and biodiversity conservation |
Transformation of existing policies and plans into action plans for the conservation and regeneration of forests and watershed management |
Detailed indicators given in ProDoc of MACP Project |
On-Going Project on "Mountain Areas Conservancy Project" |
|
Regular monitoring of changes in upland ecosystems |
Detailed indicators given in ProDoc of MACP Project |
On-Going Project on "Mountain Areas Conservancy Project" |
|
|
Promotion of social forestry systems in areas which are under severe deforestation stress |
Detailed indicators given in ProDoc of MACP Project |
On-Going Project on "Mountain Areas Conservancy Project" |
|
|
Development of alternative economic opportunities for local communities depending upon forests for their livelihoods |
Detailed indicators given in ProDoc of MACP Project |
On-Going Project on "Mountain Areas Conservancy Project" |
|
|
Conservation and sustainable use of biodiversity, including medicinal plants and eco-tourism |
Detailed indicators given in ProDoc of MACP Project |
On-Going Project on "Mountain Areas Conservancy Project" |
|
|
Awareness and capacity building of forestry institutions for effective management of forests |
Detailed indicators given in ProDoc of MACP Project |
On-Going Project on "Mountain Areas Conservancy Project" |
|
|
3.2. To improve the marine and coastal environment by protecting and conserving ecosystems and species and sustainable livelihoods of local communities in coastal areas |
Development and implementation of community based integrated coastal area management plans |
% area sustainably managed by the local communities |
Project concept and work plan to be developed |
|
Conservation of threatened species |
|
Project concept and work plan to be developed |
|
|
Minimization of the flow of untreated industrial and municipal effluents into the sea |
Quantity and percent reduction of untreated effluents |
Project concept and work plan to be developed |
|
|
Response to any environmental disaster, like oil spill, cyclone, etc. |
Positive feedback of media about response to environmental disaster |
Project concept and work plan to be developed |
|
|
Awareness and capacity building of institutions dealing with coastal area management |
Positive feedback of media about coastal area management |
Project concept and work plan to be developed |
|
|
3.3. To increase farm income through sustainable management of land and water resources by involving the local communities |
Adoption of farming system approaches for saline and waterlogged areas |
Area under biosaline technologies and percent increase per annum |
Project concept and work plan to be developed |
|
Rehabilitation of watercourses through community participation and mobilization of local resources |
Kilometers of watercourses renovated / rehabilitated per annum |
Project concept and work plan to be developed |
|
|
Adoption of high-efficiency irrigation techniques |
Area under high efficiency irrigation techniques and percent increase per annum |
Project concept and work plan to be developed |
|
|
Capacity building of soil testing laboratories for monitoring soil quality and pollution and institutionalization of regular data collection and reporting protocols |
Annual report on water quality and positive feedback of media / communities about service delivery |
Project concept and work plan to be developed |
|
|
3.4. To develop and implement a well-defined system of intervention and strategic plan for the conservation and protection of biological diversity of global significance in representative wetlands of Pakistan |
Development and implementation of community-based management plans for the selected sites, representing inland wetland ecosystem, riverine wetland ecosystem and the coastal wetland ecosystem |
Detailed indicators given in ProDoc of Wetland Project |
On-Going Project |
|
Strengthened institutional capacity to implement the management plans |
Detailed indicators given in ProDoc of Wetland Project |
On-Going Project- |
|
|
Implementation of environmental regulations to minimize flow of industrial and municipal effluents to important wetlands |
Decrease in flow of untreated industrial and municipal effluents to wetlands |
On-Going Project |
|
|
Public awareness campaigns, plans and strategies for sustainable harvest of game birds and eco-tourism |
Amount of revenues earned and distributed among local communities through eco-tourism |
On-Going Project- |
|
|
3.5. To protect Pakistan’s full range of biodiversity in representative areas and help maintain the natural ecosystem and associated cultural heritage |
Establishment of criteria, in accordance with international standards, for the designation of any area as protected |
Revision of criteria, in accordance of international standards, for designating PAs |
Full project document in advance stages of preparation- |
|
Re-classification of listed protected areas and revision of national register on PAs |
PAs reclassified and information made to public and concerned institutions for implementation |
Full project document in advance stages of preparation- |
|
|
Inter-departmental coordination to ensure the protection of PAs, through their own planning and permitting processes |
Satisfactory rating of PAs by independent reviewers |
Full project document in advance stages of preparation- |
|
|
Establishment of a National Park Fund to support the development of selected protected areas |
$ amount of funds collected and re-used for the development of protected areas per annum |
Full project document in advance stages of preparation- |
|
|
Institutionalize user fees and charges for internal mobilization of resources |
$ amount of funds collected and re-used for the development of protected areas per annum |
Full project document in advance stages of preparation- |
|
|
Development and implementation of community programmes to link conservation with the needs of the local people |
Instances of PAs managed satisfactorily by the local communities |
Full project document in advance stages of preparation |
|
|
Development and implementation of training, awareness and education programmes |
No. of persons trained in the management of PAs and level of knowledge about PAs among general public |
Full project document in advance stages of preparation- |
PO 4: Mitigating energy crisis/deficit by promoting practices leading to conservation of energy at the household and industrial levels and adapting the renewable energy technologies
|
Programme Sub-Objectives |
Outputs |
Output Indicators |
Remarks |
|
4.1. To promote measures which result in energy conservation, both in domestic and industrial sector |
Promote technologies and create awareness for energy (gas and electricity) at the household level |
|
Project concept and work plan to be developed |
|
Promote technologies and policy support for energy conservation in large scale industrial enterprises |
|
Project concept and work plan to be developed |
|
|
4.2. To promote renewable energy sources at a wider scale |
Development and promotion of wind energy along the coastal belt of Balochistan and Sindh provinces (full-scale project in preparation) |
|
Project concept and work plan to be developed- feasibility study in progress under the Wind Energy project |
|
Promotion of wind energy for abstraction of groundwater for drinking purposes in drought affected areas of Balochistan and Sindh |
|
Project concept and work plan to be developed- feasibility study in progress under the Wind Energy project |
|
|
Promotion of the solar water heating systems at the household level |
|
Project concept and work plan to be developed |
|
|
Solar-based water de-salination plants in areas having brackish ground water |
|
Project concept and work plan to be developed |
|
|
Promotion of micro-hydel power stations |
|
Project concept and work plan to be developed |
|
|
Awareness and capacity building of institutions dealing with renewable energy |
|
Project concept and work plan to be developed |
PO 5: Sustaining livelihoods of poor communities in dryland areas (especially in drought prone areas) through better planning for disaster management and promoting community based initiatives for the restoration of environment and regeneration of natural ecosystems
|
Programme Sub-Objectives |
Outputs |
Output Indicators |
Remarks |
|
5.1. Establishment of an institutional infrastructure and capacity building for early warning and disaster management |
Assessment of the capacity of existing structure of disaster management and its restructuring |
|
Separate ProDoc to be developed |
|
Promote institutional exchange of information among various public sector organizations |
|
||
|
|
Capacity building of the Meteorology Departments for making appropriate forecasts and interpretation of data |
|
|
|
Training in disaster management and preparedness |
|
||
|
Facilitation of the preparation of plans for the most vulnerable areas through a participatory process |
|
||
|
Radio / TV programmes for dissemination of information about forthcoming disasters) |
|
||
|
5.2. To promote plans and policies which are conducive to groundwater conservation and recharge and help in sustaining livelihoods of poor communities by improved agricultural and livestock production and watershed management
|
Construction of water harvesting ponds with community participation on cost-sharing basis |
|
Separate ProDoc to be developed |
|
Development and implementation of delay action dams, valley dykes, etc. |
|
||
|
Regular monitoring of groundwater t able in Balochistan |
|
||
|
Advocacy for adjustments in electricity tariff rates to minimize abstraction of groundwater |
|
||
|
Watercourse rehabilitation and promotion of high efficiency irrigation techniques |
|
||
|
|